This solicitation is for the construction of a general purpose storage building at Fort Bragg, North Carolina. The U.S. Army Corps of Engineers, Wilmington District seeks a firm fixed price contract to provide construction services including metal insulated panels, roll-up doors, wall mounted mechanical ventilation, electric power and lighting, and card access systems. The project magnitude value is between $1,000,000 to $5,000,000. Solicitation number W912PM21B0013 will be issued electronically on or about July 30, 2021. The North American Industry Classification System code is 236220 for commercial and institutional building construction, and the size standard is $36,500,000. Network analysis will be required to support the project. The federal agency is the Department of the Army Corps of Engineers Engineering District Wilmington.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US ARMY CORPS
OF ENGINEERS
WILMINGTON DISTRICT
FORT BRAGG, NORTH CAROLINA
SOTF GENERAL PURPOSE STORAGE BUILDING
CONTRACT NO.: W912PM20D0003
TASK ORDER NO.: W912PM21F0019
ISSUE DATE: AUGUST 2021
INDEX OF DRAWINGS
SHEET # SHEET TITLE
G-001 COVER SHEET AND INDEX
VICINITY MAP
NO SCALE
C O
V E
R
S
H E
E T
A
N D
I
D E
X
G-001
M
P
E L
U C
I O
M
P
E L
U C
I O
J
P
A Q
U I N
G-002
GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
G-003
A-101 FIRST FLOOR PLAN
A-601
M-101 MECHANICAL - NEW WORK FLOOR PLAN
M-601
E-001 GENERAL NOTES AND LEGEND
EG101 GROUNDING AND LIGHTNING PROTECTION PLAN LAYOUT
EG501 LIGHTNING PROTECTION DETAILS
EL101 LIGHTING PLAN LAYOUT
ES101
POWER PLAN LAYOUT
TY101
ELECTRICAL SITE PLAN
MECHANICAL DETAILS AND SCHEDULES
DOOR SCHEDULE AND DETAILS
A-102 ROOF PLAN
A-103 REFLECTED CEILING PLAN
VICINITY MAPS & HAUL ROUTES
C-001 CIVIL NOTES AND LEGENDS
C-101 CIVIL SITE PLAN
C-102
C-103
C-501
C-502
EROSION CONTROL PLAN
CIVIL DETAILS
CIVIL DETAILS
ELECTRICAL SECURITY LAYOUT
EP101
A-201 ELEVATIONS
A-301 BUILDING AND WALL SECTIONS
GRADING AND DRAINAGE PLAN
B-101 GEOTECHNICAL - SOIL BORINGS PLAN
S-001 STRUCTURAL GENERAL NOTES
S-002 SPECIAL INSPECTIONS
SB101 FOUNDATION PLAN AND DETAILS
S O
L I C
I T
A T
I O
N
N
O
F I L
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
C
A N
S I
D
W P
M D
A U
G U
W P
M B
C A
T E
G O
R Y
D
E
U S
A
R M
Y
C
O R
P
F
E
N G
I N
E E
R S
W I L M
I N
G T
S
T R
I C
T
D
A R
L I N
G T
V E
W I L M
I N
G T
O N
N
C
R E
A D
Y
T
O
A
D V
E R
T I S
E
F O
B
A
G G
N
O R
H
R
O L I N
A
S O
G
N
E R
A L
P
U R
P O
O
R A
U I L D
I N
G
J
P
A Q
U I N
A T
R I A
X
Z
A P
A T
A
J O
I N
T
V
E N
T U
R E
R
D
A
V E
N U
E
N
E
H I C
K O
R Y
N
O R
R
O L I N
A
A
6 7 8 9 10
B
C
D
E
F
G
G D
G N
C U I
C U I
SOTF COMPOUND
C-100 CIVIL SITE DEMO PLAN
PROJECT NO. SF-00011-19
G-004 APPENDIX B
F-001 FIRE PROTECTION DESIGN ANALYSIS
TRUE
NORTH
C-503 CIVIL DETAILS
BUILDING LOCATION
F-101 LIFE SAFETY PLAN
C-504
C-505
CIVIL DETAILS
SOD SPECIFICATIONS
C-400 STORM DRAINAGE PROFILES
A-510 WALL DETAILS
A-010 AIR BARRIER PLAN AND ELEVATIONS
FEC
FIRE PROTECTION ENGINEERING
Foster Engineering & Consulting, LLC
B-102 GEOTECHNICAL - SOIL BORINGS LOG
V-101 EXISTING CONDITIONS
A-501 PARTITION TYPES AND MISCELLANEOUS DETAILS
Controlled by: SOTF
Controlled by: USACE SAW
CUI Category: CONTRACT
Distribution Statement D
POC: USACE FOIA (foia-saw@usace.army.mil)
BASIC DESIGN DATA
GOVERNING CODES ARE INTERNATIONAL BUILDING CODE 2018 EDITION, NFPA 101
2018, AND UFC 3-301-01. ALL DESIGNS PERFORMED AND WORK EXECUTED SHALL BE
IN ACCORDANCE WITH THE LATEST ADOPTED VERSIONS OF THE ABA, IBC, UFC,
FORT BRAGG DESIGN GUIDELINES & NFPA.
PROJECT SUMMARY
THE PROJECT CONSISTS OF A DESIGN-BID-BUILD A PRE-ENGINEERED METAL BUILDING (PEMB) GENERAL PURPOSE
STORAGE BUILDING WITHIN THE SECURITY OPERATIONS TRAINING FACILITY (SOTF) SECURE AREA AT FORT BRAGG, NORTH CAROLINA. THE BUILDING SHALL BE 25' BY 150', 3,750 SF AND HAVE 5 OVERHEAD DOOR BAYS, 3 PERSONNEL
DOORS AND STORE PALLETS OF SMALL CALIBER AMMUNITION BOXES DELIVERED BY TRACTOR TRAILER TRUCK, UNLOADED, AND STORED IN THE BUILDING UNTIL DISTRIBUTED TO OTHER BUILDINGS ON THE BASE. THE PEMB SHALL BE
METAL SIDING WITH INSULATED PANEL WALLS UP TO 8' HIGH, MONO SLOPE STANDING SEAM METAL ROOF, OPEN FLOOR
PLAN WITH SEALED CONCRETE FLOOR. THE BUILDING SHALL BE INSULATED AND HAVE EXHAUST FANS IN THE SIDE WALLS
OF THE BUILDING. THERE WILL BE A TELECOM ROOM 8' X 10' WITH ANTI-STATIC FLOORING FOR THE SECURITY SYSTEM.
PROJECT INCLUDES ARCHITECTURAL, CIVIL, STRUCTURAL, MECHANICAL, TELECOM, AND SECURITY DESIGN DISCIPLINES.
SITE WORK TO DETERMINE BUILDING FOOTPRINT, AND ACCESS TO EXISTING UTILITY AND COMMUNICATION RUNS. NEW
SITE WORK FOR THE NEW BUILDING WILL INCLUDE GRADING FOR THE PAD. ADJACENT AREAS SHALL BE GRADED TO
PROVIDE POSITIVE DRAINAGE AWAY FROM THE BUILDING. ALL DISTURBED AREAS, NOT RECEIVING HARDSCAPE, SHALL BE
SODDED AND STABILIZED. AT-FP REQUIREMENTS ARE NOT NEEDED FOR THIS BUILDING SINCE IT IS IN A SECURE AREA.
THE FOOTPRINT OF THE PROPOSED BUILDING AND ASSOCIATED IMPERVIOUS AREA IMPROVEMENTS DO NOT EXCEED THE
5,000-SF THRESHOLD FOR THE APPLICABILITY IN UFC 3-210-10, LOW IMPACT DEVELOPMENT.
THE SITE PLAN IS IN COMPLIANCE WITH DESR 6055.09 AS FOLLOWS:
NOTE 1. SECTION V1.E5.3.6. STORAGE OF, AND OPERATIONS INVOLVING, LIMITED QUANTITIES OF HD 1.2.2, HD 1.3, OR HD
1.4 FOR REASONS OF OPERATIONAL NECESSITY, AS PERMITTED BY PARAGRAPH V3.E3.2.11., FOOTNOTE A OF TABLE
V3.E3.T14., AND FOOTNOTE G OF TABLE V3.E3.T15.
NOTE 2: AN "AE" FACILITY IS AMMUNITION AND EXPLOSIVES. THIS BUILDING IS STORING BULK PALLETS OF HD 1.4 AMMO
ONLY, AND NO EXPLOSIVES, AND IS THEREFORE BY DEFINITION NOT AN AE FACILITY AND NOT A MAGAZINE. REFERENCE
DESR 6055-09, TABLE V3.E3.T15 FOR HD 1.4 AMMO.
TY601 SECURITY DIAGRAMS
C-506 SEEDING SPECIFICATIONS
1. THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR THE FULL PERFORMANCE
AND COMPLETION OF THE REQUIREMENTS OF THE CONTRACT DOCUMENTS.
2. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO EXCLUDE OTHER ITEMS NECESSARY OR
IMPLIED THEREFROM.
3. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF ALL PARTS OF THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR INCOMPLETE CONDITION.
4. ALL WORK SHALL CONFORM TO APPLICABLE INDUSTRY STANDARDS AND MANUFACTURER'S PUBLISHED INSTRUCTIONS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS
WELL AS, ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE BROUGHT TO THE
ARCHITECT/ENGINEER'S ATTENTION PRIOR TO PROCEEDING WITH THE WORK.
5. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE REMOVAL AND LEGAL DISPOSAL OF MATERIALS AND RUBBISH.
6. ONCE ON SITE, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND SHALL VERIFY ALL NEW AND EXISTING CONDITIONS SHOWN ON THESE DRAWINGS. THE CONTRACTOR
SHALL NOTIFY THE ARCHITECT/ENGINEER IN WRITING OF ANY DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK.
7. DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN, LARGE SCALE DETAILS GOVERN OVER SMALL SCALE DETAILS. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER IN
WRITING OF ANY DIFFERING CONDITIONS BEFORE COMMENCEMENT OF WORK.
8. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, ALTERATION, AND DEMOLITION OPERATIONS, SHALL BE APPLIED.
9. DIMENSIONS SHOWN ARE TO FACE OR COLUMN LINES OF PEMB STRUCTURE OR TO OTHER BUILDING ELEMENTS (U.O.N.).
10. THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH ALL APPLICABLE CODES, ORDINANCES AND REGULATORY AGENCIES AND SHALL OBTAIN NECESSARY
BUILDING AND FIRE PERMITS FROM ALL AUTHORITIES HAVING JURISDICTION.
