SF 1449 - N6449825Q0262.pdf

PDF 2 MB Posted

Attached to
Propulsion Shaft Deep Rolling Effort
Solicitation number
N6449825Q0262
Issued by

About this file

This Standard Form 1449 (SF 1449) is a solicitation for a Women-Owned Small Business (WOSB) contract for Propulsion Shaft Deep Rolling Effort, issued by the Naval Surface Warfare Center Philadelphia Division. The contract (N6449825Q0262) is a firm-fixed-price requirement for non-recurring engineering services to perform deep rolling on a government-furnished, condemned propulsion shaft using ECOROLL deep rolling equipment. The contractor will prep the shaft by removing a copper-nickel sleeve, machining the shaft body to remove corrosion, and deep rolling three sections of the shaft body. Subsequently, a separate government contractor will conduct residual stress measurements, after which the contractor must extract core samples from five measurement locations.

The solicitation has a proposal due date of 04 Aug 2025 at 03:00 PM, with a performance period from 04 Aug 2025 to 06 Oct 2025. The contract is set aside for Women-Owned Small Businesses (WOSB), specifically Economically Disadvantaged Women-Owned Small Businesses (EDWOSB), with a NAICS code 336611 and size standard of 1,300 employees. The technical point of contact is Jason Tsui, who can be reached at jason.c.tsui.civ@us.navy.mil or (267) 885-7839. All work will be performed at the contractor's facility, and no travel is required for this effort.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Section A - Solicitation/Contract Form

Propulsion Shaft Deep Rolling Effort

N6449825Q0262

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Propulsion Shaft Deep Rolling See Section C Statement of Work.

NOTE: The requirements in DFARS 252.211-7003, Item Identification and Valuation, are applicable for this line item. The contractor shall provide DoD unique identification or a DoD recognized unique identification equivalent.

Pricing Arrangement: Firm Fixed Price PR Number: NOPR PR Line Item Number: 0001

1 Lot

Section C - Description/Specifications/Statement of Work

Statement of Work (SOW)

Propulsion Shaft Deep Rolling Effort

1.0 INTRODUCTION

1.0.1 The Naval Surface Warfare Center Philadelphia Division (NSWCPD) is a Department of Defense entity responsible for research and development, test and evaluation, engineering and fleet support organization for the Navy's ships, submarines, military watercraft and unmanned vehicles. This requirement is for NSWCPD Code 427, which is responsible for propulsion shafting systems including propulsion shafts, line shaft bearings, waterborne bearings, bulkhead shaft seals, and stern tube shaft seals.

1.0.2 This contract is for non-personal services. It does not create employment rights with the U.S. Government whether actual, inherent, or implied.

1.0.3 Government/Contractor Relationship

1.0.3.1 The services to be delivered under this Contract are non-personal services and the parties recognize and agree that no employer-employee relationship exists or will exist under the Contract between the Government and the Contractor's personnel. Therefore, it is in the best interest of the Government to provide both parties a full understanding of their respective obligations.

1.0.3.2 The Contractor employees shall identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel and displaying distinguishable badges or other visible identification for meetings with Government personnel. In addition, Contractor personnel shall appropriately identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.

1.0.3.3 Contractor personnel under this Contract shall not engage in any of the inherently Governmental functions listed at FAR Subpart 7.5 or DFARS Subpart 207.5.

1.0.4 Employee Relationship:

1.0.4.1 The services to be performed under this Contract do not require the Contractor or its personnel to exercise personal judgment and discretion on behalf of the Government. Rather the Contractor's personnel will act and exercise personal judgment and discretion on behalf of the Contractor.

1.0.4.2 Rules, regulations, directives, and requirements that are issued by the U. S. Navy and NSWCPD under its responsibility for good order, administration, and security are applicable to all personnel who enter a Government installation or who travel on Government transportation. This is not to be construed or interpreted to establish any degree of Government control that is inconsistent with a non-personal services contract.

1.0.4.3 Inapplicability of Employee Benefits: This Contract does not create an employer-employee relationship. Accordingly, entitlements and benefits applicable to such relationships do not apply.

1.0.4.4 It is the Contractor's, as well as the Government's, responsibility to monitor Contract activities and notify the Contracting Officer if the Contractor believes that the intent of this Section has been or may be violated.

1.0.4.4.1 The Contractor shall notify the Contracting Officer in writing via letter or email within three (3) calendar days from the date of any incident that the Contractor considers to constitute a violation of this Section. The notice should include the date, nature, and circumstances of the conduct; the name, function, and activity of each Government employee or Contractor official or employee involved or knowledgeable about such conduct; identify any documents or substance of any oral communication involved in the conduct; and the Contractor's estimated date when, absent a response, cost, schedule or performance will be impacted.

