SF18 NFFM72202302491.pdf
PDF 938 KB Posted
- Attached to
- SPLIT DUCTLESS HVAC SYSTEM INSTALLATION AT THE NORTHEAST FISHERIES SCIENCE CENTER LAB IN MILFORD, CT
- Solicitation number
- 1305M323QNFFM0118MCW
About this file
This request for quotation solicits offers for the installation of a split ductless HVAC system at the Northeast Fisheries Science Center Laboratory in Milford, Connecticut. The solicitation requires offerors to provide all equipment, labor, and materials necessary to install two 4-ton condensers and four wall-mounted units in accordance with the statement of work. Quotes are due by July 14, 2023. Award is expected by September 30, 2023. The NAICS code is 238220 for HVAC Contractors and Duct Work with a $19 million size standard. This is a total small business set-aside. The solicitation will be evaluated as a tradeoff considering technical approach, experience, past performance significantly more important than price.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
(THIS IS NOT AN ORDER)
THIS RFQ IS IS NOT A SMALL BUSINESS SET-ASIDE
15. DATE OF QUOTATION
16. SIGNER
a. NAME (Type or print)
c. TITLE (Type or print)
b. TELEPHONE
AREA CODE
NUMBER
STANDARD FORM 18 (REV. 6-95) Prescribed by GSA-FAR (48 CFR) 53.215-1(a)
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition not usable
8. TO:
b. COMPANYa. NAME
c. STREET ADDRESS
d. CITY e. STATE f. ZIP CODE
9. DESTINATION
a. NAME OF CONSIGNEE
b. STREET ADDRESS
c. CITY
d. STATE e. ZIP CODE
7. DELIVERY
FOB DESTINATION
OTHER
(See Schedule)
10. PLEASE FURNISH QUOTATIONS TO THE
ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date)
IMPORTANT: This is a request for information and quotations furnished are not offers. If you are unable to quote, please so indicate on this form and return it to the address in Block 5a. This request does not commit the Government to pay any costs incurred in the preparation of the submission of this quotation or to contract for supplies or service. Supplies are of domestic origin unless otherwise indicated by quoter. Any representations and/or certifications attached to this Request for Quotation must be completed by the quoter.
11. SCHEDULE (Include applicable Federal, State and local taxes)
ITEM NUMBER
(a)
SUPPLIES/ SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
12. DISCOUNT FOR PROMPT PAYMENT
a. 10 CALENDAR DAYS (%) b. 20 CALENDAR DAYS (%) c. 30 CALENDAR DAYS (%) d. CALENDAR DAYS
NUMBER PERCENTAGE
NOTE: Additional provisions and representations are are not attached.
13. NAME AND ADDRESS OF QUOTER
a. NAME OF QUOTER
b. STREET ADDRESS
c. COUNTY
d. CITY e. STATE f. ZIP CODE
14. SIGNATURE OF PERSON AUTHORIZED TO
SIGN QUOTATION
PAGE OF PAGES
1. REQUEST NUMBER 2. DATE ISSUED 3. REQUISITION/PURCHASE REQUEST NUMBER 4. CERT. FOR NAT. DEF.
UNDER BDSA REG. 2
AND/OR DMS REG. 1
RATING
5a. ISSUED BY 6. DELIVER BY (Date)
5b. FOR INFORMATION CALL (NO COLLECT CALLS)
NAME TELEPHONE NUMBER
AREA CODE NUMBER
NF-FM7220-23-02491
NF-FM7220-23-02491
1305M323QNFFM0118
WESTERN ACQUISITION DIVISION
325 BROADWAY, SOU6
BOULDER CO 80305
MICHELLE WALTON
MICHELLE.WALTON@NOAA.GOV
Please See Continuation Page for Line Item Details
303 578-6582 OMI (MILFORD) /F/NECX22
NOAA/NMFS 212 ROGERS AVENUE
MILFORD
06460CT
JUL 14, 2023
SEP 30, 2023
DUNS:
FM702273
SCHEDULE Continued
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
The magnitude of this project is between $25,000.00 and $100,000.00.
This is a total small business set-aside under NAICS code 238220 with a size standard of $19.0M.
Davis Bacon Wage Determination rates CT20230023, Modification 8 are incorporated and may be viewed at SAM.gov.
SITE VISIT:
The government recommends a site visit and vendors must pre-register with Domenick Capomolla at least 2 working days in advance via phone or email.