11. ALL INTERIOR FINISH MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF ALL APPLICABLE CODES, ORDINANCES AND REGULATORY AGENCIES.
12. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND MATERIALS. SHEETS ARE TO BE REVIEWED AND NOTES ON INDIVIDUAL SHEETS SHALL BE APPLIED TO
RELATED DRAWINGS AND DETAILS.
13. A FINISH INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH AND HEIGHT OF WALL IS TO BE FINISHED UNLESS NOTED OTHERWISE IN THE DRAWINGS.
14. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED. WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE DETERMINED, CONSULT THE
ARCHITECT/ENGINEER BEFORE PROCEEDING WITH THE WORK.
15. ALL PIPE DUCTS AND BUS DUCTS THAT PENETRATE FLOOR SLABS OR WALL PARTITIONS SHALL BE INSTALLED IN A MANNER THAT WILL PRESERVE THE MOISTURE
RESISTIVENESS, FIRE RATING, AND STRUCTURAL INTEGRITY OF THE BUILDING.
16. THE CONTRACTOR SHALL PLAN THEIR WORK TO PROVIDE ADEQUATE PROTECTION FOR PERSONS AND PROPERTY AT ALL TIMES, AND EXECUTE THE WORK IN SUCH A MANNER
TO AVOID ANY HAZARD TO PERSONS AND PROPERTY AS NECESSARY.
17. THE CONTRACTOR SHALL COORDINATE THE SCHEDULING AND PHASING OF THE WORK TO BE PERFORMED IN OR ABOUT EXISTING FACILITIES WITH THE OWNER PRIOR TO START
OF SUCH WORK. EXISTING SECURITY FENCE REMOVAL MUST BE SCHEDULED WELL IN ADVANCE AND APPROVED BY SOTF PRIOR TO REMOVAL OR CUTTING OF FENCE OR
ELECTRIC SECURITY WIRING.
18. ALL SIGNAGE TO BE APPROVED BY THE OWNER PRIOR TO ORDERING MATERIALS.
19. ALL DESIGNS PERFORMED IN ACCORDANCE WITH 2018 IBC. ALL DESIGNS PERFORMED AND WORK EXECUTED SHALL BE IN ACCORDANCE WITH THE LATEST ADOPTED VERSIONS
OF THE ABA, IBC, UFC, FORT BRAGG DESIGN GUIDELINES & NFPA.
20. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THAT EXISTING UTILITY LOCATIONS PRIOR TO CONSTRUCTION.
21. COORDINATE WITH DPW PERSONNEL REGARDING EXISTING UTILITIES ON-SITE THAT ARE TO REMAIN INTACT. ADDITIONALLY, COORDINATE WITH DPW REGARDING
INTERRUPTIONS OF UTILITY SERVICE AND PROVIDE 14 DAY NOTICE AND APPROVAL FROM DPW AND SOTF PERSONNEL PRIOR TO ANY SCHEDULED SERVICE OUTAGES TO
COMPLETE THE REQUIRED WORK.
22. ELECTRICAL POWER SERVICE TO BE PROVIDED BY SANDHILLS UTILITY SERVICE (SUS).
23. NO WATER AND NO SEWER SERVICE TO BE PROVIDED FOR THIS PROJECT.
24. DEMOLITION SHALL BE PERFORMED IN ACCORDANCE WITH FORT BRAGG, STATE, AND LOCAL REQUIREMENTS. DISPOSE OF HAZARDOUS WASTES IN A MANNER CONSISTENT
WITH APPLICABLE REQUIREMENTS.
25. THE LIMITS OF CONSTRUCTION ARE SHOWN ON THE ARCHITECTURAL SHEETS. THE LIMITS OF CONSTRUCTION AS SHOWN SHALL NOT BE ADJUSTED WITHOUT PRIOR APPROVAL
FROM THE CONTRACTING OFFICER AND FORT BRAGG DPW PERSONNEL.
26. TEMPORARY STOCKPILE LOCATIONS OF EXCAVATED MATERIALS FROM THE INSTALLATION OF UTILITIES SHALL BE COORDINATED WITH THE CONTRACTING OFFICER.
27. CONTRACTOR TO COORDINATE WITH DPW AND SOTF FOR TYPICAL WORK HOURS THAT ARE 0730 - 1600 EACH DAY.
28. PROJECT SHALL COMPLY WITH ALL THE LATEST ADOPTED CODES, REGULATIONS, CATEGORY CODES AND DESIGN CODES (UFC, ABA, IBC, NFPA, FORT BRAGG DESIGN
GUIDELINES, ETC)
GENERAL NOTES STANDARD ABBREVIATIONS
A
A.C.
AIR CONDITIONED
A.D.
AREA DRAIN
A.F.F.
ABOVE FINISH FLOOR
A.H.U.
AIR HANDLING UNIT
ALT.
ALTERNATE
ALUM.
ALUMINUM
AMP.,A
AMPERES
A.O. ACCESS OPENING
APPROX.
APPROXIMATELY
ARCH. ARCHITECTURAL
A.T.C. ACOUSTICAL TILE CEILING
A.B. ANCHOR BOLT
BAL. BALANCE
BD. BOARD
BLDG. BUILDING
BLK. BLOCK
BM. BEAM
BOT. BOTTOM
BRG. BEARING
B.T.U.H. BRITISH THERMO UNIT/HR.
CAB. CABINET
CAP. CAPACITY
C/B CIRCUIT BREAKER
C.D. CEILING DIFFUSER
CEM. CEMENT
CER. CERAMIC
C.F.M. CUBIC FEET/MINUTE
CIRC. CIRCULATING
C.J. CONTROL JOINT
CK'D CHECKERED
CKT. CIRCUIT
C.L. CENTER LINE
CEIL.,CLG. CEILING
CLOS. CLOSET
C.M.U. CONCRETE MASONRY UNIT
C.O. CLEAN OUT
COL. COLUMN
CONC. CONCRETE
COND.
CONN. CONNECTION
CONST. CONSTRUCTION
CONT. CONTINUOUS
CONT'R. CONTRACTOR
CONTR. JT. CONTRACTION JOINT
C.T. CERAMIC TILE
C.T.B. CERAMIC TILE BASE
C. TO C. CENTER TO CENTER
CU. FT.,CF. CUBIC FEET
DET. DETAIL
DIA. DIAMETER
DIFF. DIFFUSER
DIM. DIMENSION
DISC. DISCONNECT
DN. DOWN
DR. DOOR
D.S. DOWNSPOUT
DWG. (S) DRAWING (S)
DSB DOUBLE STRENGTH "B" GLASS
EA. EACH
E.C. EMPTY CONDUIT
E.F. EXHAUST FAN
EL., ELEV. ELEVATION
ELEC. ELECTRIC
EQUIP. EQUIPMENT
E.W. EACH WAY
E.W.C. ELECTRIC WATER COOLER
EXH. EXHAUST
EXP. JT. EXPANSION JOINT
EXT. EXTERIOR
EXIST. EXISTING
F.A. FIRE ALARM
F.C. FLEXIBLE CONNECTION
F.D. FLOOR DRAIN
F.E.C. FIRE EXTINGUISHER CABINET
FIN. FINISH
FL. FLOOR
FT. FOOT - FEET
FTG. FOOTING
FDN.
FOUNDATION
GA. GAGE
GAL. GALLON
GALV. GALVANIZED
G.F.E. GOVERNMENT FURNISHED EQUIPMENT
GL. GLASS
GND. GROUND
GOV'T GOVERNMENT
G.P.H. GALLONS/HOUR
G.P.M. GALLONS/MINUTE
GR.
GRILLE
G.W.B. GYPSUM WALL BOARD
GYP. GYPSUM
H. HIGH
H.B. HOSE BIBB
H.C. HOLLOW CORE
HT. HEIGHT
H.M. HOLLOW METAL
H.P. HORSE POWER
HR.
HOUR
HTG. HEATING
HTR. HEATER
HVAC HEATING, VENTILATION &
HW., HDWE. HARDWARE
HYD. HYDRANT
HORIZ. HORIZONTAL
I.D. INSIDE DIAMETER
I.E. INVERT
IN. INCHES
INCAND. INCANDESCENT
INSUL. INSULATION
INT. INTERIOR
J.B. JUNCTION BOX
JCT. JUNCTION
JT. JOINT
KVA KILOVOLT AMPERE
KW. KILOWATT
LB. POUND
LG. LONG
L.P. LIGHTING PANEL
LTG. LIGHTING
LAV. LAVATORY
M. MOTOR
MAINTENANCEMAINT.
MAX. MAXIMUM
M.D.P. MAIN DISTRIBUTION PANEL
MECH. MECHANICAL
MTL. METAL
MIN. MINIMUM
MISC. MISCELLANEOUS
M.O. MASONRY OPENING
M.T. METAL THRESHOLD
MTD. MOUNTED
MTG.
MOUNTING
M.V. MECHANICAL VENTILATION
N.A. NOT APPLICABLE
N.I.C. NOT IN CONTRACT
NO., # NUMBER
O.A. OUTDOOR AIR
O.C. ON CENTER
O.D. OUTSIDE DIAMETER
O.H. OVERHEAD
OL. OVERLOAD
OPNG. OPENING
OPP. OPPOSITE
O.S.D. OPEN SIGHT DRAIN
P. PAPER
PART'N. PARTITION
PER. PERIMETER
PL. PLATE
PLBG. PLUMBING
PLYD. PLYWOOD
PNL. PANEL
PRESS. PRESSURE
PSF POUNDS / SQUARE FOOT
PSI POUNDS / SQUARE INCH
PSIG POUNDS / SQUARE INCH GAGE
PT. POINT
PTD. PAINTED
P.T.D. PAPER TOWEL DISPENSER
QTR. QUARTER
QUAN. QUANTITY
R. RISER
R.A. RETURN AIR
RAD. RADIUS
RD. ROUND
REC'D. RECESSED
RECIRC. RECIRCULATING
RECP. RECEPTACLE
REG. REGISTER
REINF. REINFORCING
REQ'D. REQUIRED
RET. RETURN
R.G. RETURN GRILLE
RM. ROOM
S. SUPPLY
S.A. SUPPLY AIR
SCH. SCHEDULE
SECT. SECTION
SERV. SERVICE
SHT. SHEET
S.J. SLIP JOINT
SPEC. SPECIFICATIONS
SQ. FT., SF SQUARE FEET
STL. STEEL
STOR. STORAGE
STRUC. STRUCTURAL
SUSP. SUSPENDED
SW. SWITCH
STD. STANDARD
T., TOIL. TOILET
TEL. TELEPHONE
TEMP. TEMPERATURE
THK. THICKNESS
THD. THRESHOLD
TYP. TYPICAL
T.T.D. TOILET TISSUE
T.O.S. TOP OF STEEL
T & G TONGUE & GROOVE
TR. TREAD
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U.O.N.
UNLESS OTHERWISE
V. VOLT
V.C.T. VINYL
VENT. VENTILATION
VERT. VERTICAL
VTR.
VENT THRU ROOF
W
W. WATT
W/ WITH
WD. WOOD
W.G.
WATER GAGE
WP. WEATHERPROOF
WTR. WATER
W.W.F. WELDED WIRE
W.C. WATER CLOSET
W.H. WATER HEATER
U
V
A.C.M.
ASBESTOS CONTAINING MATERIAL
R.P.M.
REVOLUTIONS / MINUTE
R.O. ROUGH OPENING
FR. FRAME
CONDENSATE
FE FIRE EXTINGUISHER
STANDARD SYMBOLS
DETAIL NUMBER
SHEET DETAIL SHOWN ON
DETAIL NUMBER
SHEET DETAIL SHOWN ON
DETAIL NUMBER
SHEET DETAIL SHOWN ON
CONCRETE
SAND
GROUT
EARTH (COMPACTED)
EARTH (UNDISTURBED)
GRAVEL
ASPHALT (NEW)
CMU (SECTION)
BRICK (SECTION)
CMU (PLAN)
STEEL
RIGID INSULATION
BATT INSULATION
BLOCKING
CMU (ELEVATION)
BRICK (ELEVATION)
STANDING SEAM METAL ROOFING
(ELEVATION)
G E
N E
R A
L
N
O T
E S
A
B B
R E
V I A
T I O
M
B O
G-002
M
P
E L
U C
I O
M
P
E L
U C
I O
J
P
A Q
U I
ALUMINUM SIDING (ELEVATION)
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
A N
S I
D
W P
M D
A U
G U
W P
M B
C A
T E
G O
D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L M
I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
C
R E
A D
Y
T
O
A
D V
E R
T I S
E
F O
A
G G
N
O R
R
O L I N
A
S O
N
E R
A L
P
U R
P O
O
R A
I L D
I N
G
J
P
A Q
U I N
A T
R I A
X
Z
A P
A T
A
J O
I N
T
V
E N
T U
R E
R
D
A
V E
N U
E
N
E
H I C
K O
R Y
N
O R
R
O L I N
A
A
6 7 8 9 10
B
C
D
E
F
G
G D
G N
C U I
C U I
ALUMINUM DOOR (ELEVATION)
DISPENSER
NOTED
COMPOSITION TILE
FABRIC
AIR CONDITIONING
1. CONTRACTOR SHALL FOLLOW SECURITY OPERATIONS TRAINING FACILITY (SOTF) SECURITY REQUIREMENTS AT ALL TIMES. REFER TO SPECIFICATION SECTION 01 00 60
FOR ADDITIONAL INFORMATION.
2. ACCESS TO “FOR OFFICIAL USE ONLY” (FOUO) INFORMATION ON SOTF PROJECTS WILL BE LIMITED TO U.S. CITIZENS WHO HAVE A VALID "NEED TO KNOW". IN THE EVENT
THAT ACCESS TO CLASSIFIED INFORMATION IS REQUIRED, AN ADDITIONAL SECURITY PROCEDURES GUIDE WILL BE FURNISHED.
3. TO GAIN ACCESS TO THE SOTF SITE AND/OR PROJECT INFORMATION, A WRITTEN, EMAIL, OR FAX REQUEST MUST BE MADE TO THE SOTF PROJECT MANAGER AT LEAST 5
BUSINESS DAYS IN ADVANCE (SEE SPECIFICATIONS FOR REQUIRED FORM). A SEPARATE REQUEST MUST BE MADE FOR EACH SITE VISIT. REFER TO SPECIFICATIONS FOR
REQUIRED INFORMATION.
4. ONCE ACCESS HAS BEEN GRANTED, NO SOTF INFORMATION OR SITE ACCESS WILL BE GIVEN TO THE INDIVIDUAL UNTIL HE OR SHE HAS SIGNED A SECURITY BRIEFING
FORM. UPON SUCCESSFUL COMPLETION, THE CONTRACTOR WILL BE GIVEN FULL ACCESS TO THE PROJECT SITE AS SHOWN ON THE PLANS, HOWEVER, PERIODS MAY BE
ENCOUNTERED WHEN NO CONTRACTOR OR SUBCONTRACTOR PERSONNEL WILL BE ALLOWED ON THE CONSTRUCTION SITE. WORK STOPPAGES DUE TO THOSE EVENTS
WILL BE HELD TO AN ABSOLUTE MINIMUM, AND THE CONTRACTOR WILL BE GIVEN AS MUCH ADVANCED NOTICE AS POSSIBLE. NOTICE OF THE WORK STOPPAGE AND
RESUMPTION WILL BE RELAYED THROUGH THE SOTF ENGINEERING TO THE COR WHO WILL COMMUNICATE THIS INFORMATION TO CONTRACTOR. THE GOVERNMENT HAS
THE RIGHT TO INSTRUCT THE CONTRACTOR TO EVACUATE THE SITE WITHOUT PRIOR NOTIFICATION AT ANY TIME AND MAY REFUSE ENTRY OF ANY OR ALL CONTRACTOR
PERSONNEL.
5. PERSONNEL ENTERING SOTF WILL BE ESCORTED BY A FACILITY MEMBER OR BY A SECURITY GUARD. USE OF ESCORTS WITHIN THE FACILITY IS DONE ROUTINELY FOR
CONTRACTED AND OTHER VISITING PERSONNEL REGARDLESS OF THEIR SECURITY CLEARANCE LEVEL.
6. THE CONTRACTOR'S PERSONNEL MUST WEAR IDENTIFICATION IN ACCORDANCE WITH SOTF SECURITY POLICIES AT ALL TIMES.
7. CONTRACTOR/VISITOR SHALL NOTIFY (BY EMAIL OR PHONE) THE GOVERNMENT'S CONTRACTING OFFICER'S REPRESENTATIVE (COR), PROJECT MANAGER (PM), OR
DESIGNATED QA PERSONNEL OF THEIR ANTICIPATED ARRIVAL TIME ON SOTF EACH DAY OF CONTRACT PERFORMANCE. IF THE CONTRACTOR DOES NOT ARRIVE AT SOTF
WITHIN 90 MINUTES OF THEIR SCHEDULED ARRIVAL TIME, AND DOES NOT COORDINATE DIRECTLY WITH THE COR, PM, OR QA FOR ANY SUCH LATE ARRIVAL, THE
DESIGNATED ESCORT FOR THE DAY WILL BE RELEASED FOR OTHER DUTIES AND WILL NO LONGER BE AVAILABLE TO THE CONTRACTOR ON THAT DAY. NO SUCH
INSTANCES MAY BE USED BY THE CONTRACTOR AS GOVERNMENT CAUSED DELAY AND THE GOVERNMENT WILL NOT EXTEND THE PERIOD OF PERFORMANCE.
8. ACCESS TO THE PROJECT AREA IS LIMITED TO NORMAL WORK HOURS (0730 TO 1600), MONDAY THROUGH FRIDAY, EXCLUDES FEDERAL HOLIDAYS. CONTRACTOR
PERSONNEL SHALL REPORT TO THE SOTF LAMONT ROAD VISITOR CENTER AT 0730 TO EXCHANGE VALID PICTURE IDENTIFICATION FOR A SOTF VISITOR BADGE. ALL
CONTRACTOR VEHICLES WILL BE SEARCHED EACH DAY STARTING AT 0730. ONCE THE BADGE EXCHANGE AND VEHICLE SEARCH IS COMPLETE, THE CONTRACTOR SHALL
CONVOY WITH THE ESCORT TO THE JOB SITE. THE CONTRACTOR MUST EXIT THE SOTF COMPOUND BY 1600 EACH DAY. EXCEPTIONS MAY BE APPROVED IF SCHEDULED IN
WRITING WITH THE COR A MINIMUM TWO WORK DAYS IN ADVANCE.
9. IT IS A CRIME UNDER 18 USC 795 TO PHOTOGRAPH DEFENSE INSTALLATIONS WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE
MILITARY INSTALLATION. IT IS ALSO A CRIME UNDER 18 USC 797 TO REPRODUCE, PUBLISH SELL OR GIVE AWAY ANY PHOTOGRAPH, PICTURE OR GRAPHIC
REPRESENTATION OF A DEFENSE INSTALLATION WITHOUT FIRST OBTAINING THE PERMISSION OF THE COMMANDING OFFICER OF THE MILITARY INSTALLATION AND SOTF.
10. FT. BRAGG AND SOTF ARE DESIGNATED AS RESTRICTED AREAS. IMAGERY SURVEILLANCE, PHOTOGRAPHY AND VIDEO RECORDING ARE PROHIBITED WITHOUT THE
INSTALLATION COMMANDER'S AND SOTF CONSENT.
11. THE INTRODUCTION OF WEAPONS, AMMUNITION, EXPLOSIVES OR OTHER PROHIBITED ITEMS AND PHOTOGRAPHY OF THE FACILITIES IS PROHIBITED WITHOUT SPECIFIC
AUTHORIZATION FROM THE SOTF COMMANDER AND FT. BRAGG COMMANDER.
SECURITY POLICIES AND PROCEDURES
C
I N
I T
Y
M
U
L
R
O U
T E
S
G-003
M
P
E L
U C
I O
M
P
E L
U C
I O
J
P
A Q
U
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
A N
S I
D
W P
M D
A U
G U
W P
M B
C A
T E
G O
D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L M
I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
C
R E
A D
Y
T
O
A
D V
E R
T I S
E
F O
A
G G
N
O R
R
O L I N
A
S O
N
E R
A L
P
U R
P O
O
R A
I L D
I N
G
J
P
A Q
U I N
A T
R I A
X
Z
A P
A T
A
J O
I N
T
V
E N
T U
R E
R
D
A
V E
N U
E
N
E
H I C
K O
R Y
N
O R
R
O L I N
A
A
6 7 8 9 10
B
C
D
E
F
G
G
D
G N
C U I
C U I
TRUE
NORTH
GENERAL NOTES
NOT TO SCALE
FORT BRAGG BASE MAP AND HAUL ROUTES
ACCESS NOTES
NOT TO SCALE
VICINITY MAP
L
A
M
O
L
O
N
G
S
T
R
E
L
A
M
O
PROJECT SITE - SOTF
COMPOUND
ALL AMERICAN WAY GATE
VISITORS' CENTER AND
VEHICLE REGISTRATION
(POV REGISTRATION 5AM-9PM)
STREETS
RAILROADS
INSTALLATION BOUNDARIES
LEGEND:
MAJOR ROADS
APPROVED ACCESS ROUTES
G
R
U
B
A
E
R
I C
W
Y
B
U
T
N
M
C
K
E
L
L
DIRECTORATE OF PUBLIC WORKS
BUILDING 3-1631
ACCESS CONTROL POINT
- ALL TRUCKS
RANDOLPH GATE
(24 HOURS)
BUTNER GATE (M-F 5AM-9PM,
SAT-SUN 9AM-9PM
L A
M
O N
T
R
D
M
A
N
C
H
E
S
T
A
D
L
O
N
G
S
T
R
E
ROAD CLOSURE
ALCON
BEGINNING AT 5 AM, MONDAY, JAN. 7, SOME OF FORT BRAGG'S ACCESS CONTROL POINTS WILL CHANGE THEIR HOURS OF
OPERATION.