1.0.4.4.2 The Contracting Officer will, within five (5) calendar days after receipt of notice, respond to the notice in writing. In responding, the Contracting Officer will either:

(i) Confirm the conduct is in violation and when necessary direct the mode of further performance,

(ii) Countermand any communication regarded as a violation,

(iii) Deny that the conduct constitutes a violation and when necessary direct the mode of further performance, or

(iv) In the event the notice is inadequate to make a decision, advise the Contractor what additional information is required, and establish the date by which it should be furnished by the Contractor.

1.1 BACKGROUND

The Propulsion Shafting Systems, Surface Ship Propellers, Waterjets, and Rudders Branch (Code 427) provides Research and Development (R&D) services related to propulsion shafting and associated components. Code 427 is the primary activity for the performance of machinery testing, providing technical support, and acting as the single point of contact for all aspects of cognizant equipment procurement and fleet introduction, including specification development, contract preparation, participation at design reviews, first article testing, on-site engineering investigations, evaluations, and equipment problem resolutions/repairs. R&D related to inducing compressive stress on a propulsion shaft to increase fatigue resistance require a test article to be deep rolled using ECOROLL deep rolling equipment for testing of material property changes.

1.2 SCOPE OF WORK

The contractor shall provide non-recurring engineering services to perform deep rolling on a government-furnished, condemned propulsion shaft using government-furnished ECOROLL deep rolling equipment. The shaft shall be prepped for testing, including removal of a copper-nickel sleeve and machining of the shaft body to remove existing corrosion. Deep rolling will be performed on three sections of the shaft body. Once deep rolled, the contractor shall allow a sub-contractor (from separate government contract) to perform residual stress measurements on the rolled surfaces as well as two separate surfaces underneath the sleeve location. After completion of the residual stress measurements, the contractor shall extract core samples from the five measurement locations.

2 APPLICABLE DOCUMENTS

2.1 Enclosure 1 - Shaft Deep Rolling Diagrams

2.2 Enclosure 2 - Shaft Deep Rolling Data Sheet

3 REQUIREMENTS

3.1 Propulsion Shaft Deep Rolling

3.1.1 The Contractor shall receive, uncrate, and unpackage an F-condition, government-furnished, CG-47 class propeller shaft and prepare for deep rolling.

3.1.1.1 The approximate crate weight is 85,000 lbs with dimensions 64 inches wide, 74 inches high, and 57 feet long.

3.1.2 The Contractor shall align the shaft in the lathe by minimizing runouts as close to both shaft ends as practical and prepare the shaft for machining and deep rolling

3.1.2.1 The contractor shall manufacture (or utilize existing, contractor-owned) bore plugs (not provided) to allow the propulsion shaft to be installed between lathe centers.

3.1.2.2 The Contractor shall cut and remove the AFT sleeve.

3.1.2.2.1 The sleeve dimensions are approximately 28.580 inches outside diameter, 26.330 inches inside diameter and 132 inches long.

3.1.2.2.2 Sleeve removal shall not damage or otherwise alter the surface of the existing sleeve fit journal area.

3.1.2.3 The Contractor shall machine the shaft body to remove existing rust for a length of at least 50 inches.

3.1.2.3.1 The shaft body dimensions are approximately 24.250" outside diameter and 300 inches long.

3.1.2.3.2 The surface finish of the 50 inch machined section shall be 32 uin Ra to 64 uin Ra.

3.1.3 The Contractor shall deep roll the shaft using government-furnished ECOROLL equipment in three locations, 10 inches each, spaced at least 5 inches apart within the 50 inch machined section of the shaft body

3.1.3.1 The Contractor shall ensure the shaft is stabilized throughout the deep rolling process. The recommended shaft rotational speed is 20 RPM or less. Vibration and chatter shall be minimized by adjusting the RPM such that the deep rolled surfaces have improved to be smoother than the non-rolled surface and without uneven texture. Rippled surfaces with waviness, ridges, damage, or peels are evidence of unsatisfactory deep rolling. If unsatisfactory deep rolled surfaces are encountered at a specific test site location, the location can still be utilized provided that a minimum of 8 inches length of smooth surface is available following correction of the shaft RPM, otherwise, a new test site location shall be started and the test repeated using reduced shaft speed.

3.1.3.2 The Contractor shall take photos of the test site locations once identified and prior to any rolling. The Contractor shall take photos of test sites #3, #4, and #5 following the deep rolling process and prior to preserving. The Contractor shall record the information in the data sheet provided in Enclosure 2 and submit, along with the before and after photos of the test site as a final report via CDRL A004 following completion of testing

3.1.3.3 The first rolled location (Test Site #3 in Enclosure 1, Figure 1) shall be rolled with an ECOROLL HG19 roller at 400 bar pressure with the roller normal to the shaft and transversing at a 0.015 inch per revolution feed rate. The shaft shall be rolled at this location for an axial shaft length of 10 inches.