NOAA Northeast Fisheries Science Center 212 Rogers Ave Milford, CT 06460
Contact Domenick Capomolla at 203-882-6512 or email at domenick.capomolla@noaa.gov
All Offerors are strongly encouraged to make a site visit to inspect all proposed work and to acquire all necessary site information to properly prepare their Quote. Failure of the Offeror to visit the site and acquire all necessary site information to properly prepare the quote shall not be acceptable cause to justify a later request for additional costs after Contract Award. Any questions that come up at the site visit must be provided to Michelle Walton via email at michelle.walton@noaa.gov no later than July 10, 2023, 12:00pm MST. No questions will be answered on site.
Offerors must provide a detailed technical approach writeup with their quote regardless of whether or not a site visit was made and it cannot be a reiteration of the Statement of Work.
Offerors shall assume that the Government has no prior knowledge of them or their capability.
Quote shall include at least two references for similar services including the phone number, full address, and email address.
In addition, vendors shall complete Blocks 1 through 4 on Page 1 of the Past Performance Questionnaire.
The vendor is required to send the Past Performance Questionnaire to those Government and commercial activities provided by the vendor in their submission and email the completed survey form directly to MichelleWalton at michelle.walton@noaa.gov by the
DUE DATE OF THIS SOLICITATION
0001 SERVICES, NON-PERSONAL, TO PROVIDE ALL
EQUIPMENT, LABOR, AND MATERIALS (UNLESS
OTHERWISE PROVIDED HEREIN) NECESSARY TO
INSTALL:
Split Ductless HVAC System at Milford CT Lab in accordance with the attached, incorporated Statement of Work.
All work is to be completed by 09/30/2023 or sooner
1.00 JB
PAGE 2 OF 56 1305M323QNFFM0118
Table of Contents
Statement of Work
Construction Clauses
Davis Bacon Wage Determination
PAGE 3 OF 56 1305M323QNFFM0118
CLAUSES
Statement of Work
PAGE 4 OF 56 1305M323QNFFM0118
Statement of Work For
Split Ductless HVAC System Install At the Northeast Fisheries Science Center Milford CT Laboratory
212 Rogers Ave Milford CT 06460
DESCRIPTION
The National Marine Fisheries Service Laboratory is lo ated at 212 Rogers Ave Milford CT 06460. Domenick Capomolla for a pre-bid job site inspection, 203-882-6512 office phone or email Domenick.capomolla@noaa.gov. oordinate site visits at least 48 (two working days) hours in advance of the intended site visit.
The National Marine Fisheries Service (NMFS), a part of the National Oceanic and Atmospheric Administration (NOAA) of the Department of Commerce (DOC), is a governmental agency charged with the mission of stewardship for living marine resources.
The Contractor shall be fully knowledgeable of all requirements of the contract documents and shall make themselves aware of all job site conditions that will affect their work.
The Contractor shall verify all dimensions and equipment prior to submitting bid quotation.
The Contract shall install Daikin HVAC ductless mini split system or equivalent, to provide heating and cooling for the basement level of the Milford CT lab.
The Contractor shall install two 4 Ton, 20.2 seer, 12.5 HSPF Daikin MXS series condensers or equivalent.
The Contractor shall install four (4) Daikin FTXS-CTXS series 20.2 SEER 12.5 HSPF wall mounted units or equivalent.
The contractor shall furnish and install all necessary hardware, refrigeration lines, R410A refrigerant, controls, valves, sensors, field wiring, piping, insulation and programming services to ensure proper operation as stated in the contract documents.
The Contractor shall provide two hours of training and commissioning for two facility Personnel.
Site and Project Location:
PAGE 5 OF 56 1305M323QNFFM0118
PRE-BID SITE VISIT
It is recommended that a site visit be conducted prior to submitting a quote in order to view site conditions, verify locations, verify measurements, and equipment. Contact to schedule a site visit between the hours of 7:30 AM– 3:00 PM, Monday through Friday. Please plan to coordinate site visits at least two working days in advance of the intended site visit.
GENERAL
A. The Contractor shall comply with all applicable codes and other published instructions for the installation of specified products, and installation requirements per the contract documents.
B. The Contractor shall have at a minimum 5 years of verifiable experience installing HVAC systems and programming for proper operation.
PAGE 6 OF 56 1305M323QNFFM0118
C. The Contractor shall provide licensed tradesman for electrical, plumbing, pipefitting, rigging and shall follow the BOCA, NEC, ASME, other applicable codes for the state of Connecticut.