THE FOLLOWING ACPS WILL SEE SIGNIFICANT CHANGES TO THEIR OPERATING HOURS:
* REILLY ROAD ACP - OPEN FROM 5AM TO 9AM TO INBOUND AND OUTBOUND TRAFFIC; OPEN FROM 3PM TO 6PM TO INBOUND
AND OUTBOUND TRAFFIC.
* KNOX STREET ACP - CLOSED TO ALL TRAFFIC.
* KNOX STREET TRUCK PLAZA - OPEN TO COMMERCIAL VEHICLES ONLY FROM 5AM TO 9PM WEEKDAYS AND 5AM TO 1PM ON
WEEKENDS.
* KNOX STREET EAST / MMD - OPEN FROM 5AM TO 9AM TO INBOUND AND OUTBOUND TRAFFIC; OPEN FROM 3PM TO 6PM TO
OUTBOUND TRAFFIC ONLY.
* BUTNER ROAD ACP - OPEN FROM 5AM TO 9AM TO INBOUND AND OUTBOUND TRAFFIC; OPEN FROM 3PM TO 6PM TO
OUTBOUND TRAFFIC ONLY.
* MANCHESTER ROAD ACP - OPEN FROM 5AM TO 9AM TO INBOUND AND OUTBOUND TRAFFIC; OPEN FROM 3PM TO 6PM TO
OUTBOUND TRAFFIC ONLY.
* RANDOLPH ROAD ACP - WILL CHANGE TO 24-HOUR OPERATIONS.
LONGSTREET ROAD, CHICKEN ROAD, YADKIN ROAD, ALL AMERICAN FREEWAY, HONEYCUTT ROAD, RANDOLPH ROAD, AND
SIMMONS ARMY AIRFIELD ACCESS CONTROL POINTS WILL BE OPEN 24 HOURS.
THOMAS D. MCCOLLUM
PUBLIC AFFAIRS OFFICER
USAG FORT BRAGG
PHONE: 910 396-2122 (DSN: 236)
CELL: 910 849-6813 CELL
LEARN MORE AT:
WWW.BRAGG.ARMY.MIL<BLOCKEDHTTP://WWW.BRAGG.ARMY.MIL>
SOLID WASTE AND RECYCLING REQUIREMENTS
THE FORT BRAGG LAMONT CONSTRUCTION AND DEMOLITION (C&D) LANDFILL IS CLOSED AND WILL NOT BE ACCEPTING ANY C&D
WASTE AND ASBESTOS WASTE.
THE MUNICIPAL SOLID WASTE (MSW) TRANSFER STATION AT THE LAMONT LANDFILL FACILITY IS CLOSED AND WILL NOT ACCEPT
MSW AT THE FACILITY.
ALL CONTRACTORS SHALL USE A STATE CERTIFIED C&D LANDFILL OR SUB TITLE "D" LANDFILL OFF FORT BRAGG FOR THE DISPOSAL OF C&D
WASTE, ASBESTOS WASTE AND MSW.
THE CONTRACTOR IS RESPONSIBLE TO MAINTAIN DATA OF ALL WASTE DISPOSED (C&D AND MSW) AND ALL MATERIALS RECYCLED
OFF FORT BRAGG. THE DEPARTMENT OF THE ARMY (DA) AND THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY
(NC DEQ) REQUIRES MONTHLY AND ANNUAL REPORTING OF ALL MATERIALS (WASTE AND RECYCLABLES) MANAGED BY FORT
BRAGG. THE FORT BRAGG ENVIRONMENTAL COMPLIANCE BRANCH, SOLID WASTE/RECYCLING OFFICE IS RESPONSIBLE FOR
COMPILING DATA INTO MONTHLY DIRECTORATE REPORTS TO BE CONSOLIDATED INTO REPORTS FOR THE DA AND THE NC DEQ. A
PROVIDED FORM FROM THE SOLID WASTE/RECYCLING OFFICE OR A CONTRACTOR FORM SHALL BE FILLED OUT WITH THE TYPE
OF WASTE OR RECYCLED MATERIAL, THE WEIGHT OF THE WASTE/MATERIAL (TONS OR POUNDS) AND THE CERTIFIED FACILITY
THE WASTE OR RECYCLABLES WERE DELIVERED. THIS INFORMATION IS REQUIRED TO BE SENT TO THE FORT BRAGG SOLID
WASTE/RECYCLING OFFICE BY THE SECOND FRIDAY OF EACH MONTH. CONTACT YOUR GOVERNMENT REPRESENTATIVE FOR
DETAILS.
THE LAMONT LANDFILL FACILITY RECYCLING AREA WILL ACCEPT RECYCLABLE ITEMS:
1) CONCRETE, BRICK, BLOCK AND ASPHALT
-SHALL BE TESTED AND FREE OF ASBESTOS AND LEAD BASED PAINT TO BE RECYCLED
-SHALL BE NO LARGER THAN 2' BY 2' PIECES OR EQUIVALENT
-SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD
-SHALL HAVE NO REBAR PROTRUDING OUT OF THE CONCRETE
2) TREES, LIMBS AND STUMPS
-SHALL BE CUT TO 6 FEET OR LESS IN LENGTH
-IF THE TREE HAS A LARGE DIAMETER (EXAMPLE 3 FEET DIA.) IT SHALL BE CUT TO LENGTHS OF 3 FEET OR LESS
-SHALL BE MINIMAL AMOUNT OF DIRT IN LOAD OR IN STUMP ROOTS
-WILL ACCEPT GROUND WOOD CHIPS
-NO TRASH IN LOAD
3) PALLETS
-SERVICEABLE AND NON-SERVICEABLE PALLETS
4) SCRAP STEEL
-NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
-NO ITEMS WITH LIQUIDS IN THEM
5) SCRAP ALUMINUM
-NO ITEMS REQUIRING DEMILITARIZED ACCEPTED
-NO ITEMS WITH LIQUIDS IN THEM
6) CARDBOARD TO BE RECYCLED
-A 40 YARD DUMPSTER IS AVAILABLE FOR CARDBOARD
-ALSO CARDBOARD CAN BE TAKEN TO THE FORT BRAGG RECYCLING CENTER AT BLDG 3-1240, BUTNER AND
REILLY ROAD
-SHALL BE CLEAN OF TRASH, PLASTICS, STYROFOAM, WOOD, METAL, ETC.
CONTACT YOUR GOVERNMENT REPRESENTATIVE OR THE SOLID WASTE/RECYCLING PROGRAM AT 977-2502, 396-3372, OR 432-6412
FOR ADDITIONAL GUIDANCE.
STATE LAW AND FORT BRAGG REGULATIONS REQUIRES COVERING OF LOADS OF WASTE OR RECYCLABLES TO PREVENT LITTER.
ALL WASTE OR RECYCLABLE MATERIAL LOADS ARE SUBJECT TO BE INSPECTED OF THEIR CONTENTS WHILE BEING PRESENT ON
FORT BRAGG.
NOTE: ALL RECYCLABLE MATERIALS GENERATED FROM A CONSTRUCTION OR DEMOLITION JOB IS PROPERTY OF THE
GOVERNMENT UNLESS THE CONTRACT SPECIFIES THAT THE CONTRACT CAN OBTAIN THE MATERIALS. ITEMS SUCH AS HVAC
UNITES (FREON REMOVED), AIR HANDLERS, PIPING, METAL BEAMS, MOTORS, VALVES, COPPER WIRE, ETC. THESE TYPES OF ITEMS
SHALL BE TRANSPORTED TO THE DPW RECYCLING CENTER (BUTNER AND REILLY ROAD) OR THE RECYCLING CENTER AT THE
LAMONT LANDFILL FACILITY.
ASHEBORO
BISCOE
ROCKINGHAM
LAURINBURG
DARLINGTON
LUMBERTON
WHITEVILLE
ELIZABETHTOWN
WALLACE
CLINTON
MT. OLIVE
GOLDSBORO
SMITHFIELD
DUNN
SANFORD
FAYETTEVILLE
R
O
L
I
N
A
R
O
L
I
N
A
FORT BRAGG
P E
N D
X
G-004
C
G
U A
R D
I A
M
P
E L
U C
I O
J
P
A Q
U
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
A N
S I
D
W P
M D
A U
G U
W P
M B
C A
T E
G O
D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L M
I N
G T
S
T R
I C
T
D
A R
L I N
G T
E
W I L M
I N
G T
O N
N
C
R E
A D
Y
T
O
A
D V
E R
T I S
E
F O
A
G G
N
O R
R
O L I N
A
S O
N
E R
A L
P
U R
P O
O
R A
I L D
I N
G
J
P
A Q
U I N
A T
R I A
X
Z
A P
A T
A
J O
I N
T
V
E N
T U
R E
R
D
A
V E
N U
E
N
E
H I C
K O
R Y
N
O R
R
O L I N
A
A
6 7 8 9 10
B
C
D
E
F
G
G D
G N
C U I
C U I
SPECIAL APPROVALS
EXIT WIDTH
EXIT REQUIREMENTS
NUMBER AND ARRANGEMENT OF EXITS
FIRE PROTECTION REQUIREMENTS
ALLOWABLE HEIGHT
Mixed Occupancy:
Primary Occupancy:
ALLOWABLE AREA
Gross Building Area (sq. ft.):
Building Height:
Mezzanine:
Fire District:
Standpipes:
Sprinklers:
Construction Type:
BUILDING DATA
Code Edition:
LEAD DESIGN PROFESSIONAL:
High Rise:
Special Approval: (Local Jurisdiction, Department of Insurance, ICC, etc., describe below)
The loss of one means of egress shall not reduce the available capacity to less than 50 percent of the total required (Section 7.3.1.1.2)
Minimum width of exit passageway (Section 7.2.6.4.2)
Minimum stairway width: (occupant count >50): 44-in (Section 7.2.2.2.1.2); min. exit access width: 44-in
(Section 39.2.3.2); min. door width: 32-in (Section 7.2.1.2.3.2)
See Table 7.3.1.2 to determine whether net or gross area is applicable. See definition "Area, Gross" and
"Area, Net" (Section 3.3.21).
2,3,4,5
ACTUAL WIDTH
SHOWN ON
PLANS
REQ'D WIDTH
(7.2.2.2.1.2)
(a / b) x c
LEVELSTAIRLEVELSTAIR
AREA PER
OCCUPANT
(Table 7.3.1.2)
AREA
sq. ft.
LEVELSTAIR
EGRESS WIDTH
PER OCCUPANT
(7.3)
(a) (b) (c) EXIT WIDTH (in)
USE GROUP
OR SPACE
DESCRIPTION
1,3
Single Exits (38.2.4.4)
Corridor Dead Ends (38.2.5.2.1)
MINIMUM NUMBER
OF EXITS
REQ'D
(38.2.4)
FLOOR, ROOM OR
SPACE DESIGNATION
TRAVEL DISTANCE
ALLOWABLE
TRAVEL DISTANCE
(38.2.6)
SHOWN
ON
PLANS
ACTUAL
TRAVEL
DISTANCE
SHOWN
ON PLANS
ACTUAL
DISTANCE
SHOWN ON
PLANS
REQUIRED
DISTANCE
BETWEEN
EXIT
DOORS
ARRANGEMENT MEANS
OF EGRESS (38.2.5)
Interior
South
West
East
North
Exterior
Bearing Walls
Structural Frame, including columns, girders, trusses
DESIGN #
FOR
RATED
JOINTS
DESIGN #
FOR
RATED
ASSEMBLY
DESIGN #
FOR
RATED
PENETRATION
DETAIL #
AND
SHEET #
REQ'D PROVIDED
(W/ *
REDUCTION)
RATINGBUILDING ELEMENT
(per IBC 2012
Tables 601& 602)
FIRE
SEPARATION
DISTANCE
(FEET)
Life Safety Plan Sheet #, if provided
Type
Feet=H+20'=
Type
StoriesStories+1=
Feet
StoriesBuilding Height in Stories
Building Height in Feet
Type of Construction
SHOWN
ON PLANS
CODE
REFERENCE
ALLOWABLE
(TABLE 503)
INCREASE FOR
SPRINKLERS
S
S b.
a.
e.
d.
c.
b.
a.
control towers must comply with 412.1.2.
The maximum area of parking garages must comply with Table 406.3.5. The maximum area of air traffic
Maximum Building Area = total number of stories in the building X E (506.4)
Unlimited area applicable under conditions of Section 507.
Single story building I = 300 percent
Multi-story building I = 200 percent
The sprinkler increase per Section 506.3 is as follows:
Percent of frontage increase I = 100[F/P - 0.25] x W/30 = (%)
W = Minimum width of public way = (W)
Ratio (F/P) = (F/P)
Total Building Perimeter = (P)
Perimeter which fronts a public way or open space having 20 feet minimum width = (F)
Frontage area increases from Section 506.2 are computed thus:
STORY
NO.
DESCRIPTION
AND USE
BLDG. AREA
PER STORY
(ACTUAL)
(A)
TABLE 506
AREA
(B)
AREA FOR
FRONTAGE
INCREASE
(C)
MAXIMUM
BUILDING
AREA
(F)
ALLOWABLE
AREA OR
UNLIMITED
(E)
AREA FOR
SPRINKLER
INCREASE
(D)
< 1.00
< 1
Actual Area of Occupancy B
Allowable Area of Occupancy BAllowable Area of Occupancy A
Actual Area of Occupancy A floor area of each use divided by the allowable floor area for each use shall not exceed 1.
For each story, the area of the occupancy shall be such that the sum of the ratios of the actual
Separated Mixed Occupancy (508.4) construction, so determined, shall apply to the entire building. SEE NFPA 101 6.1.14.1.3 INCIDENTAL
EXCEPTION
limitations for each of the applicable occupancies to the entire building. The most restrictive type of
The required type of construction for the building shall be determined by applying the height and area
Non-Separated Mixed Occupancy (508.3)
Exception:Separation:YesNo
Repair GarageUtility and Miscellaneous OpenParking Garage Enclosed
S-2 Low High-piledStorage S-1 Moderate
R-4R-1 Hotels R-2 Condos R-3Mercantile Residential
41 2 3I-3 Use Condition
I-1Institutional I-4 DaycareI-3 JailsI-2 Hospitals
F-2 Low
H-5 HPMH-2 Deflagrate H-3 Combust H-4 HealthHazardous
Business
A-5
H-1 Detonate
F-1 ModerateFactoryEducation
A-4A-3A-2A-1Assembly
TOTAL
1st Floor
NEWEXISTINGFLOOR
Unlimited perNumber of StoriesFeet
YesNo
No Yes (Primary)
DryWetIIIIIClass: IYesNo
NFPA 13D-02NFPA 13R-02NFPA 13-10YesNo
Types:
YesNoMixed Construction:
I-B II-B III-B V-B
V-AIVIII-AII-AI-A
2018 International Building Code (IBC)
E-MAILPHONE #LICENSE #NAMEFIRM
Structural
Sprinkler-Standpipe
Mechanical
Plumbing
Fire Alarm
Electrical
Civil
Architectural
DESIGNER
Phone #
CountyCity
StatePrivateCity/County
Code Enforcement Jurisdiction:
Owned By:
Owner or Authorized Agent:
Proposed Use:
Address:
Name of Project:
Feet
RENO/ UPFIT
YesNo
See Section 7.3.1.5 for converging exits.
NFPA 14-00
USACE
STORAGE BUILDING
SOTF COMPOUND, LAMONT ROAD, FORT BRAGG, NC
SOTF GENERAL PURPOSE STORAGE BUILDING
ATRIAX GROUP
> 30'
> 30'
N/A
1N/A
N/A
IIBIIB
504.4
504.3
606.2
N/A
403.3.1.3115'-0"
3,750
15'-0"
Marcy Pelucio AIA mpelucio@zapatainc.com f
Jeffrey D Sperling A-2002-021727 828-315-9962
TOTAL
N/A N/A
N/A N/A N/A
N/A
N/A N/A N/A
Federal
. State
PROJECT SUMMARY
Building Description:
New 1 Story PEMB Building with 5 overhead doors and 3 personnel doors
Scope of Work Details:
Code Compliance Issues:
Alternative Means of Compliance Request:
Date of Preliminary Review:
RTAP (Revisions to Approved Plans)
Industrial Equipment with Declaration Document Attached
2021 NFPA 101 Life Safety Code
UFC 1-200-01, 8.16.10, Change #1- 10.01.20 DoD Building Code General Building Requirements
UFC 3-600-01, 9.26.06, Change #6 - 05.06.21 Fire Protection Engineering for Facilities
New Construction:
Shell Building
Upfit (First Time Interior Completion)Addition
Existing Building:
Renovated (date): . Current Use(s) (Ch. 3): .
Architectural Barriers Act - 1968 (ABA) Accessibility Standard for Dept. of Defense
Facilities, 2015
ESFR
.Zip Code:
Constructed (date):
Original Use(s) (Ch. 3): --
Proposed Use(s) (Ch. 3): --
Reconstruction Alteration RenovationRepair
Partial
Flood Hazard Area: No Yes
Secondary Occupancies:
Repair GarageUtility and Miscellaneous OpenParking Garage Enclosed
S-2 Low High-piledStorage S-1 Moderate
R-4R-1 Hotels R-2 Condos R-3Mercantile Residential
41 2 3I-3 Use Condition
I-1Institutional I-4 DaycareI-3 JailsI-2 Hospitals
F-2 Low
H-5 HPMH-2 Deflagrate H-3 Combust H-4 HealthHazardous
Business
A-5
H-1 Detonate
F-1 ModerateFactoryEducation
A-4A-3A-2A-1Assembly
Incidental Uses (NFPA 6.1.14.1.3): .
Special Uses:
407406405404**403402 408 409 410 411 412
419418417416415414 420 421 422 423413
Special Provisions: 509.6509.5509.4509.3509.2 509.7 509.8 509.9
Incidental Use Separation (508.2.5) (NFPA 101:T28.3.2.2.2)
This separation is not exempt as a Non-Separated Use (see exceptions).
N/AN/A
(per IBC 2018, UON)
(per IBC 2018, UON)
(per IBC 2018, UON) e.
c.
b.
a.
Allowable Area A = {9,000 + [9,000 x .5 ] + [9,000 x 0]} = 13,500
I = Percent Sprinkler Increase
I = Percent of Frontage Increase
A = tabular area
Allowable Area (A ) from Section 506.1 is computed thus:
a a t f s
d. Allowable Area A = {A + [A x I ] + [A x I ]} a t t f t s
G-101
LIFE SAFETY SYSTEM REQUIREMENTS
Panic Hardware: No Yes
Smoke Detection Systems: No Yes
Fire Alarm: No Yes
Emergency Lighting: No Yes
YesNoExit Signs:
* Indicate section number permitting reduction
Tenant Separation
(402.7.2)
Smoke Barrier
Separation
Party/Fire Wall
Separation (7.2.4.3.1)
Occupancy
Separation (T508.4)
(IBC 420.2)
Corridor Separation
(28.3.6.1.3)
Shafts - Other (8.6.5)
** Note: Ceiling panels are not a part of floor assembly.
N/A = Not ApplicableN.C. = Non Combustible N.R. = Not Required
Atrium: No Yes
FIRE PROTECTION REQUIREMENTS (cont.)
Incidental Use
Separation
N/A
Roof Construction, including supporting beams and joists **
N/AN/A N/A N/A
N/AN/A N/A N/A
Floor Construction, including supporting beams and joists **
Partial
Fire Pump Room
(NFPA 20
T4.12.1.1.2)
N/A
(per NFPA 101)
(per NFPA 101)
(per NFPA 101)
Per NFPA 101 7.3.3.2, for Stairways wider that 44-inches, use the following equation, where C = Capacity in
Persons:
C = 146.7 + [(W - 44) / 0.218] n
C = 146.7 + [(48 - 44) / 0.218]
C = 165 OCCUPANT CAPACITY
SPACE OR
DESCRIPTION
EXIT
COMPONENT
NOM.
EXIT
WIDTH
CAPACITY
PER
COMPONENT
QUANTITY COMPONENT
MAX
CAPACITY
STAIR
DOOR A
ACTUAL
CAPACITY
STAIR
STAIR
DOOR
This project consists of the construction of a new 1 story PEMB building for storage.
Building to be PEMB construction with new Mechanical exhaust fans, Electrical lighting and Cyber security.
N/A
DESIGN #
FOR
RATED
JOINTS
DESIGN #
FOR
RATED
ASSEMBLY
DESIGN #
FOR
RATED
PENETRATION
DETAIL #
AND
SHEET #
REQ'D PROVIDED
(W/ *
REDUCTION)
RATINGBUILDING
ELEMENT
(per NFPA 101 UON)
FIRE
SEPARATION
DISTANCE
(FEET)
DOOR B
Description of assembly
U-Value of total assembly
R-Value of insulation
Skylights in each assembly
U-Value of skylight
Description of assembly
U-Value of total assembly
R-Value of insulation
U-Value of assembly solar heat gain coefficient (SHGC) projection factor (PF)
Door R-Value
Door R-Value
U-Value of assembly
R-Value of insulation
U-Value of total assembly
Description of assembly
Description of assembly
U-Value of total assembly
R-Value of insulation
Description of assembly
U-Value of total assembly
R-Value of insulation
Floors slab on grade
R-Value of insulation
U-Value of total assembly
Description of assembly slab heated
Roof/ceiling Assembly (each assembly) total square footage of skylights in each assembly
Exterior Walls (each assembly)
Openings (windows or doors with glazing) low e required, if applicable
Walls adjacent to unconditioned space (each assembly) low e required, if applicable
Openings (windows or doors with glazing)
Walls below grade (each assembly)
Floors over unconditioned space (each assembly)
Horizontal/vertical requirement
N/A
N/A
7.6
N/A
N/A
N/A
N.R.
N.R.
N/A
N/A
EGRESS CAPACITY
Interior
South
West
East
North
Exterior
Nonbearing walls and partitions
> 30'
> 30'
N/AN/A N/A N/A
N/AN/A . .
BUILDING
ELEMENT
(per NFPA 101 UON)
Shafts - Exit
(7.1.3.2.1 (2))
N/A
Shafts - Elevator, also Machine Room
(UFC 3-600-01
6-30.1))
CALCULATED
OCCUPANT
LOAD (a / b)
SPECIAL INSPECTIONS
IT-7 Precast Concrete Erection
IT-6 Post Tension Slab
IT-15 Exterior Insulation and Finish Systems
IT-5 Reinforced Concrete
IT-14 Sprayed Fire-Resistant Materials
IT-4 Modular Retaining Walls >5-ft. high (1807.2)
IT-12 Welding
IT-3 Piling and Drilling Piers
IT-2 Excavation and Fill
IT-1 Verification of Soils
IT-11 Structural Masonry
IT-10 Inspection of Structural Steel Fabricators
(per UFC 3-301-01)
SCHEDULE OF SPECIAL INSPECTION SERVICES
No Special Inspections required for this project Special Inspections required
Building Occupancy Category (UFC 3-301-01): II III IV
If Occupancy Category II: 14'Building height in feet: 1No. Stories:
The construction divisions which require special inspections for this project are as follows:
IT-8 Pre-stressed Concrete
IT-9 Inspection of Precast Fabricators
IT-13 High Strength Bolts & Steel Framing Insp.
IT-16 Seismic Resistance
IT-17 Smoke Control and Smoke Exhaust Systems
IT-18 Detention Basin
IT-19 Special Cases (1704.15): .
If building in Occupancy Category II exceeds 45 feet or 3 stories or the building is an underground building per
Section 405.1, then Special Inspections are required.
Common Path of Travel (38.2.5.3.1)
HR
427426425
ENERGY REQUIREMENTS:
ENERGY SUMMARY
Prescriptive
Method of compliance:
Performance
Climate Zone:
The following data shall be considered minimum and any special attribute required to meet the energy code shall also be provided. Each Designer shall furnish the required portions of the project information for the plan data sheet. If performance method, state the annual energy cost for the standard reference design vs. annual energy cost for the proposed design.
This section for new construction, additions, change of use and interior completions.
Prescriptive
3a2a 4
Performance
(Energy Code)
(ASHRAE 90.1- 2010)
(Energy Code)
(ASHRAE 90.1 - 2010)
THERMAL ENVELOPE
No Change to Building Envelope
(per NFPA 101)
*SEE TABLE ON SHEET G-101 LIFE SAFETY PLAN FOR OCCUPANT LOAD CALCULATIONS.
Nonbearing walls and partitions
UFC 3-101-01, 09.25.19 Architecture, Change 5
PLUMBING FIXTURE REQUIREMENTS
SHWRS/
TUBS
DRINKING FOUNTAINLAVATORIESURINALSWATER CLOSETS
MALE FEMALE REG. ACCESS.
SPACE
New1st Floor
Total Provided
Total Required
MALE FEMALE
2018 International Fire Code (IFC)
UFC 3-120-10, 12.12.17, Change #3 - Interior Design
UFC 4-010-01, 2.9.12, Change #1 - 08.19.20 Minimum Antiterrorism Standards for Buildings
NFPA 90A - 2021 Standard for the Installation of Air-Conditioning and Ventilating Systems
NFPA 70 - 2020 National Electrical Code
ANSI/ AISC 341 - 2010 Seismic Provisions
ZAPATA
3,750 14,000
ZAPATA
STAIR
DOOR
029418
035049
Leevon McKinney
Richard Tavares
3,750 14,000 N/AN/A .H-31ST
ZAPATA 027888Heather McArthur
ZAPATA 042778Cherylyn Henry
704.378.4949
3,750
704.358.8240
28307
NOTE: NO CHANGE TO OCCUPANCY / USE
UNISEX UNISEX
9090 1 3
36"
UFC 3-410-02 03.02.20 Direct Digital Control for HVAC and Other Building Control System, with
Change 1
UFC 3-470-01 Utility Monitoring and Control System (UMCS) Front End and Integration
704.378.4909
Foster Engineering Ralph Foster 803.787.475734557
1ST - STORAGE 2 3
STORAGE
1ST
3,750 500 7 .4 2.8 108"
75' 58'-0" 75'-6" 126'-2" chenry@zapatainc.com rtavares@zapatainc.com hmcarthur@zapatainc.com jeffrey.sperling@atriaxgroup.com
Ralph@FosterEngr.com
0 - - 0 0 - - 0 0
0 0
0 0
0 0
N/A
0 0
704.358.8240 lmckinney@zapatainc.com
New Building
14,000
14,000
> 30'
> 30'
> 30'
> 30'
N/A
N/A
N/A
N/A
N/A
N/A
N/A0
0 0 0 0 0 0
0 0 0 0 0 0
Life Safety / Code
UFC 1-200-02 High Performance and Sustainable Building Requirements, 12.01.2020
STORAGE
1ST
9090 1 2
36"
9090 1 2
36"
STORAGE
1ST
STORAGE
1ST
DESR 6055.09 Defense Explosives Safety Regulation 6055.09, Edition 1- 1.13.19
FIRE PROTECTION DESIGN ANALYSIS
a. DESIGN STANDARDS
· UFC 1-200-01, 8 OCTOBER 2019, DOD BUILDING CODE
· UFC 3-600-01 CHANGE 6, 6 MAY 2021, FIRE PROTECTION ENGINEERING FOR FACILITIES
· DEFENSE EXPLOSIVES SAFETY REGULATION (DESR) 6055.09
· INTERNATIONAL BUILDING CODE (IBC) (2018)
· NFPA (NATIONAL FIRE PROTECTION ASSOCIATION) 1, FIRE PREVENTION CODE (2021)
· NFPA 101, LIFE SAFETY CODE (2021)
b. BUILDING HEIGHT AND AREA
IBC TABLES 504.3, 504.4, 506.2
c. OCCUPANCY CLASSIFICATION
THE PRIMARY USE OF THIS BUILDING WILL BE STORAGE OF SMALL ARMS AMMUNITION. THE AMOUNT OF HD1.4 EXPLOSIVES IS EXPECTED TO EXCEED THE MAXIMUM ALLOWABLE QUANTITY PER CONTROL AREA OF 50 LBS, THEREFORE THIS IS CLASSIFIED AS A HIGH HAZARD
OCCUPANCY.
· THE IBC OCCUPANCY CLASSIFICATION FOR THIS BUILDING IS “H-3” HIGH HAZARD STORAGE. THE TELECOM ROOM IS AN ACCESSORY "S-1" STORAGE OCCUPANCY WHICH WILL BE EVALUATED AS PART OF THE PRIMARY OCCUPANCY.
· THE NFPA 101 OCCUPANCY CLASSIFICATION FOR THIS BUILDING IS HIGH HAZARD STORAGE. THE TELECOM ROOM IS INCIDENTAL TO THE WAREHOUSE AREA AND WILL BE EVALUATED AS PART OF THE PRIMARY OCCUPANCY (NFPA 101 6.1.14.1.3).
d. FIRE RESISTIVE RATED CONSTRUCTION
BUILDING ELEMENTS (IBC TABLE 601) FOR TYPE II-B CONSTRUCTION
e. PROTECTION OF OPENINGS
WALLS THAT ARE NOT REQUIRED TO BE RATED CAN HAVE UNLIMITED UNPROTECTED OPENINGS (IBC 705.8.1'S EXCEPTION 2).
f. SEPARATION FROM HAZARDS
SINCE THE ENTIRE BUILDING IS A HAZARDOUS OCCUPANCY, SEPARATION OF HAZARDS IS NOT REQUIRED.
g. INTERIOR FINISHES
INTERIOR FINISHES (NFPA 101 42.3.3, 10.2.2)
INSULATION
· INSULATION MUST HAVE A FLAME SPREAD INDEX MAXIMUM OF 75 AND SMOKE-DEVELOPED INDEX RATING MAXIMUM OF 150 (UFC
3-600-01 PARA 8-3.1.1).
· EXPOSED INSULATION IN CONCEALED SPACES MUST HAVE A FLAME SPREAD INDEX MAXIMUM OF 25 AND SMOKE-DEVELOPED INDEX
RATING MAXIMUM OF 50 (UFC 3-600-01 PARA 8-3.1.2).
· EXCEPTIONS TO THESE RULES PER UFC 3-600-01 PARA 8-3.2 ARE PERMITTED.
h. MEANS OF EGRESS
OCCUPANT LOAD
MEANS OF EGRESS COMPONENTS
DOORS
MINIMUM CLEAR WIDTH IS 32” (NFPA 101 7.2.1.2.3.2). MINIMUM HEIGHT IS 80” (NFPA 101 7.1.5.1).
DOOR OPENING FORCE MUST COMPLY WITH NFPA 101 7.2.1.4.5.
DOORS SERVING HIGH HAZARD OCCUPANCIES MUST SWING IN THE DIRECTION OF EGRESS (NFPA 101 7.2.1.4.2(3)).
DOORS WITH A LATCH OR LOCK REQUIRE PANIC HARDWARE (NFPA 101 7.11.7).
DISCHARGE FROM EXITS
EXITS MUST TERMINATE DIRECTLY TO THE PUBLIC WAY OR AT AN EXTERIOR EXIT DISCHARGE (NFPA 101 7.7.1). YARDS, COURTS, OPEN SPACES, OR OTHER PORTIONS OF EXIT DISCHARGE MUST BE OF THE REQUIRED WIDTH AND SIZE TO PROVIDE ALL OCCUPANTS WITH A
SAFE ACCESS TO A PUBLIC WAY (NFPA 101 7.7.1.1).
CAPACITY OF MEANS OF EGRESS (NFPA 101 7.3.3.1, 7.11.3)
THE EGRESS CAPACITY EXCEEDS THE BUILDING'S OCCUPANT LOAD.
NUMBER OF EXITS FROM A ROOM OR SPACE
THE BUILDING HAS 2 EXITS.
ARRANGEMENT OF MEANS OF EGRESS
REMOTENESS
THE MINIMUM SEPARATION DISTANCE BETWEEN AT LEAST TWO EXITS OR EXIT DOORS SHALL NOT BE LESS THAN ONE-HALF OF THE MAXIMUM OVERALL DIAGONAL OF THE BUILDING OR AREA BEING SERVED (NFPA 101 7.5.1.3.1).
AT LEAST TWO OF THE EXITS MEET THE REQUIRED SEPARATION DISTANCE.
COMMON PATH OF TRAVEL
DEAD-END CORRIDORS
MAXIMUM TRAVEL DISTANCE
MARKING MEANS OF EGRESS
MEANS OF EGRESS SHALL HAVE SIGNS COMPLYING WITH NFPA 101 7.10. INTERNALLY ILLUMINATED SIGNS MUST BE PHOTOLUMINESCENT AND MEET THE REQUIREMENTS OF NPFA 101 7.10.7. RADIOLUMINOUS, INCANDESCENT, OR FLUORESCENT TYPE SIGNS ARE NOT
PERMITTED (UFC 3-600-01 PARA 10-2.1.1, 10-2.2).
ILLUMINATION OF MEANS OF EGRESS
MINIMUM ILLUMINATION OF 1.0 FOOT-CANDLE, MEASURED AT THE WALKING SURFACE, UNDER NORMAL POWER (NFPA 101 7.8.1.3 (2)).
ILLUMINATION SHALL BE ARRANGED SO THAT FAILURE OF ONE UNIT WILL NOT RESULT IN ILLUMINATION LEVEL BELOW 0.2 FT-CANDLE IN
ANY DESIGNATED AREA (NFPA 101 7.8.1.4).
EMERGENCY LIGHTING IS REQUIRED (NFPA 101 7.9.1.1(1), 42.2.9).
i. WATER SUPPLIES AND HYDRANTS
HYDRANT PROTECTION IS NOT REQUIRED FOR AMMUNITION STORAGE FACILITIES (UFC 3-600-01 PARA 4-5.7.2.3).
j. FIRE DEPARTMENT CONNECTION
THE BUILDING DOES NOT HAVE A SPRINKLER SYSTEM.
k. POST INDICATOR AND ISOLATION VALVES
THERE ARE NO ISOLATION VALVES RELEVANT TO THIS PROJECT.
l. AUTOMATIC SPRINKLER SYSTEM
SPRINKLER PROTECTION IS NOT REQUIRED FOR AMMUNITION STORAGE FACILITIES (UFC 3-600-01 PARA 4-5.7.2.3).
m. STANDPIPE SYSTEMS
THE FACILITY DOES NOT REQUIRE A STANDPIPE SYSTEM (UFC 3-600-01 PARA 9-10.2).
n. PORTABLE FIRE EXTINGUISHERS
GENERAL PURPOSE PORTABLE FIRE EXTINGUISHERS ARE NOT REQUIRED (UFC 3-600-01 PARA 9-17.1, NFPA 101 42.3.5).
o. FIRE DETECTION
A FIRE DETECTION SYSTEM IS NOT REQUIRED IN AMMUNITION STORAGE FACILITIES (NFPA 101 42.3.4.2(1), UFC 3-600-01 PARA 4-5.7.2.4).
p. FIRE ALARM SYSTEM
A FIRE ALARM SYSTEM IS NOT REQUIRED IN AMMUNITION STORAGE FACILITIES (NFPA 101 42.3.4.2(1), UFC 3-600-01 PARA 4-5.7.2.4).
A MASS NOTIFICATION SYSTEM IS NOT REQUIRED BECAUSE THIS DOES NOT QUALIFY AS AN INHABITED BUILDING (UFC 4-010-01, 3-1, 3-22)
q. SMOKE MANAGEMENT OR CONTROL
SMOKE CONTROL IS NOT REQUIRED IN THIS FACILITY.
r. CONNECTION TO BASE FIRE ALARM REPORTING SYSTEM
THE FACILITY WILL NOT HAVE FIRE ALARM AND MASS NOTIFICATION.
s. COORDINATION WITH SECURITY AND ANTITERRORISM
THE BUILDING IS NOT REQUIRED TO COMPLY WITH ANTI TERRORISM STANDARDS (UFC 4-010-01, 3-1).
t. FIRE DEPARTMENT ACCESS
THE FOLLOWING ARE REQUIREMENTS FOR FIRE DEPARTMENT ACCESS
· A KNOX BOX IS NOT PERMITTED FOR THIS BUILDING.
· 20 FT OF UNOBSTRUCTED WIDTH (NFPA 1 18.2.3.5.1.1).
· 13 FT 6 IN OF VERTICAL CLEARANCE (NFPA 1 18.2.3.5.1.2).
· THE MINIMUM UNOBSTRUCTED WIDTH AND HEIGHT MAY BE INCREASED BY THE AHJ TO ACCOMMODATE THE RESPONDING FIRE
APPARATUS (NFPA 1 18.2.3.5.1.1.2, 18.2.3.5.1.2.2).
· MINIMUM TURNING RADIUS FOR FIRE APPARATUS IS 42 FT, UNLESS THE FIRE DEPARTMENT HAS A DIFFERENT REQUIREMENT (NFPA 1
18.2.3.5.3).
· IF THE FIRE DEPARTMENT ACCESS WAY IS A DEAD END IN EXCESS OF 150 FT, SPACE FOR A TURNAROUND ARRANGEMENT MUST BE
ALLOCATED (NFPA 1 18.2.3.5.4).
u. EQUIVALENCIES
NO EQUIVALENCIES ARE PROPOSED
v. FOREIGN CODE CONFLICTS
NOT APPLICABLE
w. INTEGRATED SYSTEM TESTING
NO SPECIAL CONSIDERATIONS.
OCCUPANCY H-3
CONSTRUCTION TYPE II-B
AUTOMATIC SPRINKLER SYSTEM NONE
ALLOWED ACTUAL
HEIGHT 55 FT 15 FT
STORIES 2 1
AREA 14,000 FT2 3,787 FT2
BUILDING ELEMENT FIRE RESISTANCE RATING (HR)
PRIMARY STRUCTURAL FRAME 0
EXTERIOR BEARING WALLS (SEPARATION DISTANCE > 10 FT) 0
INTERIOR BEARING WALLS 0
INTERIOR NON-BEARING WALLS 0
EXTERIOR NON-BEARING WALLS (SEPARATION DISTANCE > 10 FT) 0
FLOOR CONSTRUCTION 0
ROOF CONSTRUCTION 0
OCCUPANCY EXITS EXIT ACCESS
CORRIDORS OTHER SPACES
STORAGE WALLS & CEILING
FLOOR
A, B
I OR II
A, B, C N/A
A, B, C N/A
OCCUPANCY AND USE
OCCUPANT LOAD FACTOR
(NFPA 101 TABLE 7.3.1.2) OCCUPANCY AREA (FT2) OCCUPANT LOAD
STORAGE & UTILITY 500 GROSS 3,521 7
TOTAL OCCUPANT LOAD 7
EXIT COMPONENT
COMPONENT FACTOR
(IN. / PERSON)
COMPONENT
WIDTH (IN.)
EXIT EGRESS
CAPACITY
ANTICIPATED
OCCUPANT LOAD
A DOOR 0.4 32 80 2
B DOOR 0.4 32 80 2
C DOOR 0.4 32 80 3
TOTAL EGRESS CAPACITY 160 7
SPACE MINIMUM REQUIRED REFERENCE
ENTIRE BUILDING 2 NFPA 101 42.2.4.1(3), 7.4.1.1
ROOMS UP TO 200 FT2 1 NFPA 101 7.11.4
SPACE MAXIMUM DIAGONAL MINIMUM SEPARATION
REQUIRED
ACTUAL SEPARATION
OF EXITS
ENTIRE BUILDING 151 Ft 76 Ft 126 Ft
OCCUPANCY LIMIT ACTUAL REFERENCE
STORAGE 25 FT 11 FT NFPA 101 7.5.1.1.4, 7.11.4(3), 42.2.5
OCCUPANCY LIMIT ACTUAL REFERENCE
STORAGE NOT PERMITTED NONE NFPA 101 7.5.3.4, 7.11.5, 42.2.5
OCCUPANCY LIMIT ACTUAL REFERENCE
STORAGE 75 FT 58 FT NFPA 101 7.6.7, 42.2.6
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
B Y:
M
AR
K
SHEET ID
US ARMY CORPS
OF ENGINEERS
IS
SU
E D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
D
ES
C R
IP
TI
O N
D
AT
E
C O
N
TR
AC
T
N O
AN
SI
D
W
2P M
D
AU
G
U
ST
W
2P M
B0
C
AT
EG
O
R Y
C O
D E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
C
R
EA
D Y
TO
A
D
VE
R
TI
SE
FO
R
T
BR
AG
G
, N O
R
TH
C
AR
O
LI
N A
SO
TF
G
EN
ER
AL
P U
R
PO
SE
S
TO
R
AG
E
BU
IL
D
IN
G
PN
S F-
1-
J.
P
AQ
U
IN
AT
R
IA
X
- Z
AP
AT
A
JO
IN
T
VE
N
TU
R
E
3R
D A
VE
N
U E
N E
H
IC
KO
R
Y, N
O R
TH
C
AR
O
LI
N
A
2 3 4 5
A
6 7 8 9 10
B
C
D
E
F
G
F-
1.
D
G N
C U I
C U I
FI
R
E
PR
O
TE
C
TI
O N
D
ES
IG
N
A N
AL
YS
IS
F-001
E.
M
O N
D O
R
J.
S
M
EC
K
E.
M
O N
D O
02-AUG-21
EXIT C
0.4
EXIT A
0.4
EGRESS TRAVEL DISTANCE: 58 FT S
COMMON PATH OF TRAVEL: 11 FT
150'-6"
126'-2"
EGRESS TRAVEL DISTANCE: 54 FT
EXIT B
0.4
A
OCCUPANCY
OCCUPANCY AREA
OCCUPANT LOAD FACTOR
MAXIMUM OCCUPANCY
EGRESS TRAVEL DISTANCE
COMMON PATH OF TRAVEL
WIDTH OF MOST LIMITING
EXIT COMPONENT
COMPONENT FACTOR
MAXIMUM EGRESS
CAPACITY
NUMBER OF OCCUPANTS
EXPECTED TO USE THIS EXIT
0.2
SO
LI
C
IT
AT
IO
N N
O
FI
LE
N
AM
E:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
B Y:
M
AR
K
SHEET ID
US ARMY CORPS
OF ENGINEERS
IS
SU
E D
AT
E:
SI
ZE
SU
BM
IT
TE
D B
Y:
D
ES
C R
IP
TI
O N
D
AT
E
C O
N
TR
AC
T
N O
AN
SI
D
W
2P M
D
AU
G
U
ST
W
2P M
B0
C
AT
EG
O
R Y
C O
D E:
U .S
. A R
M Y
C O
R
PS
O F
EN
G
IN
EE
R S
W
IL
M
IN
G
TO
N D
IS
TR
IC
T
D
AR
LI
N G
TO
N
A
VE
W
IL
M
IN
G
TO
N , N
C
R
EA
D Y
TO
A
D
VE
R
TI
SE
FO
R
T
BR
AG
G
, N O
R
TH
C
AR
O
LI
N A
SO
TF
G
EN
ER
AL
P U
R
PO
SE
S
TO
R
AG
E
BU
IL
D
IN
G
PN
S F-
1-
J.
P
AQ
U
IN
AT
R
IA
X
- Z
AP
AT
A
JO
IN
T
VE
N
TU
R
E
3R
D A
VE
N
U E
N E
H
IC
KO
R
Y, N
O R
TH
C
AR
O
LI
N
A
2 3 4 5
A
6 7 8 9 10
B
C
D
E
F
G
F-
1.
D
G N
C U I
C U I
1/8"=1'-0"1 LIFE SAFETY PLAN
LI
FE
S
AF
ET
Y
PL
AN
F-101
E.
M
O N
D O
R
J.
S
M
EC
K
E.
M
O N
D O
R
SYMBOL LEGEND
OCCUPANCY LABEL
EXIT LABEL
GRAPHIC SCALE
SCALE: 1/8" = 1'-0"
8'4'0 16'
02-AUG-21
L I C
I T
A T
I O
N
N
O
F I
M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
A N
S I
D
W P
M D
A U
G U
W P
M B
C A
T E
G O
D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
W I L
M I N
G T
O N
N
C
R E
A D
Y
T
O
A
D V
E R
T I S
E
F O
A
G G
N
O R
R
O L
I N
A
S O
N
E R
A L
P
U R
P O
O
R A
I L
D I N
G
J
P
A Q
U I N
A T
R I A
X
Z
A P
A T
A
J O
I N
T
V
E N
T U
R E
R
D
A
V E
N U
E
N
E
H I C
K O
R Y
N
O R
R
O L
I N
A
A
6 7 8 9 10
B
C
D
E
F
G
B D
G N
C U I
C U I
TRUE
NORTH
S O
R
I N
G
P
L A
N
B-101
A
A
L S
H U
J A
R I
A
A
L S
H U
J A
R I
H
M
C A
R T
H U
R
NOT TO SCALE
SOIL BORING PLAN
BORING SYMBOL LEGEND
THE INFORMATION IN THIS SHEET IS TAKEN
DIRECTLY FROM THE BORING RESULTS
AND DRAWINGS GENERATED BY
GEOSYNTEC DATED MAY 27, 2021.
B-1 BORING 1 - SEE BORING LOG B-1 ON B-102
BORING 2 - SEE BORING LOG B-2 ON B-102B-2
L I C
I T
A T
I O
N
N
O
F I L
E
N
A M
E
D R
A W
N
B
Y
C H
E C
K E
D
B
Y
D E
S I G
N
B
Y
M A
R K
SHEET ID
US ARMY CORPS
OF ENGINEERS
I S
S U
E
D
A T
E
S I Z
E
S U
B M
I T
T E
D
B
Y
D E
S C
R I P
T I O
N D
A T
E
C O
N T
R A
A N
S I
D
W
P M
D
A U
G U
W
P M
B
C A
T E
G O
D
E
U S
A
R M
Y
C
O R
E
N G
I N
E E
R S
W I L
M I N
G T
S
T R
I C
T
R
L I N
G T
E
W I L
M I N
G T
O N
N
C
R E
A D
Y
T
O
A
D V
E R
T I S
E
F O
A
G G
N
O R
R
O L
I N
A
S O
N
E R
R
P O
O
R A
I L
D I N
G
J
P
A Q
U I N
A T
R I A
X
Z
A P
A T
A
J O
I N
T
V
E N
T U
R E
E
N U
E
N
E
H I C
K O
R Y
N
O R
R
O L
I N
A
A
6 7 8 9 10
B
C
D
E
F
G
B
D
G N
C U I
C U I
S O
I L
B
O R
I N
G
L O
G S
B-102
A
A
L S
H U
J A
R I
A
A
L S
H U
J A
R I
H
M
C A
R T
H U
R
NOT TO SCALE
BORING LOG - B-1
NOT TO SCALE
BORING LOG - B-2
GENERAL NOTES STANDARD SYMBOLS
CONCRETE PAVEMENT
ASPHALT PAVEMENT
GRAVEL
EARTH
SAND
GRASS
MAJOR CONTOURS
MINOR CONTOURS
SPOT ELEVATION
BENCHMARK
WATERLINE
SANITARY SEWER LINE
OVERHEAD ELECTRIC LINE
UNDERGROUND ELECTRIC LINE
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
FIRE LINE
NATURAL GAS LINE
STEAM LINE
SILT FENCE
STORM DRAIN LINE
VALVE
SANITARY SEWER MANHOLE
CLEANOUT
STORM DRAIN INLET/ MANHOLE
DROP INLET/YARD DRAIN
POWER/LIGHT POLE
FIRE HYDRANT
TREE/BUSH (INDIVIDUAL)
TREELINE
POST INDICATOR VALVE
BACKFLOW PREVENTER
WATER METER
DOOR ENTRY
BLDG FOOTPRINT
EDGE OF PAVEMENT
PROPOSED PARKING
DEMOLITION
LIMITS OF DISTURBANCE
LIMITS OF CONSTRUCTION
W
SS
OE
UE
F
G
CO
MH
SS
OC
UC
SL
PP
BM1
ELEV: XXX
100.00
100.00
PIV
BFP
M
SF
C I V
T
G
E
C-001
A
L S
H U
J A
I R
I
A
A
L S
H U
J A
I R
I
H M
C A
R T
H U
R
GENERAL NOTES
1. CONTRACTOR SHALL BE RESPONSIBLE FOR SITE SECURITY AND JOB SAFETY.
CONSTRUCTION ACTIVITIES SHALL BE IN ACCORDANCE WITH OSHA
STANDARDS, LOCAL REQUIREMENTS AND GOVERNMENT REQUIREMENTS.
2. WITHIN THE LIMITS OF THE BUILDING FOOTPRINT, CONTRACTOR SHALL
PERFORM EARTHWORK OPERATIONS REQUIRED UP TO SUBGRADE
ELEVATIONS.
3. WORK WITHIN THE RIGHTS-OF-WAY SHALL CONFORM TO GOVERNMENT
STANDARDS.
4. AREAS OUTSIDE THE LIMITS OF PROPOSED WORK DISTURBED BY ANY
CONSTRUCTION OPERATIONS SHALL BE RESTORED BY CONTRACTOR TO
THEIR ORIGINAL CONDITION.
5. IN THE EVENT THAT SUSPECTED CONTAMINATED SOILS ARE ENCOUNTERED
DURING EXCAVATION AND CONSTRUCTION ACTIVITIES BASED ON VISUAL,
OLFACTORY, OR OTHER EVIDENCE, WORK SHALL BE STOPPED IN THE
VICINITY OF THE SUSPECT MATERIAL TO AVOID FURTHER SPREADING OF THE
MATERIAL, AND SHALL NOTIFY THE OWNER IMMEDIATELY SO THAT THE
APPROPRIATE TESTING AND SUBSEQUENT ACTION CAN BE TAKEN.
6. CONTRACTOR SHALL PREVENT DUST, SEDIMENT, AND DEBRIS FROM EXITING
THE SITE AND SHALL BE RESPONSIBLE FOR CLEANUP, REPAIRS AND
CORRECTIVE ACTION IF SUCH OCCURS. CONTRACTOR SHALL DISPOSE OF
DEBRIS IN ACCORDANCE WITH APPLICABLE FEDERAL, STATE, AND LOCAL
REGULATIONS, ORDINANCES, AND STATUTES.
7. DAMAGE RESULTING FROM CONSTRUCTION LOADS SHALL BE REPAIRED BY
CONTRACTOR.
8. CONTRACTOR SHALL CONTROL STORMWATER RUNOFF DURING
CONSTRUCTION TO PREVENT ADVERSE IMPACTS TO OFF SITE AREAS, AND
SHALL BE RESPONSIBLE TO REPAIR RESULTING DAMAGES, IF ANY.
9. ALL ON SITE VEHICLE TRANSPORTATION ROUTES SHALL BE TEMPORARILY
STABILIZED WITH STONE IMMEDIATELY AFTER GRADING TO PROVIDE READY
ACCESS FOR EMERGENCY VEHICLES TO TRAVEL THROUGH AND AROUND
THE CONSTRUCTION SITE DURING BOTH DRY AND WET WEATHER.
10.…