3.1.3.4 The second rolled location (Test Site #4 in Enclosure 1, Figure 1) shall be rolled with an ECOROLL HG38 roller at 400 bar pressure with the roller normal to the shaft and transversing at a 0.015 inch per revolution feed rate. The shaft shall be rolled at this location for an axial shaft length of 10 inches.

3.1.3.5 The third rolled location (Test Site #5 in Enclosure 1, Figure 1) shall be rolled with an ECOROLL HG38 roller at 400 bar pressure with the roller oriented 30 degrees from normal to the shaft (refer to Enclosure 1, Figure 3) and transversing at a 0.015 inch per revolution feed rate. The shaft shall be rolled at this location for an axial shaft length of 10 inches.

3.1.4 The Contractor shall preserve the test areas of the shaft due to be analyzed for residual stress measurements

3.1.4.1 The Contractor shall preserve Test Sites #1 #2, #3, #4, and #5 (refer to Enclosure 1) on the sleeve fit area

3.1.4.1.1 The Contractor shall identify an area of the sleeve fit journal area with the least amount of corrosion and overall best surface condition. This area shall be Test Site #2

3.1.4.1.2 The Contractor shall wipe the test site locations with lint-free cloths with solvent

3.1.4.1.3 The Contractor shall be lightly oil the test site locations after allowing them to air-dry

3.1.4.1.4 The Contractor shall mask the test site locations and preserve with polyethylene tape, or equal

3.1.4.2 The Contractor shall set the shaft aside for residual stress measurements.

3.1.5 The Contractor shall allow a residual stress measurement contractor (entirely funded under an alternative government contract) to come on-site and perform in-situ residual stress measurements using the Hole Drilling and Deep Hole Drilling methods at the five test site locations

3.1.5.1 The residual stress measurement contractor team will consist of U.S. citizens and conform to all required security and visit requirements of the Contractor prior to their arrival

3.1.5.2 The Contractor shall provide the residual stress measurement contractor with standard wall outlet AC power, shop air, and repositioning or rotating the shaft as necessary

3.1.6 The Contractor shall extract trepan samples from the five test sites

3.1.6.1 Each residual stress measurement Test Site described within Enclosure 1 shall have a core sample extracted no less than 2 inches in diameter and no greater than four inches in diameter extending through the thickness of the shaft

3.1.6.2 The core samples shall be extracted at the same circumferential and longitudinal locations where the residual stress measurements were taken

3.1.6.3 Alternative means of extracting samples from the five test site locations may be proposed to the government for consideration.

3.1.6.4 The set of five core samples shall be packaged and shipped to

3.1.6.4.1 ATTN: Tyler Christ

9500 MacArthur Blvd

Bethesda, MD 20817

3.1.7 The Contractor shall package and return the provided ECOROLL equipment to the following location upon completion of testing

3.1.7.1 ATTN: Jason Tsui

Building 542

1601 Langley Ave

Philadelphia, PA 19112

3.2 Not Applicable

3.3 Manufacturing Phase-Out or Discontinuation of Production, Diminishing Sources, and Obsolete Materials or Components

3.3.1 The contractor shall notify the contracting officer immediately upon determining the unavailability of obsolete materials or components. The contractor may recommend a solution to include the impact on the contract price and delivery. The contractor shall not initiate any item redesign or incur any additional costs without the express, written authorization of the contracting officer.

3.4 Not Applicable

3.5 Not Applicable

4.0 DATA REQUIREMENTS

- CDRL A001, Contract Status Report

CDRL A002, Government Property Inventory Report (PERIODIC) CDRL A003, Government Property Inventory Report (FINAL) CDRL A004, Final Report

5.0 SECURITY REQUIREMENTS

5.1 SECURITY TRAINING . Not Applicable

5.2 ON SITE WORK. Not Applicable

5.2.1 Not Applicable

5.2.4 Not Applicable

5.3 Not Applicable

5.4 OPERATIONS SECURITY (OPSEC)

The Contractor shall protect critical information associated with this contract to prevent unauthorized disclosure. The NSWC Philadelphia 5.4.1 Division's (NSWCPD) Critical Information List (CIL)/ CIIL (Critical Indicators and information list) will be provided on site, if warranted.

Performance under this contract requires the contractor to adhere to OPSEC requirements, which may include the NSWCPD Contractor OPSEC Plan.

When the NSWCPD Contractor OPSEC Plan is required, the contractor shall return acknowledgment of the plan within 15 days of receipt. During the period of this contract, the Contractor may be exposed to, use, or produce, NSWCPD Critical Information (CI) and/or observables and indicators which may lead to discovery of CI. NSWCPD's CI will not be distributed to unauthorized third parties, including foreign governments, or companies under Foreign Ownership, Control, or Influence (FOCI) unless such FOCI has been appropriately mitigated through measures approved by the Defense Counterintelligence and Security Agency. Questions concerning these requirements shall be directed to the PCO.