D. The Contractor shall be responsible for tracing, verifying and isolating all utilities before construction begins. The Contractor shall coordinate with Southern Connecticut Gas Company for gas related activities and UI power company for electrical related activities.
E. The Contractor is responsible for his/her own security arrangements including sub Contractor’s materials, tools, equipment, and personnel.
F. Work in Progress: The Contractor shall be responsible for the protection and safe keeping of all work in progress prior to final acceptance by the Government.
G. All methods, materials and workmanship provided by the Contractor under this contract shall be performed in accordance with professional industry standards, manufacturer's specifications and shall comply with applicable codes for construction. Field measurements are the responsibility of the Contractor.
H. Professional agencies, associations, councils, institutes, codes, and standards as required or referenced by law, statue or manufactures recommendation including those listed in Appendix #2 are part of the contract requirements.
I. All permits and fees are the responsibility of the Contractor.
J. Appendix 1: Acronyms.
K. Appendix 2: Professional Organizations
SPECIFIC TASKS
A. The Contractor shall isolate and lockout/tag out all utilities to ensure a safe working Environment.
B. The Contractor shall provide all equipment, tools and labor to install a Daikin ductless mini split HVAC system or equivalent.
C. The Contractor shall install one 4 Ton, 20.2 seer, 12.5 HSPF Daikin MXS series condensers or equivalent.
D. The Contractor shall install four (3) Daikin FTXS-CTXS series 20.2 SEER 12.5 HSPF wall mounted units or equivalent.
E. The Contractor shall install a Daikin heat pump system or equivalent.
F. The Contractor shall install all necessary piping and electrical requirements for the heat Pump and Split Duct system.
G. The Contractor shall install the required refrigeration lines.
PAGE 7 OF 56 1305M323QNFFM0118
H. The Contractor shall charge the HVAC system with R-410A refrigerant.
I. The Contractor shall provide all electrical labor for installation of new Condenser units and wall mounted units. All wiring is to be installed in ¾ inch EMT or per the NEC whichever is greater.
J. The Contractor shall install new pipe insulation on all refrigeration lines.
K. The Contractor shall install thermostats where needed.
L. The Contractor shall ensure proper operation of all system components.
M. Supply all ancillary equipment, materials not specifically referenced required to complete the work such as supports, hangers, hardware, signs, labels, and thermostats.
ACCESS TOWORK SITE
A. All persons employed within the boundaries of the property or restricted-access areas therein, and all persons permitted to enter such property and areas shall comply with the security regulations for the NEFSC Milford Laboratory.
B. The Government reserves the right to close down the job site and order Contractor personnel off the premises in the event of a national emergency or a shut-down, for as long as security problems persist. The Contractor may only return to the site with verbal approval from the COR.
C. The Government reserves the right to exclude or remove from the site or building any employee of the Contractor or a sub-Contractor whom the Government deems incompetent, careless, insubordinate or otherwise objectionable, or whose continued employment on the work is deemed by the Government to be contrary to the public interest.
FINAL ACCEPTANCE AND INSPECTIONS
A. Inspection of work to be performed by the NEFSC Facilities Operations Manager -COR.
Any corrective action required because of the inspection will be accomplished prior to final Billing.
B. The Contractor may be notified of deficiencies in performance in writing by the COR.
Oral deficiency notifications will be confirmed in writing. The Contractor shall take prompt corrective action upon notice of deficiency.
C. The Contractor shall advise the Government when all work is completed. The Government will not accept the work until it determines that all work has been satisfactorily completed within the terms of the contract.
PAGE 8 OF 56 1305M323QNFFM0118
EXISTING CONDITIONS
If discrepancies are discovered between the existing conditions and those noted on the SOW/drawings, immediately notify the CO. Upon receipt of Bidding Documents, verify documents are complete. Notify CO if documents are incomplete. Immediately notify GPC/CO upon finding discrepancies or omissions in Bidding Documents.
PERIOD OF PERFORMANCE
A. The actual start date shall be coordinated with the COR.
B. Upon notice to proceed, the Contractor shall be required to complete work within 30 calendar days.
SUBMITTALS
The Contractor shall submit the following:
● Schedule (5 days after ) Manufacturer's cut sheets.
● Safety Data Sheets (SDS) (10 days after )
● Safety Plan (5 days after )
DELIVERY, STORAGE, HANDLING, AND PROTECTION
A. Deliver materials to the job site in the manufacturer’s original, unopened containers or wrappings with the manufacturer’s name, brand name and installation instructions intact and legible. Deliver in sufficient quantity to permit work to continue without interruption.
B. Comply with the manufacturer’s written instructions for proper material storage.
C. Any damaged materials shall be removed and replaced at the Contractor’s expense.
D. Care shall be taken to provide protection of surrounding structures, hallways and building structures.
GOVERNMENT POINT OF CONTACT
QUALITY CONTROL
A. The Contractor shall submit manufacture cut sheets and other specification literature for all materials to be installed for the COR approval.
B. All work described in the Statement of Work shall comply with the manufacturers installation guidelines.
PAGE 9 OF 56 1305M323QNFFM0118
C. The Contractor shall furnish all labor, materials, tools, transportation, services and supplies as stated in this requirement.
D. Work shall be completed in accordance with the construction industry standards and codes.
E. The Contractor shall supply the COR with the onsite supervisor contact information and any other key personnel.
WARRANTY
The Contractor shall provide a written warranty for service including labor and materials for a period of one year from the date of startup with no dollar limitation. Including but not limited to all manufacturers warranties.
USE OF THE PREMISES
Before beginning work, the Contractor shall secure approval from the COR for the following:
A. Contact the COR for parking information and facility access.
B. Access to the site.
C. Areas permitted for storage of materials and debris.
D. Security: Obey the government’s requirements for personnel identification, inspection and other security measures.
E. The NEFSC is a smoke free campus. The Contractor and its employees shall adhere to all applicable rules and regulations regarding maintenance of a smoke free environment on the job site.
F. Use of Government facilities
1. Water and electricity for construction purposes are available at the work site.
2. Toilet facilities shall be provided by the Contractor. Location of temporary facilities shall be coordinated with the owner's representative or the COR.
3. Contractor shall provide storage for tools and materials. The Government is not responsible for providing storage or security of materials, tools, or equipment.
G. The premises will be occupied during the performance of the work. Contractor to coordinate work with the COR to accommodate the work schedule, continuing access and completion date.
H. Working hours shall be 7:00 AM – 3:30 PM (M-F). Contractor shall observe all federal holidays.
PAGE 10 OF 56 1305M323QNFFM0118
WORKMANSHIP
All work shall be of highest quality and in strict accordance with the manufacturer’s published specifications and to the building owner’s satisfaction, most recent codes and standards.
QUALITY ASSURANCE
A. Unless otherwise noted in the contract documents, Contractor shall comply with the manufacturer’s current specifications and details.
B. The Contractor shall provide an adequate number of experienced workers regularly engaged in this type of work who are skilled in the application techniques of the materials specified.
C. There shall be a site superintendent on the job site at all times while work is in progress. The site superintendent must be an employee of the general Contractor and on the site all times during the course of any ongoing work.
D. There shall be no deviations made from this specification or the approved shop drawings (if any) without the prior written approval of the COR. Any deviation from the manufacturer’s installation procedures must be supported by a written certification on the manufacturer’s letterhead and presented to the COR for consideration.
E. All substitution requests for products, equipment, materials and methods described within the contract documents shall be submitted to the COR. Substitution requests are not permitted prior to the Notice to Proceed. Substitute products will be considered when the request is submitted in writing to the COR. The COR will have seven (7) working days to approve/disapprove the substitution request. Substitution requests shall not result in schedule extensions.
FACILITIES AND CONTROLS
A. The Contractor shall remove and dispose of all debris and trash from the job site in a timely and legally acceptable manner so as to not detract from the aesthetics or the functions of the building.
B. Contractor shall comply with all applicable Federal, State, and local laws and regulations concerning environmental pollution prevention control and waste disposal.
C. Contractor shall immediately inform the COR of any environmentally hazardous situations that may arise as well as contact required regulatory agencies.
D. Perform daily clean up to collect all wrappings, empty containers, paper, and other debris from the project site. Upon completion, all debris must be disposed of in a legally acceptable manner. The Contractor shall ensure that the project area and areas adjacent to the project area are maintained in a clean and safe condition.
