This document is a Purchase Description for a Computer Numerical Control (CNC) Horizontal Boring Mill for the U.S. Navy, specifically for the Puget Sound Naval Shipyard. The solicitation is for one (1) Fives PT 1500 Plain Table CNC Horizontal Boring Mill with an Integrated Contouring Head (ICH), with an option to purchase a second machine at a later date. The machine is a complex manufacturing tool with extensive specifications, including a 118-inch X-axis travel, 99-inch Y-axis travel, multiple spindle configurations, and advanced CNC controller features. Key requirements include compliance with OSHA and military standards, precise positioning accuracy, integrated tooling systems, and comprehensive training for operators and maintenance personnel.

The solicitation includes detailed technical requirements for installation, testing, and acceptance, with the machine to be delivered to Puget Sound Naval Shipyard in Bremerton, Washington. The contractor is responsible for foundation preparation, installation, and conducting rigorous performance tests, including alignment accuracy, operational testing, and noise level verification. The procurement includes extensive tooling, technical documentation, and on-site training for six operators and four maintenance personnel. The initial delivery is scheduled for approximately 406 days after contract award, with an option year pricing mechanism included for potential future purchase of a second machine.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO.

See Block 14

4. REQUISITION/PURCHASE REQ. NO.

22-25-1009

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE SPE4A8 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

CODE FACILITY CODE

SPE4A825R0009

X

2025 AUG 04

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of OffersX X is extended, is not extended.

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

12. ACCOUNTING AND APPROPRIATION DATA (If required)

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc. ) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).X

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

E. IMPORTANT: Contractor is not, X is required to sign this document and return 1 copies to issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A NAME AND TITLE OF SIGNER (Type or print)

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

16B. UNITED STATES OF AMERICA15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

(a) By completing Items 8 and 15, and returning

DLA AVIATION

ASC INDUSTRIAL PLANT EQUIPMENT

6090 STRATHMORE ROAD

RICHMOND VA 23237

15C. DATE SIGNED 16C. DATE SIGNED

D. OTHER (Specify type of modification and authority)

12/09/2025

3. EFFECTIVE DATE

Opening/Closing Date Changed to:

2025 AUG 04 / 2025 DEC 29

TIME 3:00 PM

See Attached Continuation Sheet(s).

(X)

CHECK ONE

9A. AMENDMENT OF SOLICITATION NO.

9B. DATED (SEE ITEM 11)

13. THIS APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 2 OF 10 PAGES

SPE4A825R0009 - 0003

The purpose of this amendment is to:

1. Incorporate the following information into Solicitation SPE4A8-25-R-0009, for One (1) Computer Numerical Control (CNC) Horizontal Boring Mills – Fives Model PT 1500 – Plain Table Horizontal Boring Mill with Integrated Contouring Head (ICH) with the option of purchasing a 2nd at a later date in accordance with Purchase Description VIBB 22-25-1009, dated 29 October 2025 with changes to the following:

Before Amendment:

1.1. Scope. The purchase description set forth below describes the minimum requirements of the Government for two (2) Fives PT 1500 Plain Table CNC Horizontal Boring Mills (HBM) with Integrated Contouring Heads (ICH) provided by Fives G&L. Requirements include but are not limited to tooling, training, foundation, testing. Existing foundation removal is required at the Machine’s installation locations. Existing equipment removal and phased delivery of the machine are outlined in Attachment C.

After Amendment:

1.1. Scope. The purchase description set forth below describes the minimum requirements of the Government for one (1) Fives PT 1500 Plain Table CNC Horizontal Boring Mills (HBM) with Integrated Contouring Heads (ICH) with the option of purchasing a 2nd at a later date provided by Hartech Group, Cage Code 6H5F3. Requirements include but are not limited to tooling, training, foundation, testing. Existing foundation removal is required at the Machine’s installation location as well as the 2nd option. Existing equipment removal and phased delivery of the machine are outlined in Attachment C.

2. Incorporate the following verbiage into the solicitation.

This procurement is for one (1) Fives PT 1500 Plain Table CNC Horizontal Boring Mills (HBM) with Integrated Contouring Heads (ICH) and one (1) Fives PT 1500 Plain Table CNC Horizontal Boring Mills (HBM) with Integrated Contouring Heads (ICH) having the option to purchase at a later date with a 100% Quantity Option in accordance with Purchase Description VIBB 22-25-1009, dated 29 October 2025.

3. Include Attachment B: Option Year Pricing and Delivery Information.

4. Incorporate the following clauses into the solicitation:

•52-217-5 – Evaluation of Options (July 1990): Except when it is determined in accordance with FAR 17.206(b) not to be in the Government’s best interests, the Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement.

(End of provision)

•52.217-7 – Option for Increased Quantity – Separately Priced Line Items (March 1989): The Government may require the delivery of the numbered line item, identified in the schedule as an option item, in the quantity and at the price stated in the schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 30 Days. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree.

(End of provision)

•52.222-43 – Fair Labor Standards Act and Service Contract Labor Standards – Price Adjustment (Multiple Year and Option Contracts)(August 2018)(29 U.S.C. 206 and 41 U.S.C. chapter 67):

(a) This clause applies to both contracts subject to area prevailing wage determinations and contracts subject to collective bargaining agreements.

(b) The Contractor warrants that the prices in this contract do not include any allowance for any contingency to cover increased costs for which adjustment is provided under this clause.

(c) The wage determination, issued under the Service Contract Labor Standards statute, ( 41 U.S.C. chapter 67), by the Administrator, Wage and Hour Division, U.S. Department of Labor, current on the anniversary date of a multiple year contract or the beginning of each renewal option period, shall apply to this contract. If no such determination has been made applicable to this contract, then the Federal minimum wage as established by section 6(a)(1) of the Fair Labor Standards Act of1938, as amended, ( 29 U.S.C. 206) current on the anniversary date of a multiple year contract or the beginning of each renewal option period, shall apply to this contract.

(d) The contract price, contract unit price labor rates, or fixed hourly labor rates will be adjusted to reflect the Contractor’s actual increase or decrease in applicable wages and fringe benefits to the extent that the increase is made to comply with or the decrease is voluntarily made by the Contractor as a result of:

(1) The Department of Labor wage determination applicable on the anniversary date of the multiple year contract, or at the beginning of the renewal option period. For example, the prior year wage determination required a minimum wage rate of $4.00 per hour. The Contractor chose to pay $4.10. The new wage determination increases the minimum rate to $4.50 per hour. Even if the Contractor voluntarily increases the rate to $4.75 per hour, the allowable price adjustment is $.40 per hour;

(2) An increased or decreased wage determination otherwise applied to the contract by operation of law; or

(3) An amendment to the Fair Labor Standards Act of1938 that is enacted after award of this contract, affects the minimum wage, and becomes applicable to this contract under law.

(e) Any adjustment will be limited to increases or decreases in wages and fringe benefits as described in paragraph

(d) of this clause, and the accompanying increases or decreases in social security and unemployment taxes and workers’ compensation insurance, but shall not otherwise include any amount for general and administrative costs, overhead, or profit.

(f) The Contractor shall notify the Contracting Officer of any increase claimed under this clause within 30 days after receiving a new wage determination unless this notification period is extended in writing by the Contracting Officer.

The Contractor shall promptly notify the Contracting Officer of any decrease under this clause, but nothing in the clause shall preclude the Government from asserting a claim within the period permitted by law. The notice shall

PAGE 3 OF 10 PAGES

contain a statement of the amount claimed and the change in fixed hourly rates (if this is a time-and-materials or labor-hour contract), and any relevant supporting data, including payroll records, that the Contracting Officer may reasonably require. Upon agreement of the parties, the contract price, contract unit price labor rates, or fixed hourly rates shall be modified in writing. The Contractor shall continue performance pending agreement on or determination of any such adjustment and its effective date.

(g) The Contracting Officer or an authorized representative shall have access to and the right to examine any directly pertinent books, documents, papers and records of the Contractor until the expiration of 3 years after final payment under the contract.

(End of provision)

DLA Acquisition Notices (DAANs) The following DLA Aviation Acquisition Notices (DAANs) are incorporated by reference. The full-text of the notices can be found at: http://www.dla.mil/Aviation/Business/IndustryResources/DLAResourcesforSuppliers/DAANs.aspx

•DAAN-17-01 – Quantity Option (June 2017)

5. Extend the solicitation close date. The solicitation close date is extended to December 29, 2025.

6. All offers will be considered valid for 120 days from the closing date in this amendment.

7. Before award, direct any questions to Christina Gibbs at Christina.Gibbs@dla.mil.

8. All other terms and conditions remain the same.

List of Attachments:

1. Attachment A: Purchase Description VIBB 22-25-1009, Dated 29 October 2025, for the Acquisition of One (1) Computer Numerical Control (CNC) Horizontal Boring Mills – Fives Model PT 1500 – Plain Table Horizontal Boring Mill with Integrated Contouring Head (ICH) with the option of purchasing a 2nd at a later date.

2. Attachment B: Option Year Pricing and Delivery Information.

PAGE 4 OF 10 PAGES

SUPPLIES/SERVICES: 3408-N00001784

ITEM DESCRIPTION:

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for One (1) Computer Numerical Control (CNC) Horizontal Boring Mills – Fives Model PT 1500 – Plain Table Horizontal Boring Mill with Integrated Contouring Head (ICH).

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 3408-N00001784 2.000 EA $ ________________ $ ________________

IPE - Milling Equipment

QTY VARIANCE: PLUS 0% MINUS 0%

INSPECTION POINT: ORIGIN

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

PREP FOR DELIVERY:

WILL BE PACKAGED IN ACCORDANCE WITH ASTM D3951.

DELIVER ONE (1) EACH TO:

PUGET SOUND NAVAL SHIPYARD

1400 FARRAGUT AVE

BREMERTON, WA 98314

DODAAC:

N00024

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 7011795696 0001 N/A N/A N/A 04/09/2026

SUPPLIES/SERVICES: 3419-N00001761

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for Tooling.

0002 3419-N00001761 1.000 EA $ ________________ $ ________________

IPE - Tooling

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

PAGE 5 OF 10 PAGES

SUPPLY/SERVICE: 3419-N00001761 CONT'D

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0002 7011795696 0002 N/A N/A N/A 04/09/2026

SUPPLIES/SERVICES: 3460-N00004594

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for Training.

0003 3460-N00004594 1.000 EA $ ________________ $ ________________

IPE - Training

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0003 7011795696 0003 N/A N/A N/A 04/09/2026

SUPPLIES/SERVICES: 3460-N00004592

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for Technical Data.

PAGE 6 OF 10 PAGES

SUPPLY/SERVICE: 3460-N00004592 CONT'D

0004 3460-N00004592 1.000 LT $ ________________ $ ________________

IPE - Technical Data

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0004 7011795696 0004 N/A N/A N/A 04/09/2026

SUPPLIES/SERVICES: 3460-N00004587

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for IUID Tag(s).

0005 3460-N00004587 1.000 EA $ ________________ $ ________________

IPE - IUID Tag

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

1400 FARRAGUT AVE

BREMERTON, WA 98314

PAGE 7 OF 10 PAGES

SUPPLY/SERVICE: 3460-N00004584 CONT'D

ITEM PR PRLI PR PRLI Material Need Ship Date .

0005 7011795696 0005 N/A N/A N/A 04/09/2025

SUPPLIES/SERVICES: 3460-N00004584

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for Foundation.

0006 3460-N00004584 1.000 EA $ ________________ $ ________________

IPE - Foundation

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0006 7011795696 0006 N/A N/A N/A 04/09/2026

SUPPLIES/SERVICES: 3460-N00004583

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for Removal of Existing Equipment.

0007 3460-N00004583 1.000 EA $ ________________ $ ________________

IPE - External Services

PAGE 8 OF 10 PAGES

SUPPLY/SERVICE: 3460-N00004583 CONT'D

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0007 7011795696 0007 N/A N/A N/A 04/09/2026

SUPPLIES/SERVICES: 3460-N00004591

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for Shipping.

0008 3460-N00004591 1.000 EA $ ________________ $ ________________

IPE - Shipping

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0008 7011795696 0008 N/A N/A N/A 04/09/2026

PAGE 9 OF 10 PAGES

SUPPLY/SERVICE: 3460-N00004586 CONT'D

SUPPLIES/SERVICES: 3460-N00004586

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for Installation.

0009 3460-N00004586 1.000 EA $ ________________ $ ________________

IPE - Installation

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0009 7011795696 0009 N/A N/A N/A 04/09/2026

SUPPLIES/SERVICES: 3460-N00004588

In accordance with Purchase Description VIBB 22-25-1009, Dated 29 October 2025 for OSHA Certification(s).

0010 3460-N00004588 1.000 EA $ ________________ $ ________________

IPE - OSHA

Certification

ACCEPTANCE POINT: DESTINATION

FOB: DESTINATION DELIVERY DATE: 406 DAYS ADO

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED: PAGE 10 OF 10 PAGES

SUPPLY/SERVICE: 3460-N00004588 CONT'D

1400 FARRAGUT AVE

BREMERTON, WA 98314

ITEM PR PRLI PR PRLI Material Need Ship Date .

0010 7011795696 0010 N/A N/A N/A 04/09/2026

VIBB 22-25-1009

29 OCT 2025

PURCHASE DESCRIPTION FOR ONE (1) COMPUTER NUMERICAL CONTROL

(CNC) HORIZONTAL BORING MILL

1. SCOPE

1.1. Scope. The purchase description set forth below describes the minimum requirements of the Government for one (1) Fives PT 1500 Plain Table CNC Horizontal Boring Mills (HBM) with Integrated Contouring Heads (ICH) with the option of purchasing a 2nd at a later date provided by Hartech Group, Cage Code 6H5F3. Requirements include but are not limited to tooling, training, foundation, testing. Existing foundation removal is required at the Machine’s installation location as well as the 2nd option. Existing equipment removal and phased delivery of the machine are outlined in Attachment C.

2. APPLICABLE DOCUMENTS

2.1. General. The documents listed in this section are cited in sections 3 and 4 of this specification. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3 and 4 of this specification, whether or not they are listed. Unless otherwise specified, the documents listed in the solicitation or contract shall be the current edition at time of solicitation.

2.2. Government Documents.

2.2.1. Specifications, Standards, and Handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents shall be the current edition at time of solicitation.

FEDERAL STANDARDS

FED-STD-313 ------------------------------ Material Safety Data, Transportation Data and Disposal Data for Hazardous Materials Furnished to Government Activities

(Copies available online at http://quicksearch.dla.mil/)

MILITARY STANDARDS

MIL-STD-130N w/ Change 1 ------------ Identification Marking of U.S. Military Property

(Copies available online at http://quicksearch.dla.mil/)

Attachment A: Purchase Description VIBB 22-25-1009, Dated 29 October 2025.

http://quicksearch.dla.mil/ http://quicksearch.dla.mil/

NAVSEA

OSHECM Chapter 250 Rev 1 ------------ NAVSEA Occupational Safety, Health and Environment Control Manual for Naval Shipyards Chapter 250

(Copies available online at http://www.navsea.navy.mil/Home/Shipyards/Norfolk.aspx)

U.S. ARMY CORPS OF ENGINEERS (USACE)

EM 385-1-1 --------------------------------- Safety and Health Requirements Manual

(Copies available online at http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsMa nual.aspx)

2.2.2. Other Government Publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein.

Unless otherwise specified, the issues of these documents shall be the current edition at time of solicitation.

COMBINED FEDERAL REGULATIONS

29 CFR 1910 -------------------------------- General Industry, OSHA Safety and Health Standards

29 CFR 1915 -------------------------------- Occupational Safety and Health Standards for Shipyard Employment

40 CFR 82 ----------------------------------- Protection of Stratospheric Ozone

(Copies available online at http://www.gpo.gov/fdsys)

LOCAL ATTACHMENTS

Attachment A ------------------------------- Site-Specific Requirements and Regulations

Attachment B ------------------------------- Installation Location Drawings and Information

Attachment C ------------------------------- Existing Equipment Removal and Phased Delivery Requirements

Attachment D ------------------------------- Encountered Waste Summary

(Copies are attached to this solicitation)

2.3. Non-Government Publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents shall be the current edition at time of solicitation.

Attachment A: Purchase Description VIBB 22-25-1009, Dated 29 October 2025.

http://www.navsea.navy.mil/Home/Shipyards/Norfolk.aspx http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx http://www.usace.army.mil/SafetyandOccupationalHealth/SafetyandHealthRequirementsManual.aspx http://www.gpo.gov/fdsys

B11 STANDARDS

B11/STD B11.0 ----------------------------- Safety of Machinery

(Copies available from B11 Standards Inc., 7901 Westpark Dr, McLean, VA 22102)

INTERNATIONAL ORGANIZATION FOR STANDARDIZATION

ISO 10791-7-------------------------------- Test conditions for machining centres — Part 7:

Accuracy of finished test pieces

(Copies available at http://webstore.ansi.org/ or American National Standards Institute, Dept. 969, 1430 Broadway, New York, NY 10018)

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

NEMA Z535.4 ------------------------------ Product Safety Signs and Labels

(Copies available at http://www.nema.org or National Electrical Manufacturers Association, 1300 North 17th Street, Suite 1752, Rosslyn, VA 22209)

NATIONAL FIRE PROTECTION AGENCY

NFPA 70 ------------------------------------- National Electrical Code

NFPA 79 ------------------------------------- Electrical Standard for Industrial Machinery

(Copies available at http://www.nfpa.org or NFPA, 1 Batterymarch Park, Quincy, MA 02169)

2.4. Order of Precedence. In the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulation unless a specific exemption has been obtained.

3. REQUIREMENTS

3.1. Design. The item offered shall be new and a current commercially available model. A current model is defined as the manufacturer’s currently produced model which, on the date this solicitation is issued, has been designed, engineered, sold or is being offered for sale through advertisements or manufacturer’s published catalogue or brochures. Products such as a prototype unit, pre-production model, or experimental unit do not qualify as meeting the requirements specified herein. The machine shall include all components, parts, and features necessary to meet the performance requirements specified herein. All parts subject to wear, breakage or distortion shall be accessible for adjustment, replacement, and repair.

3.1.1. Measuring and Indicating Device Graduations. All measuring and indicating devices on the HBM shall be graduated in the inch/pound or both inch/pound and metric.

Attachment A: Purchase Description VIBB 22-25-1009, Dated 29 October 2025.

http://webstore.ansi.org/ http://www.nema.org/ http://www.nfpa.org/

3.1.2. OSHA Compliance. The equipment installation and its component parts shall be in compliance with 29 CFR 1910, NFPA 70 and NFPA 79. Approval shall be as specified under the “Approval” and “Acceptance” criteria in the OSHA regulations Subpart “O”, Machinery and Machine Guarding paragraph 1910.212 and Subpart “S” Electrical, paragraph

1910.303 and paragraph 1910.399, and Subpart “D” 29 CFR 1910.21-30 “Walking-Working Surface”.

3.1.2.1. Safety Guarding on Floor Opening. Any holes in the floor or pit decking shall be guarded per 29 CFR 1910.28. The guarding shall be removable, and each section of removable guarding shall weigh less than 50 lbs.

3.1.3. Safety Signs and Labels. Safety signs and labels in accordance with NEMA Z535.4 shall be securely attached to the equipment in visible locations, at the point of hazard(s), with any safety precautions to be observed by the operator or maintenance personnel permanently marked on the signs.

3.1.4. Safety Guarding. Covers, guards, or other safety devices shall be provided per ANSI B11.0 or equivalent ISO/EN/DIN/JIS standards. The safety devices shall not interfere with the operation of the HBM. The safety devices shall prevent unintentional contact with the guarded part, and shall be removable to facilitate inspection, maintenance, and repair of the parts.

3.1.5. Audible Noise Level. Audible noise emitted by the equipment shall not exceed 84 decibels (dB), measured on the “A” weighted scale and 92dB as measured on the “C” scale of a standard Type II sound level meter, at the operator's work position or any point at a distance of three (3) feet from the equipment. Noise generated by the work piece shall be excluded in determining compliance of the equipment with the 84 dB requirements.

3.1.6. Hazardous Material Exclusions. Supplies or materials being provided as part of the equipment shall be free of known hazardous materials. Hazardous materials shall not be brought on site without prior approval of the Government Point of Contract and cognizant shipyard personnel. Hazardous materials not needed for this project are prohibited.

Definitions of hazardous materials are specified in the latest version, including revisions adopted during the term of the contract, of FED-STD-313. Notwithstanding any other hazardous material usage permitted in this contract, radioactive materials or instruments capable of producing ionizing radiation as well as materials which contain asbestos, mercury, cadmium, lithium, methylene chloride, lead (= or >0.06%), or polychlorinated biphenyls (PCB’s) are prohibited. Nickel Metal Hydride and lithium batteries are permissible for memory backup. Class I Ozone Depleting Substances as defined in 40 CFR 82 shall not be used in the performance of this contract, or be provided as part of the equipment. Exceptions to the prohibition of these materials must be referred to the Contracting Officer in writing, for consideration, not later than 60 calendar days after effective date of contract and prior to any work being performed.

Attachment A: Purchase Description VIBB 22-25-1009, Dated 29 October 2025.

3.1.6.1. PCB Certification. Written certification from the manufacturer that the equipment contains no detectable PCBs (less than two (2) parts-per-million) shall be provided. The certification shall be on manufacturer’s letterhead, and signed by a company official who is empowered to provide same. A PCB label plate stating the PCB compliance certification shall be supplied and attached to the equipment as required in 3.8.

3.1.7. Environmental Protection. Under the operating, service, transportation, and storage conditions described herein, the HBM shall not emit materials hazardous to the ecological system as prohibited by Federal, state, or local statutes in effect at the point of installation.

3.1.8. Lubrication. Means shall be provided to ensure adequate lubrication for all moving parts. All recirculating lubrication systems shall include a filter that is cleanable or replaceable. Each lubricant reservoir shall have at least a 24-hour capacity. When a low lubricant level condition occurs, the machine shall complete the current operation and come to a complete stop. When a low oil pressure condition occurs in a continuously pressurized system, the machine shall enter an emergency stop condition. The machine shall indicate that oil or lubrication is required. All oil holes, grease fittings, and filler caps shall be accessible. A lubrication plate shall be securely attached to the equipment, see3.8.

3.1.9. Replacement Parts. All parts subject to replacement shall be manufactured to definite dimensions and tolerances. Replacement parts shall be interchangeable without requiring modification. Replacement parts are those that are subject to wear or failure such as gears, bearings, shafts, feed screws, drive belts, pumps, and seals. Electrical replacement parts shall include but not be limited to, motors, relays, fuses, switches, magnetics, pushbuttons, light bulbs, braking mechanisms, and solid-state devices. Tooling and accessories normally supplied as standard items shall also be considered replacement parts. Foreign-sourced replacement parts shall be interchangeable with domestically supplied components or be readily available from a domestic source.

3.2. Construction. The HBM shall be constructed of parts that are new, without defects, and free of repairs. The structure shall withstand all forces encountered during operation of the machine to its maximum rating and capacity without distortion.

3.3. Components. The HBM shall consist of not less than the following components:

3.3.1. Milling Spindle Assembly. The main spindle shall be IAW Table I and Fives/G&L Alignments Document A-480-071.

3.3.1.1. Giddings and Lewis Spindle Vibration Monitoring. The spindle shall include the Giddings and Lewis Spindle Vibration Monitoring system. The system shall include the following:

a. Headstock & bearing health monitoring

b. Monitoring for excessive vibration during machining

c. Collision detection

3.3.2. Integrated Contouring Spindle. The machine shall be equipped with an integrated contouring head spindle that is integrated into the headstock of the machine. The integrated contouring head spindle shall provide U-axis movement that is controlled by the CNC and have through spindle coolant. The integrated contouring head spindle shall utilize the Automatic Tool Changer (ATC) to load and unload tools under program command. Drawbar switches for manually loading tools into the integrated contouring head spindle shall be provided in a location that allow the operator to activate the switches while manually loading a tool holder into the contouring spindle. The integrated contouring head spindle shall meet the requirements stated in Table I and Fives/G&L Alignments Document A-480-071.

3.3.3. Plain Table. The machine shall come with a plain table that is IAW Table I and Fives/G&L Alignments Document A-480-071.

3.3.4. Rotary Table Attachment. A rotary table attachment capable of A-axis and B-axis rotation shall be supplied. The rotary table attachment shall have means of aligning the base to the plain table t-slots. Position feedback shall be through an absolute encoder. A battery pack shall be included when charging is required to maintain encoder position. A means for locking the table’s rotational position shall be provided and activated through program command. Hydraulic connections shall utilize quick disconnect fittings. Electrical connections shall utilize quick change waterproof type plugs with rapid mating and un-mating. The top of the rotary table shall have t-slots located at 90-degrees, be finished for a work-mounting surface. Lift points and an engineered lift plan shall be provided. The rotary table shall meet the requirements in Table I and Fives Measurement and Acceptance Report for NC Rotary Table, V2.1 03.05.2012.

3.3.5. Right Angle Head Attachment. The machine shall come with a right angle head attachment made from a casting of iron or iron alloy. The right angle head shall have 360-degrees of manual rotational adjustment with precision shot bolt indexing at 45-degree increments and a Vernier scale with 100-minute resolution. The right angle head shall connect to the headstock by use of a manual cam latch plate and manual electrical plugs.

Tooling shall be loaded manually into the right angle attachment’s output spindle. The right angle attachment shall have flood nozzles at the output spindle. Lift points and an engineered lift plan shall be provided. The right angle head attachment shall be IAW Table I and Fives Alignment Specifications, Model A Right Angle Milling Attachment, Accessory 3L Attachment, 06/25/2020.

3.3.6. Spindle Support Attachment. The machine shall come with an 800 mm spindle support. The spindle support attachment shall connect to the headstock by use of a manual cam latch plate and manual electrical plugs as needed.

3.3.7. Right Angle Head and Spindle Support Attachment Cradle. A right angle and spindle support attachment cradle shall be supplied. The cradle shall have lifting pad eyes welded to the frame and come with an engineered lift plan including the capacity of each pad eye. The cradle shall have a means of repeatable nesting of the attachments within the cradle in the X, Y, and Z-axes. The CNC controller shall come with installation and removal macros that include probing cycles to locate the position of the cradle, position the machine where the attachments can be manually attached and detached to and from the headstock latch plate requiring no manual movement, notify operator that it is time to latch or unlatch the attachments to and from the machine, extend the spindle to the correct position to engage the attachments or retract the spindle to disengage the attachments, limit the spindle speed to the maximum speed of the attachments or remove the spindle limits to normal operating speeds, and verify that the attachments are correctly loaded or unloaded to and from the machine and ready to operate.

3.3.7.1. Attachment Cradle Storage Rack. An attachment cradle storage rack shall be supplied. The rack shall sit on the floor and support and protect the attachment cradle when not in use. The rack shall have pockets to accommodate movement with pallet jacks or fork trucks.

3.3.8. Machine Enclosure and Decking. The machine shall come with a metal enclosure and decking that is IAW Fives Machine Enclosure Layout Drawing.

3.3.8.1. Enclosure Blind Spot Monitoring. The HBM shall come with a closed circuit means of monitoring the tool to work piece interface and the entire machine enclosure. The monitoring system shall include two monitoring points. The monitoring points shall have magnetic mounts and be located inside machine enclosure with remote movement controls from the operator station and an independent 21-inch minimum flat screen monitor located at the operator station.

3.3.8.2. Enclosure Machine Lighting. The machine shall include 4 (four) LED lights that comply with NFPA 79 requirements or equivalent ISO/EN/DIN/JIS standard. The LED lights shall be mounted to the enclosures walls and illuminate the entire machine enclosure.

Each LED light shall have a protective shield.

3.3.9. Telescopic Way Covers. Ways shall be protected by corrosion resistant telescopic way covers constructed of metal.

3.3.10. Chip Conveyor. The machine shall be equipped with a belt style chip conveyor running parallel with X-axis for removal of chips which shall discharge outside of the machine enclosure. The chip conveyor shall be automatic and manually operated.

3.3.11. Workpiece Measuring Device. The machine shall be equipped with a Renishaw RMP60-Q A standard for calibrating the probe shall be provided. Programs for the following functions shall be provided and loaded into program storage:

a. Face location (Z touch)

b. Edge location (X or Y touch)

c. Corner location (X and Y touch)

d. Groove width measuring

e. Shoulder width measuring

f. Two point bore/boss measuring (including rectangular pads/pockets)

g. Two point bore/boss location (including rectangular pads/pockets)

h. Four point bore/boss location (including rectangular pads/pockets)

i. Probe calibration

j. Alarm and hold on unexpected trip

k. Individual and work coordinate offset changes

l. Two location measuring (pitch or angle detection) for both tilt and rotation

m. 3-point bore/boss measuring for partial circles/arcs

n. 3-point bore/boss location

3.3.12. Tool Measuring Device. The HBM shall be provided with a Renishaw RTS automated tool length and diameter measuring device including all software.

3.3.13. Automatic Tool Changer (ATC). The machine shall come with an ATC which automatically loads and unloads tools in the main spindle and the integrated contouring head spindle. The ATC shall be IAW Table I.

3.3.14. Absolute Position Feedback Scales. X, Y, W and rotary table B-axis shall be equipped with absolute position feedback scales

3.3.15. CNC Controller. The machine controller shall consist of a Fanuc 31-iB5 CNC controller with a 21-inch industrial touch screen monitor, industrial QWERTY keyboard layout, and industrial mouse. The CNC controller pendant shall be adjustable in the vertical direction.

3.3.15.1. CNC Control Features. The following control features shall be supplied with the CNC controller:

a. Industry 4.0 Database

b. Canned cycles for drilling

c. Part program editing

d. Extended part program editing

e. Work coordinate system, 300 pairs (G54-G59)

f. 3-dimensional coordinate system conversion

g. Background editing

h. Tool nose radius compensation

i. Absolute / incremental programming

j. Multiple repetitive cycle type II (pocketing)

k. Decimal point programming

l. Programmable inch/metric

m. Inch/Metric conversion

n. Canned cycles

o. Linear interpolation

p. Circular interpolation by radius programming

q. Radius programming format for ICH

r. Workpiece coordinate system

s. 48 additional workpiece coordinates

t. Polar coordinate interpolation

u. Helical interpolation

v. Programmable data input (G10)

w. Cylindrical interpolation

x. Rotary axis control

y. Rotary table dynamic fixture offset

z. Stored stroke check 1, 2 and 3

aa. Sub program call- 15 levels nested

bb. 2nd, 3rd, and 4th reference position return

cc. Thread cutting

dd. Thread cutting retract

ee. Variable/Multiple lead thread cutting

ff. Automatic exact stop check

gg. Custom macro

hh. Chamfering / corner rounding

ii. Feed functions: Feed per minute, feed per revolution, rapid traverse, dwell, inverse time

jj. 1000 custom macro common variables

kk. 200 pairs of tool offsets

ll. Tool radius compensation

mm. Tool geometry/wear compensation

nn. Emergency stop

oo. Optional 9 block skip

pp. Cycle start/stop

qq. Mode selection (Manual, MDI, Auto)

rr. Feed hold

ss. Feed rate override

tt. Spindle speed override

uu. Jog direction

vv. Axis selection

ww. Single block

xx. 2 USB ports

yy. Constant surface speed control

zz. Memory card program, entry count extension, 1000 programs aaa. Embedded Ethernet bbb. 1000 registerable programs ccc. Self-diagnostic functions ddd. Backlash compensation eee. Spindle thermal compensation fff. Unexpected disturbance torque detection ggg. Linear scale I/F with absolute address reference mark hhh. Tool retract and recover

iii. Manual handle interruption jjj. Manual handle retrace kkk. Active block cancel lll. Dwell/Auxiliary function time override function mmm. Positioning in machine coordinate system with federate nnn. M code protect function ooo. Rigid Tapping ppp. Rigid tapping by manual handle qqq. Retraction for rigid tapping rrr. Tool management expansion, 240 pairs sss. 8 Mbyte part program storage size ttt. Fast data server uuu. Data server buffer mode

vvv. Data server explorer connection www. Data server editing and operation

xxx. Pendant type manual pulse generator with axis selection and magnification switches yyy. Dynamic Graphic Display zzz. RS232C interface aaaa. RS232C interface expansion of receiving buffer bbbb. Arbitrary speed threading cccc. AI Contour Control II (AICC ll) dddd. Jerk control eeee. Nano Smoothing ffff. Machining Condition Selecting gggg. Machining Quality Level Adjustment hhhh. Automatic Corner Override (G62)

iiii. Work Setting Error Compensation (G54.4) jjjj. Inverse Time Feed (G93) kkkk. Five axis control features llll. High Speed Smooth TCP (R677) (Includes the Following):

mmmm. Tool Center Point Control TCP (S677) nnnn. - Smooth TCP (R639) oooo. - Tool Posture Control (S994) pppp. - Cutting Point Command (S996) qqqq. - Expansion of Axis Command in TCP (R592) rrrr. - High Speed Block Processing Package (70.6.300) ssss. - AICC II (Look-Ahead to 200 Blocks) (S808) tttt. - Jerk Control (S678) uuuu. - Nano Smoothing (S687)

vvvv. - Machining Condition Selecting Function (S637) wwww. - Machining Quality Level Adjustment (R593)

xxxx. Automatic Corner Override (J891) 3D Cutter Compensation (S667) yyyy. Three Dimensional Manual Feed (S679) zzzz. Tilted Working Plane Command with Guidance (R522) aaaaa. Workpiece Setting Error Compensation (S993) bbbbb. Inverse Time Feed (J715) ccccc. Integrated contouring head package ddddd. Flexible synchronous control eeeee. Programmable boring bars fffff. Constant surface speed control ggggg. Tool length offset compensation – turn mode hhhhh. Graphical interface

iiiii. Multiple repetitive cycles type I (G70-G76)

3.3.15.2. Operator Remote Pendent. The machine shall have a remote pendant that allows for axis motion control through jog, incremental and manual pulse generator. It shall have an LCD that displays remote pendant enable/disable, sequence number, part coordinate position for selected axis, feed rate, feed percentage, and single speed. Controls on the remote shall include Auto, Master Stop, Enable Remote, Disable Remote, Spindle Restart, Spindle Stop, Cycle Start, Axis Selection, Jog +, and Jog -, and an emergency stop button.

The pendant shall have enough cord to allow the operator use of the pendant while viewing the part to tool interface. Door interlocks shall not prevent jog functions of the pendant.

Cycle start functions shall be disabled while enclosure doors are open.

3.3.16. Post Processor and Machine Definition. A post processor shall be provided that utilizes the Shipyards current version of MasterCam. The post processor shall include all files necessary to provide the capability to generate tool paths and output ASCII format NC files for all available functionality of the machine including, but not limited to, simultaneous two, three, and four axis milling, turning with ICH, and both the right angle head and rotary table attachments. The files shall include documentation and be delivered on compact disc within ten (10) calendar days of the successful completion of origin testing.

3.3.17. Coolant System. The machine shall be provided with a flood and through spindle coolant system. Coolant pressures shall have 4-point programmable pressures at 300, 500, 750, and 1,000 psi. A key switch shall be provided to enable the 1,000 psi coolant.

3.3.17.1. High Pressure Coolant Filtration. The high pressure coolant system shall have dual filter with an auto cross over feature that automatically changes one filter to the other and displays an operator message on control pendant indicating the status of filters.

3.3.17.2. Coolant Wash-Down Wand. A coolant wash-down wand shall be supplied with an on/off coolant wash down switch.

3.3.17.3. Through Milling Spindle Coolant. A 1,000 PSI through spindle coolant system shall be provided for the milling spindle.

3.3.17.4. Through Milling Spindle Air. M-code activated non-lubricated through spindle air shall be provided.

3.3.17.5. Through Integrated Contouring Head Spindle Coolant. A 300 PSI through head coolant system shall be provided for the integrated contouring head.

3.3.17.6. Oil Skimmer. A tank mounted, tube-type oil skimmer shall be supplied with a collection reservoir. A decanter shall be provided to assist in separation of the tramp oil and coolant. The tube-type oil skimmer shall be appropriately sized for the coolant reservoir.

3.3.18. Energy Isolating Devices. The equipment shall be provided with energy isolation devices (e.g. power switches, safety devices, circuit breakers, valves) that protect personnel from the release of hazardous energy and are integral to the component being isolated and locked out. The devices shall be designed and manufactured such that they can be padlocked in the OFF position. This includes both mechanical and electrical devices. An energy isolation device shall be installed as the first energy control device on all major components of the system such that the component can be isolated at the component level.

3.3.19. Electrical System. The machine shall conform to NFPA 79 or equivalent ISO/EN/DIN/JIS standard. The existing electrical power source available at the installation site is 240 VAC, 3-phase. The contractor shall establish electrical connection at overhead bus duct which is approximately thirty (30) feet in elevation. The machine’s electrical system shall be tolerant of voltage fluctuation of ± 10 percent. The electrical system shall be complete, including transformers required to modify the existing source voltage to the proper operating voltage of the equipment. A properly rated and fused single disconnect device, controlling all electrical power to the equipment, shall be utilized on the machine with means of lockout in the off position only.

3.3.19.1. Electrical Enclosures. Electrical components of the equipment shall be contained in enclosures of drip-proof construction and of minimum size consistent with good design practices and ventilation of components, meeting the requirements of NEMA Type 12 or equivalent ISO/EN/DIN/JIS standard.

3.3.19.2. Facility Electrical Connections. Electrical connections made to the facility electrical system shall conform to NFPA 70.

3.3.19.3. Hour Meter. The HBM shall be equipped with an analog hour meter mounted on the main electrical panel visible from the outside. A digital hour meter embedded in the controller shall be acceptable. The hour meter shall be installed to display accumulated operating time of the main drive motor. The meter shall be of the non-resetting type and shall have a range of 0 to 99,999.9 hours in increments of 0.1 hours, and shall revert to zero

(0) upon reaching the maximum count. All analog hour meter shall have a NEMA enclosure rating of 4X, and shall be mounted to withstand shock and vibration generated by the equipment in an accessible location.

3.3.20. Compressed Air Quick Disconnect. A 1/2 inch NPT, Hansen 3RL or Foster F3RL quick disconnect female fitting shall be provided and connected to shop air and located convenient to the operator station.

3.4. Size and Capacity. The size and capacity of the machine shall be not less than specified in Table I.

Table I Size and Capacity X-Axis Travel distance 118-inches Y-Axis Travel distance 99-inches W-Axis (Saddle) Travel distance 59-inches Z-Axis Travel distance 39-inches U-Axis Travel distance 8.7-inches B-Axis Rotary Table Attachment Table diameter 49-inches Capacity 44,000 Pounds Travel distance Full 360 degrees Feed rate 0-4 RPM Positions 360,000 Right Angle Head Attachment Spindle input/output CAT 50 Spindle speed 1,500 RPM Length from input spindle gage line to output spindle center line 38-inches

Maximum height from output spindle gage line to spindle center line of input spindle 6.5-inches

Maximum height of right angle head 12.75-inches for a minimum length of 29-inches from output spindle center line

Table I Size and Capacity

Maximum width of right angle head 9-inches for a minimum length of 15-inches from output spindle center line

Milling Spindle Speed Low: 1-760, High: 760-3500RPM Diameter 6 inch Taper BIG PLUS 50 Integrated Contouring Head Spindle Vertical offset from ram spindle 20 inches Horizontal offset from ram spindle 6.7-inches Maximum turning diameter 21-inches Speed 0-600 RPM Taper Capto C8 Plain Table Size 61-inches x 118-inches Automatic Tool Changer, BIG PLUS 50 Pockets 40 Automatic Tool Changer, Capto C8 Pockets 20

3.5. Accuracy, Repeatability and Alignment Tolerances. The accuracy, repeatability, and Alignment tolerances of the machine shall be IAW Attachment F, G, and I (FIVES/G&L Test Reports).

3.6. Standard Equipment. All standard equipment required for proper operation and maintenance of the HBM shall be provided. A list of these items shall be furnished at time of proposal.

3.7. Fixtures and Tooling. The following fixtures and tooling shall be provided for the HBM as specified in Table II shall be provided. A list of these items shall be furnished at time of proposal. All tool holders shall be supplied with ANSI 5.50 Style (through coolant type) retention knobs that are compatible with the machine spindles.

Table II Tool Holding Big Daishowa 50 End Mill Adapters (through coolant type)

Part Number and Name Quantity

BCV50-MEGA.750DS-4 10

BCV50-MEGA.750DS-6 10

BCV50-MEGA1.000DS-4 4

BCV50-MEGA1.000DS-6 4

BCV50-MEGA1.250DS-4 2

BCV50-MEGA1.250DS-6 2

BCV50-MEGA1.500DS-4.5 1

C.750-1/4 5 C.750-5/16 5 C.750-3/8 5

Table II C.750-7/16 5 C.750-1/2 5 C.750-9/16 5 C.750-5/8 5 C1.000-1/4 5 C1.000-3/8 5 C1.000-1/2 5 C1.000-5/8 5 C1.000-3/4 5 C1.250-1/2 2 C1.250-9/16 2 C1.250-5/8 2 C1.250-11/16 2 C1.250-3/4 2 C1.250-13/16 2 C1.250-7/8 2 C1.250-15/16 2 C1.250-1 2 MGR60L (Wrench) 3 MGR70L (Wrench) 3 MRG80l (Wrench) 3 MGR99L (Wrench) 1

P40T-1CMGH2 1

P40T-2CH 1

Tool Holding Big Daishowa 50 - Shell Mill Adapters (through coolant type)

BCV50-SMC2.000-2.5 1

BCV50-SMC1.000-4 1

BCV50-SMC1.000-6 1

BCV50-SMC1.000-12 1

BCV50-SDF57-72-200 1

SDF57-SMC1.000DP-72-180 1

Tool Holding Big Daishowa 50 – Modular Tool Holders

BCV50-CKB4-193 1

BCV50-CKB5-243 1

BCV50-CKB6-289 1

CKB44DP-120 1

CKB55DP-150 1

CKB66DP-180 1

CKB6-HMC.750 1

EWN41-74E-CKB4 1

EWN53-95E-CKB5 1

EWN68-150E-CKB6 1

ENH4-1T 1

ENH4-2T 1

ENH4-3T 1

ENH5-1T 1

ENH5-2T 1

ENH5-3T 1

ENH6-1T 1

ENH6-2T 1

ENH6-3T 1

CKB6-SM1.00-20 1

BCV50Y-C6-2 (adapter) 1

BCV50Y-C8-3 1

Tool Holding CAT 50 - Slotting Cutter Adapters

C5002-1000-6.17 1

C5002-1250-6.28 1

C5002-1500-6.60 1

ER 32 Collet Chucks with Integral CV50 Shank (through coolant type)

C5007-0032-4.00 1

C5007-0032-6.00 1

ER100 Collet Chucks with Integral CV50 Shank (through coolant type)

C5007-1000-3.50 2

C5007-1000-7.50 1

Morse Taper Adapters with Integral CV50 Shank #1 Morse taper 2 #2 Morse taper 2 #3 Morse taper 2 #4 Morse taper 2 #5 Morse taper 2

Tool Holding Sandvik C8-A391.20-31 080, C8 Capto to 1 ¼” strait shank

C8-A931.20-25 080, C8 Capto to 1” strait shank

C8-570-3C 40 288, C8 Capto to CoroTurn SL damped adaptor

C8-570-3C 40 224, C8 Capto to CoroTurn SL damped adaptor

C8-570-3C 40 368, C8 Capto to CoroTurn SL damped adaptor

SL-PCLNR-40-12HP, T-Max P head for turning

570-DVUNR-40-16 1

SL-PDUNR-40-15HP, T-Max P head for turning

SL-266RKF-403227-22, T-Max P head for turning

C2R-SL40-RH23GB 1

SL-PCLNL-40-12HP, T-Max P head for turning

SL-PDUNL-40-15HP, T-Max P head for turning

570-DVUNL-40-16, T-Max P head for turning

SL-266LKF-403227-22, T-Max P head for turning

C2R-SL40-LH23GB 1

C8-391.01-80 200, Coromant Capto extension adaptor

C8-570-40-RGM 1

ER75 Single Angle Standard Collet Sets

1/16 inch - 3/4-inch range, 1/64-inch increment

1 set of 45

ER100 Single Angle…