5.4.2 CUI correspondence transmitted internally on the contractor's unclassified networks or information systems, and externally, shall be protected per NIST SP-800-171, Protecting Controlled Unclassified Information (CUI) in Non-federal Systems and Organizations.

Assembled large components/systems being transported to and from testing areas, other production or government facilities (whether or not on public roadways) shall be in an enclosed van trailer or covered flatbed trailer. Component/System outside storage, staging, and test areas shall be shielded /obscured from public view wherever physically possible.

5.4.3 NSWCPD's CI shall not be publicized in corporate wide newsletters, trade magazines, displays, intranet pages or public facing websites. Media requests related to this project shall be directed to the PCO, and the COR who will forward the required to the NSWCPD Public Release Authority for review.

5.4.4 Any attempt by unauthorized third parties to solicit, obtain, photograph, or record, or; incidents of loss/compromise of government Classified or CI, Business Sensitive, Company Proprietary information related to this or other program must be immediately reported to the contractor's Facility Security Officer and Cognizant Security Office and/or the Naval Criminal Investigative Service, and the NSWC PD Security Division (Code 105).

5.4.5 This SOW has been reviewed against the requirements of SECNAVINST 4200.35. SAIRC controls are not required

5.5 RECEIPT, STORAGE, AND GENERATION OF CONTROLLED UNCLASSIFIED INFORMATION (CUI) All Controlled Unclassified Information (CUI) associated with this contract must follow the minimum marking requirements of DoDI 5200.48, Section 3, paragraph 3.4.a, and include the acronym "CUI" in the banner and footer of the document. In accordance with DoDI 5200.48, CUI must be safeguarded to prevent Unauthorized Disclosure (UD). CUI export controlled technical information or other scientific, technical, and engineering information must be marked with an export control warning as directed in DoDI 5230.24, DoDD 5230.25, and Part 250 of Title 32, CFR. Nonfederal information systems storing and processing CUI shall be protected per NIST SP-800-171, or subsequent revisions. All transmissions to personal email accounts (AOL, Yahoo, Hotmail, Comcast, etc.) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.) are prohibited. Destroy CUI associated with this contract by any of the following approved methods: A cross-cut shredder; a certified commercial destruction vendor; a central destruction facility; incineration; chemical decomposition; pulverizing, disintegration; or methods approved for classified destruction.

5.6 Planning, Programming, Budgeting and Execution (PPBE) Data .

When contractor employees, in the performance of their duties, are exposed to Planning, Programming, Budgeting and Execution (PPBE) data, a Non- Disclosure Agreement (NDA) with all affected contactor personnel must be executed in coordination with the COR and PCO to ensure safeguarding disclosure of this data.

5.7 Not Applicable

5.8 Not Applicable

6.0 PLACE OF PERFORMANCE

6.1 All work will be performed at the Contractor's facility

7.0 TRAVEL

7.1 No travel is required for this effort.

8.0 GOVERNMENT FURNISHED PROPERTY

GFP is required for completion of tasks under this SOW. All Government Furnished Property is property of the U.S. Government and shall not be transferred to any individual or agency, public or private, without the express written approval of the originating Contracting Officer. Accountability for Government Property under this task order shall be managed in accordance with FAR Part 45 and DFARS Part 245 as well as the Government Property clauses in the Task Order, regardless of whether the property is Contractor Acquired Property (CAP), GFP, or received directly from another commercial source as a deliverable from a Government issued contract.

Additional Government Property accountability requirements are outlined in the following Directives and Instructions and shall be adhered to as applicable:

DODI 4161.02, Accountability & Management of Government Contract Property DoDM 4140.01, DoD Supply Chain Material Management Procedures: Material Returns, Retention and Disposition DODI 5000.64, Accountability & Management of DoD Equipment and Other Accountable Property OPNAVINST 4440.26B, Operating Materials & Supplies and Government Furnished Material Management SECNAVINST 5200.43A, Property Management

All GFP identified in Attachment 1 will be provided no later than 30 days after award of contract.

8.1 Reporting

The Contractor shall perform reporting functions and actions to maintain an accurate accounting of property. Receipt Reporting: DFARS 252.245-requires the Contractor to report receipt of all GFP using the PIEE GFP Module.7005 "Management and Reporting of Government Property"

8.2 Shipping Notification

FAR 52.245-1 requires the Contractor to report when GFP is returned to the Government. DFARS 252.245-7005 "Management and Reporting of Government Property" requires this notification be in the form of a shipment through the GFP Module in PIEE.

8.3 Inventory Reporting

https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/416102p.pdf?ver=2019-04-15-094502-563 https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/414001p.pdf?ver=2019-03-06-083517-007 https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/500064p.pdf?ver=2019-06-10-100933-460 https://www.secnav.navy.mil/doni/Directives/04000%20Logistical%20Support%20and%20Services/04-400%20Supply%20and%20Material%20Services/4440.26B.pdf https://www.secnav.navy.mil/doni/Directives/05000%20General%20Management%20Security%20and%20Safety%20Services/05-200%20Management%20Program%20and%20Techniques%20Services/5200.43A.pdf

FAR 52.245-1 requires the Contractor to periodically perform, record, and disclose physical inventory results. While the FAR clause does not define "periodically," SECNAVINST

5200.43A requires on-hand inventory count reports to support property type specific inventory requirements as set forth in their respective governing instructions. The contractor shall provide an inventory report in accordance with CDRL A002. The Government Property Inventory Report outlines

. If the contractor does not possess any GFP, the Government Property Inventory the frequency of reporting based on property type per contract needs Report shall reflect no GFP on-hand as required on the reporting schedule.

The Contractor shall provide support within a reasonable time after the Government's written request to support any Government audit in which GFP, or its related documentation, is requested as part of normal audit processes.

8.4 Lost, Damaged or Stolen GFP Reporting

FAR clause 52.245-1 requires the Contractor to investigate and report to the Government all incidents of property loss as soon as the facts become known. DFARS 252.245-7005 "Management and Reporting of Government Property" further requires the Contractor to report lost, damaged or stolen Government property using the Property Loss functionality within the PIEE GFP Module. The Contractor shall support the Government's process to assign liability and document loss in support of lost, damaged or stolen GFP.

8.5 Excess Property Reporting

Per FAR 52.245-1, the Contractor shall promptly disclose and report Government property in its possession that is excess to contract performance.

8.6 Property Disposition

Government Property Distribution shall be in line with FAR 52.245-1(j) and DFARS 252.245-7005 "Management and Reporting of Government Property". The contractor shall provide a written notice to the Contracting Officer when property held under this contract has not been used in 100 calendar days. All General Equipment/assets provided as GFP shall be returned to the Government for disposition at the completion of its use unless

(otherwise directed in writing by the Contacting Officer or the Accountable Property Officer dependent on who is administering the contract). The Contractor shall complete the plant clearance inventory schedule using the plant clearance capability of the GFP module of the PIEE to generate an electronic equivalent of the SF 1428, Inventory Disposal Schedule.

The contractor shall obtain PCO or plant clearance officer approval (dependent on who is administering the contract) prior to disposal of excess GFP /CAP after the contractor completes the plant clearance inventory schedule.

8.6.1 Property Disposition Instructions

ECOROLL tooling and all associated components provided as GFP for execution of this contract shall be packaged and returned to the government within 30 days of completion of tasking.

8.6.2 Issuance of the DD 1149 "Requisition and Invoice/Shipping Document"

The contractor must obtain a DD1149 before removing any Government Furnished Property, including Plant, Property, and Equipment (PP&E) from NSWCPD premises for general use. For situations where the contractor picks up/replaces NSWCPD property for maintenance purposes, the contractor shall provide an equipment receipt, showing Manufacturer, Model/Part Number, Serial Number and Asset Number/Barcode, on their company letterhead to the COR. Any and all GFP returned to the Government shall include a DD 1149 to document transfer of liability back to the Government.

8.7 Property Closeout. IAW FAR 52.245-1, the Contractor shall promptly perform and report to the PCO or plant clearance officer (dependent on who is administering the contract) contract property closeout to include reporting, investigating and securing closure of all loss of Government property cases; physically inventorying all property upon termination or completion of this Contract/TO; and disposing of items at the time they are determined to be excess to contractual needs.

8.8 Property Tagging:

The contractor can either tag issued equipment or use the provided NSWCPD Plant property barcodes. If the contractor chooses to use their own tag, it shall not cover the NSWCPD barcode. The NSWCPD barcode, when provided shall be used on contractor inventory reports.

9.0 GOVERNMENT FURNISHED INFORMATION

Not Applicable

10.0 PURCHASES

11.0 Counterfeit Material Prevention

12.0 PERSONNEL

13.0 NSWCPD Electronic Cost Reporting and Financial Tracking (eCRAFT) System

14.0 SPECIAL REQUIREMENTS

15.0 TECHNICAL POINT OF CONTACT (TPOC)

The technical point of contact (TPOC) for this effort is Jason Tsui. Mr. Tsui can be reached at or (267) 885-7839.jason.c.tsui.civ@us.navy.mil

Requirements Propulsion Shaft Deep Rolling Effort

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (Oct 2018)

(a) NAVSEA may use a file room management support contractor, hereinafter referred to as "the support contractor", to manage its file room, in which all official contract files, including the official file supporting this procurement, are retained. These official files may contain information that is considered a trade secret, proprietary, business sensitive or otherwise protected pursuant to law or regulation, hereinafter referred to as "protected information". File room management services consist of any of the following: secretarial or clerical support; data entry; document reproduction, scanning, imaging, or destruction; operation, management, or maintenance of paper-based or electronic mail rooms, file rooms, or libraries; and supervision in connection with functions listed herein.

N6449825Q0262 mailto:jason.c.tsui.civ@us.navy.mil

(b) The cognizant Contracting Officer will ensure that any NAVSEA contract under which these file room management services are acquired will contain a requirement that:

(1) The support contractor not disclose any information;

(2) Individual employees are to be instructed by the support contractor regarding the sensitivity of the official contract files;

(3) The support contractor performing these services be barred from providing any other supplies and/or services, or competing to do so, to NAVSEA for the period of performance of its contract and for an additional three years thereafter unless otherwise provided by law or regulation; and,

(4) In addition to any other rights the contractor may have, it is a third party beneficiary who has the right of direct action against the support contractor, or any person to whom the support contractor has released or disclosed protected information, for the unauthorized duplication, release, or disclosure of such protected information.

(c) Execution of this contract by the contractor is considered consent to NAVSEA's permitting access to any information, irrespective of restrictive markings or the nature of the information submitted, by its file room management support contractor for the limited purpose of executing its file room support contract responsibilities.

(d) NAVSEA may, without further notice, enter into contracts with other contractors for these services. Contractors should enter into separate non-disclosure agreements with the file room contractor. Contact the Procuring Contracting Officer for contractor specifics. However, any such agreement will not be considered a prerequisite before information submitted is stored in the file room or otherwise encumber the government.

(End of Text)

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019) (Jan 2019)

Approval by the Government as required under this contract and applicable specifications shall not relieve the Contractor of its obligation to comply with the specifications and with all other requirements of the contract, nor shall it impose upon the Government any liability it would not have had in the absence of such approval.

(End of Text)

C-215-H002 CONTRACTOR PROPOSAL (NAVSEA) (OCT 2018) (Oct 2018)

(a) Performance of this contract by the Contractor shall be conducted and performed in accordance with detailed obligations to which the Contractor committed itself in Proposal dated in response to NAVSEA Solicitation No.

N6449825Q0262

(b) The technical volume(s) of the Contractor's proposal is(are) hereby incorporated by reference and made subject to the "Order of Precedence" (FAR 52.215-8) clause of this contract. Under the "Order of Precedence" clause, the technical volume(s) of the Contractor's proposal referenced herein is (are) hereby designated as item (f) of the clause, following "the specifications" in the order of precedence.

(End of Text)

C-227-H014 PROTECTION OF DEPARTMENT OF NAVY TRADEMARKS - BASIC (NAVSEA)

(JUL 2021)

(Jul 2021)

(a) The contractor shall not assert any claim, in any jurisdiction, based on trademark or other name or design-based causes of action that are based on rights the contractor believes it has in the term(s) _____ [contracting officers shall list terms(s) (Government assigned or approved nomenclature)] (the "Designation(s)"), against the Government or others authorized by the Government to use the Designation(s) (including the word(s), name, symbol, or design) acting within the scope of such authorization (i.e. claims for trademark infringement, dilution, trade dress infringement, unfair competition, false advertising, palming off, passing off, or counterfeiting). Such authorization shall be implied by the award of a Government contract to any party for the manufacture, production, distribution, use, modification, maintenance, sustainment, or packaging of the products and services identified under this contract, and the scope of such implied authorization is defined as the use of the Designation

(s) in performance under such contract by the prime contractor and its subcontractors and suppliers at any tier. In all other cases, the scope of the authorization will be defined by the Government in writing.

(b) The contractor shall notify the contracting officer at least 30 days before asserting rights in, or filing an application to register, any one of the Designation(s) in any jurisdiction within the United States. Any such notification shall be in writing and shall identify the Designation(s) (including the word(s), name, symbol, or design), provide a statement as to its intended use(s) in commerce, and list the particular classes of goods or services in which registration will be sought.

(End of Text)

C-233-H001 DOCUMENTATION OF REQUESTS FOR EQUITABLE ADJUSTMENT--BASIC

(NAVSEA) (OCT 2018)

(Oct 2018)

(a) For the purposes of this special contract requirement, the term "change" includes not only a change that is made pursuant to a written order designated as a "change order" but also (1) an engineering change proposed by the Government or by the Contractor and (2) any act or omission to act on the part of the Government in respect of which a request is made for equitable adjustment.

(b) Whenever the Contractor requests or proposes an equitable adjustment of $100,000 or more per vessel in respect to a change made pursuant to a written order designated as a "change order" or in respect to a proposed engineering change and whenever the Contractor requests an equitable adjustment in any amount in respect to any other act or omission to act on the part of the Government, the proposal supporting such request shall contain the following information for each individual item or element of the request:

(1) A description (i) of the work required by the contract before the change, which has been deleted by the change, and (ii) of the work deleted by the change which already has been completed. The description is to include a list of components, equipment, and other identifiable property involved. Also, the status of manufacture, procurement, or installation of such property is to be indicated. Separate description is to be furnished for design and production work. Items of raw material, purchased parts, components and other identifiable hardware, which are made excess by the change and which are not to be retained by the Contractor, are to be listed for later disposition;

(2) Description of work necessary to undo work already completed which has been deleted by the change;

(3) Description of work not required by the terms hereof before the change, which is substituted or added by the change. A list of components and equipment (not bulk materials or items) involved should be included. Separate descriptions are to be furnished for design work and production work;

(4) Description of interference and inefficiencies in performing the change;

(5) Description of each element of disruption and exactly how work has been, or will be disrupted:

(i) The calendar period of time during which disruption occurred, or will occur;

(ii) Area(s) aboard the vessel where disruption occurred, or will occur;

(iii) Trade(s) disrupted, with a breakdown of manhours for each trade;

(iv) Scheduling of trades before, during, and after period of disruption;

(v) Description of measures taken to lessen the disruptive effect of the change;

(6) Delay in delivery attributable solely to the change;

(7) Other work attributable to the change;

(8) Supplementing the foregoing, a narrative statement of the direct "causal" relationship between any alleged Government act or omission and the claimed consequences therefor, crossreferenced to the detailed information provided as required above;

and

(9) A statement setting forth a comparative enumeration of the amounts "budgeted" for the cost elements, including the material costs, labor hours and pertinent indirect costs, estimated by the Contractor in preparing its initial and ultimate proposal

(s) for this contract, and the amounts claimed to have been incurred and/or projected to be incurred corresponding to each such "budgeted cost" elements.

(c) Each proposal in excess of $100,000 submitted in support of a claim for equitable adjustment under any requirement of this contract shall, in addition to the information required by paragraph (b) hereof, contain such information as the Contracting Officer may require with respect to each individual claim item.

(d) It is recognized that individual claims for equitable adjustment may not include all of the factors listed in paragraph (b) above. Accordingly, the Contractor is required to set forth in its proposal information only with respect to those factors which are comprehended in the individual claim for equitable adjustment. In any event, the information furnished hereunder shall be in sufficient detail to permit the Contracting Officer to cross-reference the claimed increased costs, or delay in delivery, or both, as appropriate, submitted pursuant to paragraph (c) of this requirement, with the information submitted pursuant to paragraph (b) hereof.

(End of Text)

Section D - Packaging and Marking

Additional Regulation or Supplemental Clauses Incorporated by Full Text

D-247-W001 PROHIBITED PACKING MATERIALS (NAVSEA) (OCT 2018) (Oct 2018)

The use of asbestos, excelsior, newspaper or shredded paper (all types including waxed paper, computer paper and similar hygroscopic or non-neutral material) is prohibited. In addition, the use of yellow wrapping or packaging material is prohibited except where used for the containment of radioactive material. Loose fill polystyrene is prohibited for shipboard use.

(End of Text)

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (DEC 2020) (Dec 2020)

Item(s) The supplies furnished hereunder shall be packaged in accordance with ASTM-D-3951-18, Standard Practice for Commercial Packing.0001

(End of Text)

Section E - Inspection and Acceptance

Overall Contract Inspection/Acceptance Locations

Inspection and Acceptance Location

Both Destination Instructions: contact TPOC upon delivery

DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112

PHILADELPHIA, PA 19112

UNITED STATES

Greg Dobbs, TPOC Email: Gregory.s.dobbs.civ@us.navy.mil Telephone: 267-760-3423

Section F - Deliveries or Performance

Contractor Destination

Line Item Delivery Schedule Quantity Address and POC

Delivery Period From 04 Aug 2025 to 06 Oct 2025

Delivery Period From 13 Jun 2025 to 30 Apr 2026

Period of Performance From 04 Aug 2025 To 06 Oct 2025

1 Lot Ship To DoDAAC: N64498 CountryCode: USA

NSWC PHILADELPHIA DIV

1601 LANGLEY AVE BUILDING 542, PHILADELPHIA PA 19112

PHILADELPHIA, PA 19112

UNITED STATES

Greg Dobbs, TPOC Email: Gregory.s.dobbs.civ@us.navy.mil Telephone: 267-760-3423

Ship To DoDAAC: N00024

NAVSEA HQ GF

NAVAL SEA SYSTEMS COMMAND

1333 Isaac Hull Avenue SE Bldg 197

WASHINGTON DC USA

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

Invoice 2in1 For Services

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF Document routing.

when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC N64500

Issue By DoDAAC N64498

Admin DoDAAC N64498

Inspect By DoDAAC N64498

Ship To Code N64498

Ship From Code ____

Mark For Code ____

Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____

Accept at Other DoDAAC ____

LPO DoDAAC ____

DCAA Auditor DoDAAC ____

Other DoDAAC(s) ____

(*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in Payment request.

accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F. Receiving report.