PAGE 11 OF 56 1305M323QNFFM0118
SAFETY
A. The Contractor shall be responsible for all means and methods as they relate to safety and shall comply with all applicable OSHA, NEC, NFPA, and EPA, local, state and federal requirements. Safety shall be the responsibility of the general Contractor. All related personnel shall be instructed daily to be mindful of the full time requirement to maintain a safe environment for the facility’s occupants including staff, visitors, customers and the occurrence of the public on or near the site.
B. The Contractor shall comply with the requirements of 29 CFR, Part 1910: Occupational Safety and Health Administration (OSHA) General Industry and Health Standards, and Health Administration (OSHA) General Industry and Health Standards and 29 CFR, part 1926 Construction Standards. The Contractor shall promptly correct any non-complying work or conditions. Contractor shall be responsible to ensure its work does not affect the safety of the public or employees of the Government. Neither the Government nor its representatives shall bear any responsibility for safety precautions at the project work site. If, however, in the opinion of the COR a life-threatening condition exists, the COR will orally (to be confirmed in writing) require the Contractor to immediately suspend work in the affected area until the condition is corrected. Whenever Contractor’s operations may create a hazardous condition, it shall at its sole expense, furnish, install and maintain such guards, fences, barricades, railing, light, signs, or other devices necessary to prevent accident, injury or damage to people or equipment.
C. Five days prior to start of work the Contractor shall submit a safety plan. To include but not limited, open flames, welding, debris, cleanup, workplace safety methods, and emergency procedures. The Safety Plan must be available on site at all times and must be reviewed with all sub-Contractors working under this contract for the duration of the contract project.
D. It is the Contractor’s responsibility to ensure all employees; sub-Contractors, vendors, and other company representatives adhere to all safety rules, regulations, policies and practices.
E. Contractor shall observe lock/out tag/out regulations and as required by OSHA.
F. The Contractor shall keep the project site in a neat and orderly condition at all times.
JOB CONDITIONS, CAUTIONS ANDWARNINGS
A. Safety Data Sheets (SDS) must be on location at all times during the transportation, storage and application of materials. A separate set shall be given to the COR fifteen (15) days prior to starting of the work.
B. The Contractor shall not cause or permit any hazardous material to be brought upon, kept or used in or about the premises by its agents, employees, or subContractors without the prior consent of the COR. Hazardous materials that are necessary to the performance of this contract shall be used, kept and stored in a manner that complies with all laws regulating any such hazardous material brought upon or used or kept at this site. Contractor shall provide Safety Data Sheets to the COR for any hazardous materials used in the performance of this contract.
PAGE 12 OF 56 1305M323QNFFM0118
C. As used herein, the term “Hazardous Material” means any hazardous or toxic substance, material, or waste, including but not limited to, those substances, materials, and wastes listed in the Department of Transportation Hazardous Material Table (49 CFR 172.101) or by the Environmental Protection Agency as hazardous substances (40 CFR Part 68.130) and amendments thereto, petroleum products, or such other substances, material, and wastes that are or become regulated under any applicable local, state, or Federal law.
D. Site condition in and around the boiler is limited. Working space between boilers, walls and ceilings is limited.
PERSONNEL
A. The Contractor shall provide proof that all on-site employees are US citizens or legal aliens.
B. The Contractor shall not employ personnel with felony convictions, or with a record of narcotics use, for work at the Milford Laboratory.
PAGE 13 OF 56 1305M323QNFFM0118
APPENDIX 1
PROFESSIONAL AGENCIES, ASSOCIATIONS, CODES, COUNCILS, INSTITUTES,
AND STANDARDS
Air-Condition and Refrigeration Institute ARI Air Movement and Control Association International, Inc. AMCA American Bearing Manufactures Association ABMA American Concrete Institute ACI American Ladder Institute ALI American Institute of Steel Construction AISC American National Standards Institute ANSI American Plywood Association APA American Society of Civil Engineers ASCE American Society for Testing and Materials ASTM American Society of Mechanical Engineers ASME American Welding Society AWS American Wood Preserve Bureau AWPB American Wood Protection Association AWPA Building Officials and Code Administrators BOCA California Roof Rating Council CRRC Clean Air Act CAA Clean Water Act CWA Chain Link Fence Manufacturing Institute CLFMI Code of Federal Regulation CFR Concrete Reinforcing Steel Institute CRSI Construction Specification Institute CSI Department of Environmental Protection DEP Electronic Industries Alliance EIA Environmental Protection Agency EPA Gypsum Association GA International Organization for Standardization ISO Institute of Electrical and Electronic Engineers IEEE Leadership in Energy and Environmental DesignLEED Metal Lath/Steel Framing Association ML/SFA National Asphalt Pavement Association NAPA National Association of Corrosion Engineers NACE National Electric Code NEC National Fire Protection Association NFPA National Institute of Standards and Technology NIST National Sanitation Foundation NSF National Society of Professional Engineers NSPE Occupational Safety and Health Act OSHA National Electric Manufactures Association NEMA Plastic Pipe Institute PPI Portland Cement Association PCA Precast/Prestressed Concrete Institute PCI
PAGE 14 OF 56 1305M323QNFFM0118
Resource Conservation and Recovery Act RCRA Steel Door Institute SDI Telecommunication Industry Association TIA Uniform Construction CodeUCC Underwriters Laboratories UL United States Army Corps of Engineers USACE United States Coast Guard USCG United States Green Building Council USGBC Western Wood Products Association WWPA Western Wood Preservation Institute WWPI
PAGE 15 OF 56 1305M323QNFFM0118
APPENDIX 2
ACRONYMS
Air-Condition and Refrigeration Institute ARI Air Movement and Control Association International, Inc. AMCA American Bearing Manufactures Association ABMA American Concrete Institute ACI Asbestos Containing Material ACM American Institute of Steel Construction AISC American National Standards Institute ANSI American Plywood Association APA American Society of Civil Engineers ASCE American Wood Preserve Bureau AWPB American Wood Protection Association AWPA Above ground Storage Tank AST American Society for Testing and Materials ASTM American Society of Mechanical Engineers ASME American Welding Society AWS Best Management Practices BMP Building Officials and Code Administrators BOCA California Roof Rating Council CRRC Clean Air Act CAA Clean Water Act CWA Chain Link Fence Manufacturing Institute CLFMI Chromatid Copper Arsenate CCA Cubic Feet per Minute CFM Code of Federal Regulation CFR Concrete Masonry Unit CMU Concrete Conc Contracting Officer CO Contracting Officers Representative COR Contracting Officers Technical Representative COTR Demarcation point
DEMARC
Demolition Demo Department of Environmental Protection DEP Drawing Dwg Ethylene Propylene Diene Monomer EPDM Electronic Industries Alliance EIA Elevation Elev Encased Burial EB Environmental Protection Agency EPA
PAGE 16 OF 56 1305M323QNFFM0118
Feet Ft Factory Mutual FM Finish Floor FF Fire Rated FR Fiberglass Reinforced Product FRP Gauge Ga General Contractor GC Gallons per Minute GPM Gypsum GYP Gypsum Association GA International Organization for Standardization ISO Inch In Information Technology IT Institute of Electrical and Electronic Engineers IEEE Leadership in Energy and Environmental DesignLEED Linear Feet LF Maximum MAX Metal Lath/Steel Framing Association ML/SFA Mean High Water MHW Mean Low Water MLW Mile Per Hour MPH Material Safety Data Sheets MSDS National Electric Code NEC National Fire Protection Association NFPA National Institute of Standards and Technology NIST National Sanitation Foundation NSF Notice To Proceed NTP Not To Scale NTS On Center OC Ounce OZ Outside Diameter OD Occupational Safety and Health Act OSHA No Added Urea Formaldehyde NAUF National Electrical Manufacturers Association NEMA Not To Scale NTS Parts Per Billion PPB Parts Per Million PPM Pounds lbs Pounds per Square Inch PSI Polyvinyl Chloride PVC Professional Engineer PE Programmable Logic Controllers PLC Resource Conservation and Recovery Act RCRA Schedule Sch Steel Door Institute SDI Square Feet SF Statement Of Work SOW Solar Reflectance Index SRI
PAGE 17 OF 56 1305M323QNFFM0118
Sound Transmission Class STC Square Sq Telecommunication Industry Association TIA Thick Thk Typical Typ Uniform Construction CodeUCC Underwriters Laboratories UL United States Army Corps of Engineers USACE United States Coast Guard USCG United States Green Building Council USGBC Veneered Faced Panel Products HPVA Underground Storage TankUST Vinyl Asbestos Floor Tile VAT Volatile Organic Carbon VOC Welded Wire Fabric WWF Western Wood Products Association WWPA
Construction Clauses
PAGE 18 OF 56 1305M323QNFFM0118
PART I - CONSTRUCTION PURCHASE ORDER CLAUSES
(FIXED-PRICE)
UPDATED THROUGH FAC 2023-04 (JUN 2023) (DEVIATION 2023-03) (DEC 2022)
FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:
https://www.acquisition.gov/far/index.html
(End of Clause)
CLAUSE
NUMBER TITLE DATE
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements
JAN 2017
52.204-9 Personal Identity Verification of Contractor Personnel
JAN 2011
52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards
JUN 2020
52.204-13 System for Award Management Maintenance OCT 2018 52.204-19 Incorporation by Reference of Representations and
Certifications DEC 2014 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities.
NOV 2021
52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment
NOV 2021
52.204-27 Prohibition on a ByteDance Covered Application JUN 2023 52.209-6 Protecting The Government's Interest When
Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment
NOV 2021
52.209-10 Prohibition on Contracting with Inverted Domestic Corporations
NOV 2015
52.219-6 Notice of Total Small Business Set-Aside NOV 2020 52.219-13 Notice of Set-Aside of Orders MAR 2020 52.219-28 Post-Award Small Business Program
Rerepresentation MAR 2023 52.219-32 Orders Issued Directly Under Small Business
Reserves
MAR 2020
52.222-3 Convict Labor JUN 2003 52.222-6 Construction Wage Rate Requirement AUG 2018 52.222-7 Withholding of Funds MAY 2014 52.222-8 Payrolls and Basic Records JUL 2021 52.222-9 Apprentices and Trainees JUL 2005 52.222-10 Compliance with Copeland Act Requirements FEB 1988 52.222-11 Subcontracts (Labor Standards) MAY 2014 52.222-12 Contract Termination - Debarment MAY 2014 52.222-13 Compliance with Construction Wage Rate
Requirements and Related Regulations
MAY 2014
52.222-14 Disputes Concerning Labor Standards FEB 1988
PAGE 19 OF 56 1305M323QNFFM0118
NUMBER TITLE DATE
52.222-15 Certification of Eligibility MAY 2014 52.222-19 Child Labor—Cooperation with Authorities and
Remedies
DEC 2022
52.222-21 Prohibition of Segregated Facilities APR 2015 52.222-26 Equal Opportunity SEPT 2016
52.222-27 Affirmative Action Compliance Requirements for Construction
APR 2015
52.222-35 Equal Opportunity for Veterans JUN 2020
52.222-36 Equal Opportunity for Workers with Disabilities JUN 2020 52.222-37 Employment Reports on Veterans JUN 2020
52.222-50 Combating Trafficking in Persons JAN 2022 52.222-55 Minimum Wages Under Executive Order 14026 JAN 2022 52.222-62 Paid Sick Leave Under Executive Order 13706 JAN 2022 52.223-3 Hazardous Material Identification and Material
Safety Data (Alternate I)
FEB 2021
52.223-5 Pollution Prevention and Right-to-Know Information (Alternate I) (AUG 2003)
MAY 2011
52.223-12 Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
JUN 2016
52.223-18 Contractor Policy to Ban Text Messaging While Driving
JUN 2020
52.225-13 Restrictions on Certain Foreign Purchases FEB 2021 52.227-4 Patent Indemnity-Construction Contracts DEC 2007 52.228-11 Pledges of Assets (Deviation 2020-05) (April 2020) FEB 2021 52.228-14 Irrevocable Letter of Credit NOV 2014 52.232-5 Payments under Fixed Price Construction Contracts MAY 2014 52.232-18 Availability of Funds APR 1984 52.232-23 Assignment of Claims MAY 2014 52.232-27 Prompt Payment for Construction Contracts JAN 2017 52.232-33 Payment by Electronic Funds Transfer--System for Award Management.
OCT 2018
52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors (Mar 2023) MAR 2023 52.233-1 Disputes MAY 2014 52.233-3 Protest After Award AUG 1996 52.233-4 Applicable Law for Breach of Contract Claim OCT 2004 52.236-2 Differing Site Conditions APR 1984 52.236-3 Site Investigation and Conditions Affecting the Work APR 1984 52.236-5 Material and Workmanship APR 1984 52.236-7 Permits and Responsibilities NOV 1991 52.236-8 Other Contracts APR 1984 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
APR 1984
PAGE 20 OF 56 1305M323QNFFM0118
NUMBER TITLE DATE
52.236-10 Operations and Storage Areas APR 1984 52.236-12 Cleaning Up APR 1984 52.236-14 Availability and Use of Utility Services
Water and electric is provided to the contractor at no charge.
APR 1984
52.242-14 Suspension of Work APR 1984 52.243-5 Changes and Changed Conditions APR 1984 52.244-6 Subcontracts for Commercial Products and
Commercial Services
MAR 2023
52.246-12 Inspection of Construction AUG 1996 52.246-21 Warranty of Construction MAR 1994 52.249-1 Termination for Convenience of the Government
(Fixed-Price) (Short Form)
APR 1984
52.249-10 Default (Fixed-Price Construction) APR 1984 52.253-1 Computer Generated Forms JAN 1991
FAR 52.252-6 Authorized Deviations in Clauses (Nov 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the clause.
(b) The use in this solicitation or contract of any Department of Commerce (48 CFR 1352) clause with an authorized deviation is indicated by the addition of “(DEVIATION)” after the name of the regulation.
(End of clause)
FAR 52.211-10 Commencement, Prosecution and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 120 days after award. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
FAR 52.225-9 Buy American—Construction Materials (OCT 2022)
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
(i) A commercial product (as defined in paragraph (1) of the definition of “commercial product” at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
PAGE 21 OF 56 1305M323QNFFM0118
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United
States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A)The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material.
The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the
PAGE 22 OF 56 1305M323QNFFM0118
construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
________________________________________________[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph
(b)(2) of this clause if the Government determines that-
(i)The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1)The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2)For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent
PAGE 23 OF 56 1305M323QNFFM0118
domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of
January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components. (1)The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2)For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(B)(1) of this clause.
(3)The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of
January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1) (i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
PAGE 24 OF 56 1305M323QNFFM0118
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
FOREIGN AND DOMESTIC CONSTRUCTION MATERIALS PRICE COMPARISON
Construction Material Description Unit of Measure Quantity Price (Dollars)*
Item 1:
Foreign construction material _______ _______ _______
Domestic construction material _______ _______ _______
Item 2: _______ _______ _______
Foreign construction material _______ _______ _______
Domestic construction material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.]
[Include other applicable supporting information.]
Alternate I (Oct 2022). As prescribed in 25.1102(a)(3) substitute the following sentence for the first sentence in paragraph (1)(ii)(A) of the definition of “domestic construction material” in paragraph (a):
(A) The cost of its components mined, produced, or manufactured in the United States exceeds __ percent of the cost of all its components. [ Contracting officer to insert the percentage. ]
FAR 52.228-13 Alternative Payment Protections (JULY 2000)
(a) The Contractor shall submit one of the following payment protections:
- Irrevocable Letter of Credit
- Payment Bond
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within seven (7) days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
PAGE 25 OF 56 1305M323QNFFM0118
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
COMMERCE ACQUISITION REGULATIONS (CAR)
CAR 1352.201-70 Contracting Officer's Authority (April 2010) The Contracting Officer is the only person authorized to make or approve any changes in any of the requirements of this contract and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely in the Contracting Officer. In the event the Contractor makes any changes at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority and no adjustment will be made in the contract terms and conditions, including price.
CAR 1352.201-72 Contracting Officer’s Representative (COR) (April 2010)
(a) The Contracting Officer’s Representative (COR) will be identified under separate cover after award. The COR may be changed at any time by the Government without prior notice to the contractor by issuance of a new appointment letter. The location of the COR will be provided at the issuance of the COR appointment letter.
(b) The responsibilities and limitations of the COR are as follows:
(1) The COR is responsible for the technical aspects of the contract and serves as technical liaison with the contractor. The COR is also responsible for the final inspection and acceptance of all deliverables and such other responsibilities as may be specified in the contract.
(2) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor request for changes shall be referred to the Contracting Officer directly or through the COR. No such changes shall be made without the express written prior authorization of the Contracting Officer. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor.
CAR 1352.209-73 Compliance with the Laws (April 2010) The contractor shall comply with all applicable laws, rules and regulations which deal with or relate to performance in accord with the terms of the contract.
CAR 1352.209-74 Organizational Conflict of Interest (APR 2010)
(a) Purpose. The purpose of this clause is to ensure that the contractor and its subcontractors:
(1) Are not biased because of their financial, contractual, organizational, or other interests which relate to the work under this contract, and
(2) Do not obtain any unfair competitive advantage over other parties by virtue of their performance of this contract.
(b) Scope. The restrictions described herein shall apply to…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .