Question_and_Answer_for_SFJ60017Q0006.pdf
PDF 218 KB Posted
- Attached to
- GENERATOR PURCHASE Federal contract opportunity
- Solicitation number
- SFJ60017Q0006
- Issued by
- Department of State US Embassy Suva
About this file
Questions and Answers attached.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF30_Amendment.pdf | ||
| Question_and_Answer_for_SFJ60017Q0006.pdf | ||
| Question_and_Answer_for_SFJ60017Q0006.pdf | ||
| RFQ_Generator_purchase_final.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question and Answer for SFJ60017Q0006: GENERATOR PURCHASE
1. Question:
Would it be acceptable to ship the generators to the Department of State European Logistics Support Office (ELSO) in Antwerp Belgium?
Answer:
Yes, the vendor can ship the generators to ELSO. However, the vendor will have to pay ELSO to ship the generators to Suva, Fiji. Please contact ELSO LEENAERTSD@state.gov to get shipping costs.
2. Question:
Do you require the engine speed to be electronically controlled or is the standard mechanical governing suitable for your application - Electronic governing is not standard.
We need electronic controlled injectors
3. Question:
Can you provide more information on the 'Automatic Field Reset Breaker’.
It is optional.
4. Question:
Our standard number of Start attempts is 3 not 8
We need 8. So during PM we can do starts to check all shut downs
5. Question:
All Gauge readings are digitally displayed as standard.
That’s ok.
6. Question:
RPM/Hz readings are measured from the AC alternator as standard - MPU can be provided.
We need all readings from MPU , this should be linked with Ac alternator.
7. Question:
2.3.6 A UL MCCB can be provided, manual reset only. Regarding the Field reset circuit breaker please see my above comments: We can fit a coolant heater and 10 amp battery charger - these are not standard scope of supply.
We need standard 10 amp 5 stage charger.
8. Question:
The generator set is not designed to accept 100% load in one step, please see the engine data sheet attached: Dual wall fuel tank and leak detection is not standard.
Answer:
This is required. We need dual wall tank if the fuel tank ruptures there should be no spillage of fuel. Leak detection is optional.