(g) WAWF point of contact.

Greg Dobbs

Gregory.s.dobbs.civ@us.navy.mil

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

N64498 - Caitlin Tamase email: caitlin.i.tamase.civ@us.navy.mil

(215) 756-2962

GAM Mailbox - email: NSWCPD_WAWF_GAM@navy.mil"

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Additional Regulation or Supplemental Clauses Incorporated by Full Text

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN

2019)

(Jan 2019)

(a) For other than firm fixed priced contract line item numbers (CLINs), the Contractor agrees to segregate costs incurred under this contract/task order (TO), as applicable, at the lowest level of performance, either at the sub line item number (SLIN) or CLIN level, rather than at the total contract/TO level, and to submit invoices reflecting costs incurred at that level. Supporting documentation in Wide Area Workflow (WAWF) for invoices shall include summaries of work charged during the period covered as well as overall cumulative summaries by individual labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost break down of other direct costs (ODCs), materials, and travel, by technical instruction (TI), SLIN, or CLIN level. For other than firm fixed price subcontracts, subcontractors are also required to provide labor categories, rates, and hours (both straight time and overtime) invoiced; as well as, a cost breakdown of ODCs, materials, and travel invoiced. Supporting documentation may be encrypted before submission to the prime contractor for WAWF invoice submittal. Subcontractors may email encryption code information directly to the Contracting Officer and Contracting Officer Representative (COR). Shouldthe subcontractor lack encryption capability, the subcontractor may also email detailed supporting cost information directly to the Contracting Officer and COR; or other method as agreed to by the Contracting Officer.

(b) Contractors submitting payment requests and receiving reports to WAWF using either Electronic Data Interchange (EDI) or Secure File Transfer Protocol (SFTP) shall separately send an email notification to the COR and Contracting Officer on the same date they submit the invoice in WAWF. No payments shall be due if the contractor does not provide the COR and Contracting Officer email notification as required herein.

(End of Text)

G-242-H001 GOVERNMENT CONTRACTADMINISTRATION POINTS-OF-CONTACT AND

RESPONSIBILITIES (NAVSEA) (OCT 2023)

(Oct 2023)

(a) The Government reserves the right to administratively substitute any of the points of contact listed below at any time.

(b) The contracting officer is the only person authorized to change this contract or orders issued thereunder. The Contractor shall not comply with any order, direction or request of Government personnel - that would constitute a change - unless it is issued in writing and signed by the Contracting Officer or is pursuant to specific authority otherwise included as part of this contract. If, in the opinion of the contractor, an effort outside the existing scope of this contract is requested, the contractor shall promptly comply with the Notification of Changes clause of this contract.

(c) The points of contact are as follows:

(i) The Procuring Contracting Officer (PCO) is:

Shawn Waters

Contracting Officer

Contracts Department

NSWC Philadelphia

5001 South Broad Street

Bldg. 4, Flr 2, Room 2900

Philadelphia, PA 19112-5083

Gov’t Cell Phone: 267-990-6169 email: shawn.m.waters11.civ@us.navy.mil

(ii) The Contract Specialist is:

Frank Vennell

Contract Specialist

Naval Sea Systems Command (NAVSEA)

Naval Surface Warfare Center

5001 South Broad Street

Philadelphia, PA 19112-5083

Phone: 445-227-7606 email: frank.vennell@navy.mil

N6449825Q0262 mailto:shawn.m.waters11.civ@us.navy.mil mailto:frank.vennell@navy.mil

(iii) The Administrative Contracting Officer (ACO)is:

(d) The Contracting Officer's Representative (COR) is the contracting officer's appointed representative for technical matters. The COR is not a contracting officer and does not have the authority to direct the accomplishment of effort which is beyond the scope of the contract or to otherwise change any contract requirements. An informational copy of the COR appointment letter, which provides a delineation of COR authority and responsibilities, will be provided upon award of this contract.

The Contracting Officer's Representative (COR) is:

(e) The Alternate Contracting Officer's Representative (ACOR) is responsible for COR responsibilities and functions in the event that the COR is unavailable due to leave, illness, or other official business. The ACOR is appointed by the contracting officer; a copy of the ACOR appointment will be provided upon award of this contract.

The Alternate Contracting Officer's Representative (ACOR) is:

(f) The Technical Point of Contact (TPOC) is the contracting officer's representative for technical matters when a COR is not appointed. The TPOC is responsible for technical issues of contract administration, such as providing all items of Government Furnished Information (GFI), Government…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .