SECTION A

COVER PAGE - SF-1442

OMB APPROVAL NO. 2700-0042

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

1. SOLICITATION NO.

SFJ60016Q0008

2. TYPE OF SOLICITATION

SEALED BID (IFB)

[x] NEGOTIATED (RFP)

3. DATE ISSUED

08/10/16

PAGE OF PAGES

1 81

IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.

4. CONTRACT NO.

5. REQUISITION/PURCHASE REQUEST NO.

6. PROJECT NO.

7. ISSUED BY CODE 8. ADDRESS OFFER TO

US EMBASSY SUVA

158 PRINCES ROAD

SUVA, FIJI

CONTRACTING OFFICER

US EMBASSY SUVA

158 PRINCES ROAD

Suva, Fiji

Email: GSO_Suva@state.gov

9. FOR INFORMATION

CALL:

A. NAME

CONTRACTING OFFICER

B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)

+679 331-4466

SOLICITATION

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder.”

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no., date):

BME Airstack Multistack services

The United States Embassy in SUVA, FIJI requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Multistack Air Cooled Package Modular System.

11. The Contractor shall begin performance when advised by the Contracting Officer or COR after receiving award, notice to proceed. This performance period is mandatory, negotiable.

12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If “YES,” indicate within how many calendar days after award in Item 12B.)

YES NO

12B. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

A. Sealed offers in original and one copy to perform the work required are due at the place specified in Item 8 by 12 noon (hour) local time

September 12th 2016. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror’s name and address, the solicitation number, and the date and time offers are due.

B. An offer guarantee is, is not required.

C. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

D. Offers providing less than _30__ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

NSN 7540-01-155-3212 1442-101 STANDARD FORM 1442 (REV. 4-85)

Computer Generated Prescribed by GSA

FAR (48 CFR) 53.236-1(e) mailto:GSO_Suva@state.gov

Computer Generated STANDARD FORM 1442 BACK (REV. 4-85)

OFFER (Must be fully completed by offeror)

14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)

15. TELEPHONE NO. (Include area code)

16. REMITTANCE ADDRESS (Include only if different than Item 14)

CODE FACILITY CODE

17.The offeror agrees to perform the work at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the

Government within _____ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item

13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)

20B. SIGNATURE

20C. OFFER DATE

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

27.

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY: FMO OFFICE

US EMBASSY SUVA

158 PRINCES ROAD

SUVA, FIJI

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return 2 copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.

29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO

SIGN (Type or print)

31A. NAME OF CONTRACTING OFFICER (Type or print)

30B. SIGNATURE

30C. DATE

31B. UNITED STATES OF AMERICA

BY

31C. AWARD DATE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SCOPE OF SERVICES

The Contractor shall provide personnel, supplies and equipment, for preventive maintenance services for Multistack, Airstack Chiller System WTFO-15A, Serial # 15-A-

00G-02P-O at the US Embassy Suva as described in Section C, DESCRIPTION/SPECIFICATIONS/WORK STATEMENT, of this contract.

B.2 TYPE OF CONTRACT

This is a fixed price type contract for preventive maintenance services for

Multistack, Airstack Chiller System WTFO-15A, Serial # 15-A-00G-02P-O. The fixed price will include all work, including furnishing all labor, materials, equipment and services, overhead (including cost of Workers’ Compensation and War-Hazard Insurance, which shall not be a direct reimbursement) and profit, unless otherwise specified. The scheduled work orders shall identify the listed system/equipment or other description, machine number, location, task description, for the Contractor to perform the preventive maintenance services for Multistack, Airstack Chiller System WTFO-15A, Serial # 15-A-

00G-02P-O specified.

A fixed price order will be awarded for unscheduled work or urgently needed services. Individual orders will be issued using the fixed hourly rates identified below.

The fixed hourly rates shall include wages, overhead, general and administrative expenses, and profit. Hours and labor categories for these delivery orders shall be negotiated into a firm-fixed-priced delivery order using the standards identified in the

Means for Maintenance and Repair Costs Data and adjusted for US Embassy Suva

(Information regarding this publication can be made to 517-585-7880). The actual amount of work to be performed, an estimate of the professional/technical effort required, the time of such performance, and the location of the property(ies) shall be authorized by delivery orders issued by the Contracting Officer.

B.3 PRICES/COSTS

B.3.1 Value Added Tax

VALUE ADDED TAX (VAT). The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in Section B.

B.3.2 All prices shall be submitted in USD

B.3.3 Scheduled Maintenance Services

(a) In consideration of satisfactory performance of all the scheduled services required under this contract, the Contractor shall be paid upon completion of each service. No additional sums will be payable on account of any escalation in the cost of materials, equipment or labor (unless mandated by local law), or because of the

Contractor 's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by the maintenance plan is. Nor will the contract price be adjusted on account of fluctuations in the currency exchange rate.

(b) Premium pay for services required to be provided on holidays is included only in the fixed prices for Scheduled Maintenance Services.

B.3.4 Ordering

Ordering - (a) All supplies or services to be furnished under this contract shall be ordered by the issuance of orders by the Department of State. Orders may be issued from the date of the Contracting Officer's signature until the end of the "Period of Performance" applicable to this contract.

(b) Contractor will be asked to submit a cost proposal when given a draft scope of work for an unscheduled task.

(c) Contracting Officer will negotiate and develop firm-fixed-priced delivery orders for each unscheduled or emergency task that needs to be performed.

(d) All delivery orders are subject to the terms and conditions of this contract. This contract shall take precedence in the event of conflict with any order.

B.4 BASE PERIOD PRICES

B.4.1. Scheduled Maintenance Services. The fixed-price for the first year

(starting on the date stated in the Notice to Proceed and continuing for a period of 12 months) for scheduled maintenance services as defined in C.1.5. is:

B.5 FIRST OPTION YEAR PRICES

B.5.1 Scheduled Maintenance Services. The fixed-price for the second year for scheduled maintenance services as defined in C.1.5. is:

B.6 Overseas Travel: The terms and conditions of the Federal Travel Regulations

(FTR) and Joint Travel Regulation (JTR) shall apply to all travel and travel-related matters authorized under this contract; travel and travel-related expenses shall not exceed

CLIN Description Quantity of

Equipment

Type of services No. of service

Unit price / service ($)

Total per year ($)

WTFO-15A

Serial # 15-A-00G-02P-

O

1 Annual 1

001-A GLYCOL Feeder –

WTFO00G

1 Annual 1

001-B PUMP Module –

WTFO02P

1 Annual 1

001-C Compressor Model

WTFO-15A-JH-05-157

1 Annual 1

001-D Compressor Model

WTFO-15A-JH-05-158

1 Annual 1

001-E Compressor Model

WTFO-15A-JH-05-159

1 Annual 1

001-F Travel/Lodging (See B.6) Annual

Total Base Year

CLIN Description Quantity of

Equipment

Type of services No. of service

Unit price / service ($)

Total per year ($)

WTFO-15A

Serial # 15-A-00G-02P-

O

1 Annual 1

002-A GLYCOL Feeder –

WTFO00G

1 Annual 1

002-B PUMP Module –

WTFO02P

1 Annual 1

002-C Compressor Model

WTFO-15A-JH-05-157

1 Annual 1

002-D Compressor Model

WTFO-15A-JH-05-158

1 Annual 1

002-E Compressor Model

WTFO-15A-JH-05-159

1 Annual 1

002-F Travel/Lodging (See

B.6) Annual

Total Option Year 1 the maximum allowable under the FTR and JTR. In connection with authorized travel, the following items may be included in the firm-fixed price of the contract line items in

B.4.1 and B.5.1: (i) the cost of domestic and overseas economy-class (coach) air fare; (ii) the cost of hotel or housing accommodations, meals, and other incidentals when travel is undertaken; and (iii) miscellaneous expenses incurred in connection with the travel.

Miscellaneous travel items such as taxi fares and other ground transportation expenses incurred in connection with the travel, and, if applicable, passport/visa fees, passport/visa photographs, travelers check fees, and airport taxes may be included in the firm-fixed price of the contract line items B.4.1 and B.5.1.

GRAND TOTAL

Base Year Total: _______________

First Option Year Total: _______________

GRAND TOTAL: _______________

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C.1. INTRODUCTION

C.1.1 General. The US Embassy Suva requires the Contractor to maintain the following systems in a safe, reliable and efficient operating condition.

Multistack, Airstack Air Cooled Package Modules Chiller System WTFO-15A, Serial #

15-A-00G-02P-O with associated Glycol Feeder, Pump and associated compressors

WTFO-15A-JH-05-157, WTFO-15A-JH-05-158 & WTFO-15A-JH-05-159.

The Contractor shall furnish managerial, administrative and direct operational personnel to accomplish all work as required in this contract. The Contractor shall designate an

English speaking representative who shall supervise the Contractor's workforce and be the Contractor's liaison with the U.S.

The designated person shall be located on-site in an office designated by the Contracting

Officer during normal Embassy working hours and shall have supervision as his/her sole function during the times s/he is on duty. The Contractor's employees shall be on-site only for contractual duties and not for any other business or purposes. Specific services are described in detail below.

C.1.2 Personnel. The Contractor shall be responsible for providing qualified technicians

(with at least one of each trade at the journey-man level or equivalent) with relevant experience of more than 3 years to meet the minimum requirements established below to perform maintenance services. Helper positions do not need to meet this 3 year minimum requirement.

C.1.3 Definitions.

"Chancery" means the building of the embassy used for official activities or means the official residence of the ambassador.

“CMMS” is a computer maintenance management system such as PASS/RPA (real estate management system), PMCI or QUIBIC.

"CMP" is a comprehensive maintenance plan

"Daily" means 5 days per week, on each non-holiday workday.

"DCMR" means the official residence of the Deputy Chief of Mission.

"Emergency Services" are task orders which require immediate attention. May involve working other than normal work day or hour as defined in F.8. Contractor required to respond to call within 8 hours and take action to minimize emergency situation.

"EOB" means Embassy Office Building.

"Execution Plan" is submitted by the Contractor and defines the methods and disciplines used to carry out the maintenance plan.

"General Instructions" mean those instructions, directives and guidelines that apply to all employee maintenance personnel.

"HVAC" means Heating Ventilating Air Conditioning.

“Make Readies” should be negotiated as unscheduled work orders.

"NOB" means New Office Building

"PM" means Preventive Maintenance

"Routine Maintenance and Repair" includes the preservation in a sound state of real property and might include day-to-day electrical and plumbing work, and the purchase of maintenance stock.

"Scheduled Maintenance Services" includes all routine maintenance functions, Comprehensive Maintenance Plan or Facility Maintenance Plan, for Post systems and equipment.

"Unscheduled Maintenance and Repair Services" includes minor maintenance and repair services which are not identified in the Comprehensive Maintenance Plan or Facility

Maintenance Plan.

C.1.3.1 The Contractor shall provide an Executive Plan to carry out the maintenance.

These duties and responsibilities described in Subsection C.1.5. The Contractor shall provide a draft of the Executive Plan to the COR for review 30 days after contract award.

C.1.5 Duties and Responsibilities.

Services to be performed by these engineers shall include those outlined below. Damage or situations requiring major or specialized remedial services shall promptly be brought to the attention of the COR or the Embassy Buildings Management Office, and efforts shall be made to minimize such trouble or damage until proper corrective action can be taken.

Major and specialized repairs shall be carried out by the Government, independent of this contract. Services to be performed as part of scheduled maintenance to include:

GENERAL INFORMATION:

The United States Embassy in SUVA, FIJI requires professional services and contractor cost proposals to perform preventive maintenance services of the facility’s Multistack Air

Cooled Package Modular System.

DESCRIPTION OF EQUIPMENT *:

• Multistack, Airstack Air Cooled Package Modules Chiller System WTFO-15A, Serial # 15-A-00G-02P-O. with associated Glycol Feeder, Pump and associated compressors WTFO-15A-JH-05-157, WTFO-15A-JH-05-158 & WTFO-15A-JH-05-159

GENERAL REQUIREMENTS:

The Contractor under this SOW will be responsible for labor, tools, and materials required to carry out all preventive maintenance as outlined in this SOW. Embassy staff has service manuals for all

SCOPE OF WORK - - CHILLER PREVENTIVE MAINTENANCE

Contractor shall provide all materials, supervision, labor, tools and equipment to perform preventive maintenance. All personnel working in the vicinity shall wear and /or use safety protection while all work is performed. Any questions or injuries shall be brought to the attention of the Post Occupation Safety and Health Officer (POSHO). Safety Data

Sheets (SDS) shall be provided by the Contractor for all HAZMAT materials. Copies will be provided to the COR for approval.

If any discrepancies are found with the MultiStack Air Cooled Package Modular Chillers that are not covered under this scope of work then the contractor must provide a detailed report noting the discrepancy found.

Annual Schedule – At a minimum, the following work must be done:

Annual Maintenance requirements for MultiStack ASP Chillers require proper shut-down of the machine, the contractor must ensure that all the current Manufacturer’s

Preventative Maintenance bulletin are on hand and that all the manufacturer’s instructions and recommendations are strictly adhered to.

Electrical Controls

1. Check all external interlocks

2. Inspect compressor terminals

3. Check compressor crankcase heater operation

4. Tighten all contactor, relay and circuit breaker terminals

5. Check and calibrate all compressor safety controls

6. Check and record voltage and amperage for compressors

7. Check and record amperage for pumps and condenser fans

8. Check and calibrate low ambient/fan cycling controls

9. Inspect relay contacts for damage or pitting

10. Verify condenser fan operation

11. Verify temperature sensors

Refrigeration Components

1. Analyze refrigerant with tube type moisture/acid analyzer

2. Check and record refrigerant sub-cooling and superheat

3. Check liquid solenoid valves

4. Check expansion valve and sensing bulb connection

5. Clean condenser coils

6. Perform operation check on each module

Chilled Water System

1. Clean pump strainers and system strainers

2. Remove head caps and clean the ECHW strainers in accordance with the

MultiStack Annual Cleaning Procedure.

3. Check glycol, inhibitor content in system chilled water.

Cabinet and Related Hardware

1. Dry clean electrical panels remove debris

2. Apply protective coatings or wax if required.

Update Maintenance Log Book

C.1.5.3 Miscellaneous Maintenance and Repair Services:

The detailed work requirements and instructions including emergency works shall be provided by the Contracting Officer to the Contractor's Liaison who shall supervise, schedule, and manage the performance of the assignments.

All personnel assigned by the Contractor for the performance of the respective services shall be regular employees of the Contractor, and shall be supervised by the Contractor.

There shall be no employer-employee relationship between the Government and the personnel. Subcontractors may only be employed with the express written consent of the

Contracting Officer.

C.2 SUPERINTENDENCE BY CONTRACTOR:

The entire operation of the contracted services shall be superintended by the Contractor's

English speaking liaison, who shall maintain a close contact with the Contracting Officer and the COR in order to coordinate the performance of the contracted services with the needs of the Government.

The liaison, (or his/her qualified assistant), shall be on duty throughout the normal operating hours of the Embassy. S/he shall also superintend the performance of the contracted services on Saturdays, Sundays, and holidays.

C.3 QUALITY ASSURANCE

The Contractor shall institute an appropriate inspection system including checklists of duties to be carried out, ensuring these duties are carried out by the supervisory staff and senior employees, and carrying out weekly inspections to determine whether the various services are being performed according to the contract requirements. Copies of the weekly inspection reports shall be provided to the COR.

Any shortcomings and/or substandard conditions noted in such inspections shall be promptly corrected and improved; any conditions beyond the responsibility of the

Contractor shall be brought to the attention of the Contracting Officer or COR, for disposition.

C.3.1 Report: The Contractor shall render an annual Multistacj maintenance report, summing up observations resulting from the inspections, difficulties or irregularities encountered, measures taken, improved conditions, repairs or services needed (those beyond the Contractor's responsibilities), special work done, recommendations, and other matters related to operation and maintenance of the buildings and facilities covered by this contract. The report shall be provided and signed by an authorized representative of the Contractor, and shall be submitted to the COR, together with the Contractor's invoice.

C.3.2 Inspection by Government: The services being performed hereunder and the supplies furnished therefor will be inspected from time to time by the COR, or his/her authorized representatives, to determine that all work is being performed in a satisfactory manner, and that all supplies are of acceptable quality and standards.

The Contractor shall be responsible for any countermeasures or corrective action, within the scope of this contract, which may be required by the Contracting Officer as a result of such inspection.

SECTION D

PACKAGING AND MARKING

D. MATERIALS DELIVERED TO THE SITE SHALL BE MARKED AS FOLLOWS:

D.1 MATERIALS SHIPPING ADDRESS

(a) All unclassified reports, data and documentation shall be prepared for shipping in accordance with the best commercial practices.

(b) Classified reports, data, and documentation shall be prepared for shipment in accordance with the National an Industrial Security Program Operating Manual

(DOD 5220.22-M)

(c) Materials delivered to the site shall be marked as follows: The delivery address shall be provided to the Contractor as part of the completed contract.

D.2 DEPARTMENT OF STATE DELIVERY, MAIL AND COURIER

ADDRESSES

D.2.1 The contractor shall include the substance of Provisions D.2 and D.3 in all cleared subcontracts. The substance of D.3 shall be reproduced in all subcontracts.

D.2.2 Classified packages/mail shall NOT be sent via U.S. Postal Service.

Contractors and subcontractors authorized to send classified packages to the

Department shall provide delivery of packages, by appropriately cleared contractor, via approved hand-carry methods in accordance with NISPOM 5-410 and 5-411. All classified hand-carry deliveries from the contractor to DOS shall be made to the following address between the hours 8:00 AM and 4:00 PM. The contractor shall advise the intended recipient of the materials and estimated time of arrival a minimum of 48 hours prior to dispatching the package by courier.

D.2.2.1 Packages/Mail sent to Post:

For packages/mail that need to be sent via Classified shipment, please contact the COR first for ship to address.

D.2.2.2 Packages/Mail sent to the Overseas Building Operations (OBO) Facilities

Group:

ANTHONY PELLEGRINO (703-516-1987)

U.S. DEPARTMENT OF STATE

OBO/CSFM/FAC/PS

1701 NORTH FORT MYER DRIVE

SA-6, ROOM 2012.24

ARLINGTON, VA 22209

ALTERNATE POINT OF CONTACT:

ASENATH HILL (703-812-2223)

D.2.3 Alternatively, GSA Schedule 48, Commercial Delivery Carriers, may be used in accordance with NISPOM 5-403-e, and ISL 2006-02, para 18. Currently, the carriers on that list include:

(a) DHL (Astar Air Cargo) - Same Day Service

(b) FedEx – Same Day Service, First Overnight, Priority Overnight or Standard

Overnight

(c) Airnet Systems – Mission Critical or Same Day Service

(d) United Parcel Service – UPS Next Day Air Early, Next Day Air, or Next Day Air

Saver

(e) UPS Supply Chain Solutions – Constant Surveillance Service

D.2.3.1 Classified Packages/Mail to be delivered via authorized commercial delivery carrier listed above should be addressed as follows:

D.2.3.1.1 Packages/Mail sent to Post:

For packages/mail that need to be sent via Classified shipment, please contact the COR first for ship to address.

D.2.3.1.2 Packages/Mail sent to the Overseas Building Operations (OBO) Facilities

Group:

ANTHONY PELLEGRINO (703-516-1987)

OBO/CSFM/FAC/PS

1701 NORTH FORT MYER DRIVE

SA-6, ROOM 2012.24

ARLINGTON, VA 22209

ALTERNATE POINT OF CONTACT:

ASENATH HILL (703-812-2223)

D.2.4 Unclassified Packages/Mail sent via U.S. Mail, Registered or Certified Mail;

Courier Service and U.S. Postal Service Overnight Express shall be addressed as follows.

NOTE: Classified information cannot be sent via these methods.

D.2.4.1 Packages/Mail sent to Post:

US Embassy Suva

4290 Suva Pl

Washington DC, 20521

D.2.4.2 Packages/Mail sent to the Overseas Building Operations (OBO) Facilities

Group: (Address must be capitalized on Package and Intended OBO recipient’s name should appear only on inner envelope)

ANTHONY PELLEGRINO

OBO/CSFM/FAC/PS

SA-6, ROOM 1202.24

WASHINGTON, DC 20522-0612

D.3 PACKAGING REQUIREMENTS FOR MAIL AND COURIER SHIPMENT

OF DOCUMENTS AND DRAWINGS

D.3.1 Separate packaging of electronic media and hardcopy material

The prime Contractor and any associated subcontractors will package all drawings and electronic media (classified, SBU and unclassified) in separate mailing packages, specifically, electronic media will be transported in electronic media packages that contain no other drawings or hard copies of any kind, beyond that of transfer/receipt documentation. Hardcopy (paper) drawing and documents will be packaged separately.

D.3.2 Wrapping and addressing of packages: For all shipping methods, the prime contractor and any associated subcontractors will ensure that all project documentation, regardless of classification and to include SBU, is double wrapped with both layers addressed properly and labeled with the sender’s address. No indication that the contents are SBU or classified should appear on the outer wrapper. Document tracking receipts should be packaged inside the inner wrapping with the materials the receipt describes.

D.3.3 Packaging heavy materials in appropriate containers: In applying the above double wrapping and addressing procedures, items sent via US mail or commercial carrier weighing more than one (1) pound shall have the inner package enclosed within an appropriately sized double-walled box or, for rolled drawings, a manufactured mailing tube.

D.4 U.S. GOVERNMENT RIGHTS

D.4.1 The U.S. Government reserves the right, in its sole discretion, to determine whether products have been compromised, and therefore cannot be used in CAAs and adjacent areas. Where such compromises results from Contractor's failure to comply with security procedures, the Contractor shall bear entire cost associated with rectification of comprise and restoration of required security provisions.

Reference:

DOSAR 652.242-71 NOTICE OF SHIPMENTS (JUL 1988) Section I.

DOSAR 652.242-72 SHIPPING INSTRUCTIONS (DEC 1994) Section I.

[End of Section]

SECTION E

INSPECTION AND ACCEPTANCE

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates the following clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far/ or http://farsite.hill.af.mil/vffara.htm

These addresses are subject to change. If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Department of State Acquisition website at http://www.statebuy.state.gov/ to see the links to the FAR. You may also use an internet “search engine” (for example Google, Yahoo, Excite) to obtain the latest location of the most current FAR.

FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)

CLAUSE TITLE AND DATE

52.246-4 INSPECTION OF SERVICES – FIXED PRICE (AUG 1996)

52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)

E.2 QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)

This plan is designed to provide an effective surveillance method to promote effective

Contractor performance. The QASP provides a method for the Contracting Officer's

Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the

Government is to conduct quality assurance to ensure that contract standards are achieved.

Performance Objective

PWS

Paragraph Performance Threshold

Services

Performs all maintenance services set forth in the Performance Work Statement (PWS)

C.1 thru C.4

All required services are performed and no more than one

(1) customer complaint is received per month http://www.acquisition.gov/far/ http://farsite.hill.af.mil/vffara.htm http://www.statebuy.state.gov/

E.2.1 Surveillance. The COR will receive and document all complaints from

Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.

E.2.2 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting

Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.246-4, Inspection of Services – Fixed Price (AUG

1996)), if any of the services exceed the standard.

E.2.3 Procedures

(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.

(b) The COR will complete appropriate documentation to record the complaint.

(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.

(d) If the COR determines the complaint is valid, the COR will inform the

Contractor and give the Contractor additional time to correct the defect, if additional time is available. The COR shall determine how much time is reasonable.

(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.

(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The COR will review the matter to determine the validity of the complaint.

(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.

(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the

COR will contact the Contracting Officer for appropriate action under the Inspection clause.

SECTION F

DELIVERIES OR PERFORMANCE

F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

website at http://www.statebuy.state.gov/ to see the links to the FAR. You may also use

FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)

52.242-15 STOP-WORK ORDER (AUG 1989)

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

52.242-14 SUSPENSION OF WORK (APR 1984)

F.2 PERIOD OF PERFORMANCE

The contract shall be effective on the date of the Contracting Officer's signature, and shall remain in effect until 2017, with one option year. Individual delivery orders for unscheduled work will identify completion times for specific unscheduled/urgent tasks.

http://www.acquisition.gov/far/

F.3 DELIVERABLES

The following items shall be delivered under this contract:

Description Quantity Delivery Date

Deliver

To

C.1.3.2 Execution Plan 1 30 days after award COR

C.3. Quality Assurance Plan 1 10 days after award COR

C.3. Inspection Report 1

7 days after end of weekly period COR

C.3.1. Building Maintenance Report 1 5th day of each month COR

H.1.2.3. Bios on Personnel 1 10 days after award COR

H.3. Bonds 1 30 days after award CO

H.4. Insurance/Licenses & Permits 1

30 days after Notice of

Award CO

H.10.1 Safety Plan 1 30 days after contract award COR

H.7.1 Waste Disposal Report 1 Last day of each month COR

F.4 CONTRACTOR'S SUBMISSION OF MAINTENANCE SCHEDULE AND

MINOR REPAIRS UNDER UNSCHEDULED WORK ORDERS

The time for submission of the schedules and General Instructions referenced in Section I, 52.236-15, "Schedules for Construction Contracts", paragraph (a), is hereby modified to reflect the due date for submission as " 90 calendar days after receipt of an executed contract". The Contractor shall weekly revise such schedules (1) to account for the actual progress of the work, (2) to reflect approved adjustments in the performance schedule, and (3) as required by the Contracting Officer to achieve coordination with work by the Government and any separate contractors employed by the Government. The

Contractor shall submit a schedule which sequences work so as to minimize disruption at the jobsite.

All deliverables shall be in the English language, unless otherwise provided hereunder, and any system of dimensions (i.e., English or metric) shown shall be consistent with that used in the contract. No extension of time shall be allowed on account of a delay by the

Government in approving such deliverables if the Contractor has failed to act promptly and responsively in submitting its deliverables. Each deliverable shall be identified as required by the contract.

F.5 ACCEPTANCE OF SCHEDULE

When the Government has accepted any time schedule, it shall be binding upon the Contractor. The completion date is fixed and may be extended only by a written modification to the delivery order signed by the Contracting Officer. Acceptance or approval of any schedule or revision thereof by the Government shall not (1) extend the completion date or obligate the Government to do so, (2) constitute acceptance or approval of any delay, nor (3) excuse the Contractor from or relieve the Contractor of its obligation to maintain the progress of the work and achieve final completion by the established completion date.

F.6 NOTICE OF DELAY

In the event the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are actually causing delays which the

Contractor believes may result in completion of the project after the completion date, the

Contractor shall notify the Contracting Officer of the effect, if any, of such change or other conditions upon the approved schedule, and shall state in what respects, if any, the relevant schedule or the completion date should be revised. Such notice shall be given promptly, and not more than ten (10) days following the first occurrence of event giving rise to the delay or prospective delay. Revisions to the approved time schedule shall only be made with the approval of the Contracting Officer.

F.7 NOTICE TO PROCEED

(a) Following receipt from the Contractor of any bonds or evidence of insurance within the time specified in Section H of this contract, and following acceptance of these documents by the Contracting Officer, the Contracting Officer will provide to the

Contractor a Notice to Proceed. The Contractor must then prosecute the work required hereunder.

(b) It is possible that the Contracting Officer may elect to issue the Notice to

Proceed prior to receipt and acceptance of any bonds or evidence of insurance required hereunder. Issuance of a Notice to Proceed by the Government before receipt of the required bonds or insurance certificates or policies shall not be a waiver of the requirement to furnish these documents.

F.8 WORKING HOURS

All work shall be performed during normal working hours. 8am – 5pm Monday through Thursday and 8am -3pm on Fridays, except for the holidays identified below.

Other hours, initiated by the Contractor, may be approved by the Contracting Officer's

Representative. Notice must be given 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours will not be cause for a price increase.

F.9 EXCUSABLE DELAYS

The Contractor will be allowed time, not money, for excusable delays as defined in FAR 52.249-10, Default. Examples of such cases include (l) acts of God or of the public enemy, (2) acts of the United States Government in either its sovereign or contractual capacity, (3) acts of the government of the host country in its sovereign capacity, (4) acts of another contractor in the performance of a contract with the

Government, (5)fires, (6) floods, (7) epidemics, (8) quarantine restrictions, (9) strikes, (l0) freight embargoes, (11) delays in delivery of Government furnished equipment and

(12) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor, and the failure to perform furthermore (1) must be one that the Contractor could not have reasonably anticipated and taken adequate measures to protect against, (2) cannot be overcome by reasonable efforts to reschedule the work, and (3) directly and materially affects the date of final completion of the project.

F.10 POST AWARD CONFERENCE

A post award conference will be held 10 days after contract award at US Embassy

Suva, 158 Princes Road or via conference call to discuss the schedule, submittals, notice to proceed, mobilization and other important issues that affect the progress under this contract.

SECTION G - CONTRACT ADMINISTRATION DATA

G.1 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR)

(AUG 1999)

(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative

(COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation.

(b) The COR for this contract is the Building Engineer.

G.1.1 Duties

The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract. The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract.

G.2 PAYMENT

G.2.1 General. The Contractor's attention is directed to Section I, 52.232-1, "Payments", and 52.232-5, "Payments Under Fixed-Price Construction Contracts". The following subsections elaborate upon the information contained therein. All invoices should contain copies of the signed work orders completed that month and status information on those not completed. Completed work orders shall bear the signature of the Contractor’s quality control personnel. Work orders shall consist of all preventive maintenance orders as well as unscheduled and emergency orders issued since the submittal of the last invoice.

Invoices shall be submitted in an original and three (3) copies to the Contracting' Officer's

Representative (COR) at the following address (designated payment office only for the purpose of submitting invoices):

FMO

US EMBASSY SUVA

158 PRINCES ROAD

SUVA, FIJI

Email: SUVAFMO@state.gov mailto:SUVAFMO@state.gov

G.2.2 Detail of Payment Requests

Each application for payment, which shall be made no more frequently than monthly, unless otherwise provided herein, shall cover the fixed price preventive maintenance fee and the value of labor and materials completed and in place for individual delivery orders.

In addition, the Contractor shall provide the following support for each request for payment for additional, seasonal, and emergency services:

-Time sheets to support the number of hours worked for each work order and signed by the Contractor’s approving official that work has been completed.

G.2.3 Payments to Subcontractors

The Contractor shall make timely payment from the proceeds of the progress or final payment for which request is being made, to his subcontractors and suppliers in accordance with the Contractor's contractual arrangements with them.

G.2.4 Evaluation by the Contracting Officer

Following receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer shall make a determination as to the amount which, in his/her opinion, is then due. In the event the Contracting Officer does not approve payment of the full amount applied for, less the retainage addressed in

52.232-5, the Contracting Officer shall advise the Contractor of the reasons therefore.

G.2.5 Additional Withholding

Independently of monies retained by the Government under 52.232-5, or otherwise as permitted to be retained under this contract, the Government may withhold from payments due the Contractor any amounts as may be considered necessary to cover

(a) Wages or other amounts due the Contractor's employees on this project;

(b) Wages or other amounts due employees of subcontractors on this project;

(c) Amounts due suppliers of materials or equipment for this project; and

(d) Any other amounts for which the Contractor may be held liable under this contract, including but not limited to the actual or prospective costs of correction of defective work and prospective liquidated damage when the

Contractor has failed to make adequate progress.

G.2.6 Payment

In accordance with FAR 52.232-27(a) the 14 day period identified in FAR 52.232-

27(a)(1)(i)(A) is hereby changed to 30 days.

G.3 VALUE ADDED TAX

VALUE ADDED TAX (VAT). The Contractor shall include VAT as a separate charge on the Invoice and as a separate line item in Section B.

G.3.1 Recordkeeping Requirements

The Contractor and the COR shall both maintain a complete and accurate management file. The file shall contain as a minimum, the following items:

The Government's copies of all task orders issued under this contract, and all inspection reports completed by the COR (OF-127). These forms will be supplied to advise the Contractor of service requests and to document the performance of all work, including emergency work.

Contractor's Service Report forms, documenting arrival and departure time of the Contractor's representative performing the service, and all information on parts installed for unscheduled and emergency services only.

Documentation of any complaints from Post personnel or unusual incidents which may have taken place during the visit to the site.

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H.1 ISSUANCE OF TASK ORDERS FOR UNSCHEDULED/EMERGENCY

WORK

(a) Unscheduled work and emergency work shall be authorized only through the issuance of task orders executed by the Contracting Officer. Task orders shall be established on a firm fixed-price basis (using the hourly rates identified in Section B and negotiated hours) and shall be modified solely by a written modification executed by the

Contracting Officer. Emergency services may require the use of oral orders however a written order shall be provided within 3 business days of the verbal authorization.

(b) The Contractor shall perform only those unscheduled/emergency services specifically authorized in the individual delivery orders issued under this contract. The

Contractor shall complete all work and services under this contract within the period of performance specified in the delivery orders except that no delivery order shall be issued hereunder after the expiration of this contract.

H.2 ORDERING OFFICIAL

In accordance with FAR 52.216-18 ORDERING (OCT 1995), the designated ordering individual for this contract is the Contracting Officer.

H.3 BOND REQUIREMENTS

H.3.1 Bonds Required

The Contractor shall furnish (1) a performance and guaranty bond and a payment bond on forms provided by and from sureties acceptable to the Government, each in the amount of 20% of the contract price, or (2) comparable alternate performance security approved by the Government.

H.3.2 Time for Submission

The Contractor shall provide the bonds required above within thirty (30) calendar days of contract award. Failure to timely submit (1) the required bonds other security acceptable to the Government; (2) bonds from an acceptable surety; or (3) bonds in the required amount, may result in rescinding or termination of the contract by the

Government.

H.3.3 Coverage

The bonds or alternate performance security shall guarantee the Contractor's execution and completion of the work within the contract time and the correction of any defects after completion as required by this contract, the payment of all wages and other amounts payable by the Contractor under its subcontracts or for labor and materials, and the satisfaction or removal of any liens or encumbrances placed on the work.

H.4 CERTIFICATE OF INSURANCE

The Contractor shall furnish to the Contracting Officer a current certificate of insurance as evidence of the insurance required. In addition, the Contractor shall furnish evidence of a commitment by the insurance carrier to notify the Contracting Officer in writing of any material change, expiration or cancellation of any of the insurance policies required not less than thirty (30) days before such change, expiration or cancellation is effective.

When coverage is provided by self-insurer, the Contractor shall not change or decrease the coverage without the Contracting Officer's approval. If the Contractor intends to use any subcontractors under this contract, the Contractor must ensure that the subcontractor carries the types and amounts of insurance as identified below.

The Contractor's attention is directed to Section I, 52.228-5, "Insurance - Work on a

Government Installation". As required by this clause, the Contractor is required to provide whatever insurance is legally necessary. The Contractor, shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:

General Liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)

1. Bodily Injury, On or Off the Site, in US Dollars

Per Occurrence $2,000,000

Cumulative $2,000,000

2. Property Damage, On or Off the Site, in US Dollars

Per Occurrence $500,000

Cumulative $1,000,000

The foregoing types and amounts of insurance are the minimums required. The

Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.

The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from and incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising therefrom, except in the instance of gross negligence on the part of the Government.

The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.

H.4.1 Government as Additional Insured

The general liability policy required of the Contractor shall name "the United

States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.

H.4.2 Insurance-Related Disputes

Failure to agree to any adjustment contemplated under this contract regarding insurance shall be a dispute within the meaning of the clause in Section I, 52.233-1, Alternate I, "Disputes". However, nothing in this clause shall excuse the Contractor from proceeding with the work, including the repair and/or replacement as herein above provided.

H.4.3 Time for Submission of Evidence of Insurance

The Contractor shall provide evidence of the insurance required under this contract within thirty (30) calendar days after contract award. Failure to timely submit this evidence, in a form acceptable to the Contracting Officer, may result in rescinding or termination of the contract by the Government.

H.5 GOVERNING LAW

The contract and the interpretation thereof shall be governed by the laws of the

United States.

H.6 LANGUAGE PROFICIENCY

The manager assigned by the Contractor to superintend the work on-site, as required by Section I, 52.236-6, "Superintendence by the Contractor", shall be fluent in written and spoken English.

H.7 LAWS AND REGULATIONS

H.7.1 Compliance Required

The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the facilities without the permission of the Contracting Officer. Unless otherwise directed by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations and orders and of the contract. In the event of a conflict among the contract and such laws, regulations and orders, the

Contractor shall promptly advise the Contracting Officer of the conflict and of the

Contractor's proposed course of action for resolution by the Contracting Officer.

The Contractor shall provide on a monthly basis an environmental waste report which describes any occurrence of and disposal of hazardous waste encountered during performance of this contract and any resulting delivery orders issued herein.

H.7.2 Labor, Health and Safety Laws and Customs

The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.

H.7.3 Subcontractors

The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.

H.7.4 Evidence of Compliance

Proper documentation and evidence satisfactory to the Contracting Officer of compliance with this clause shall be submitted by the Contractor at such times as directed by the Contracting Officer.

H.8 RESPONSIBILITY OF CONTRACTOR

H.8.1 Damage to Persons or Property

The Contractor shall be responsible for all damages to persons or property that occur as a result of…

This is the start of the file's text. The full file is on GovTribe.