Question_and_Answer_for_SFJ60017Q0006.pdf

PDF 218 KB Posted

Attached to
GENERATOR PURCHASE Federal contract opportunity
Solicitation number
SFJ60017Q0006
Issued by
Department of State US Embassy Suva

About this file

Questions and Answers attached.

View the file

Other files for this federal contract opportunity

Other files attached to GENERATOR PURCHASE, newest first.
File Type Posted
SF30_Amendment.pdf PDF
Question_and_Answer_for_SFJ60017Q0006.pdf PDF
Question_and_Answer_for_SFJ60017Q0006.pdf PDF
RFQ_Generator_purchase_final.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question and Answer for SFJ60017Q0006: GENERATOR PURCHASE

1. Question:

Would it be acceptable to ship the generators to the Department of State European Logistics Support Office (ELSO) in Antwerp Belgium?

Answer:

Yes, the vendor can ship the generators to ELSO. However, the vendor will have to pay ELSO to ship the generators to Suva, Fiji. Please contact ELSO LEENAERTSD@state.gov to get shipping costs.

2. Question:

Do you require the engine speed to be electronically controlled or is the standard mechanical governing suitable for your application - Electronic governing is not standard.

We need electronic controlled injectors

3. Question:

Can you provide more information on the 'Automatic Field Reset Breaker’.

It is optional.

4. Question:

Our standard number of Start attempts is 3 not 8

We need 8. So during PM we can do starts to check all shut downs

5. Question:

All Gauge readings are digitally displayed as standard.

That’s ok.

6. Question:

RPM/Hz readings are measured from the AC alternator as standard - MPU can be provided.

We need all readings from MPU , this should be linked with Ac alternator.

7. Question:

2.3.6 A UL MCCB can be provided, manual reset only. Regarding the Field reset circuit breaker please see my above comments: We can fit a coolant heater and 10 amp battery charger - these are not standard scope of supply.

We need standard 10 amp 5 stage charger.

8. Question:

The generator set is not designed to accept 100% load in one step, please see the engine data sheet attached: Dual wall fuel tank and leak detection is not standard.

Answer:

This is required. We need dual wall tank if the fuel tank ruptures there should be no spillage of fuel. Leak detection is optional.