Sewer Replacement Pkg 1 _ Technical Specifica.pdf

PDF 3 MB Posted

Attached to
2025- 1885 Sewer Main Replacement
Solicitation number
PE-66090-NONST-2025-000000012
Issued by
Fulton County, Georgia

About this file

This document is a technical specification for the 2024 Sewer Main Replacement Package, prepared for the East Point Department of Water and Sewer in East Point, Georgia. The project involves comprehensive sewer infrastructure work, including sewer main replacement, lateral reconnection, manhole rehabilitation, and related civil engineering tasks. The technical specifications cover multiple divisions including general requirements, earthwork, exterior improvements, utilities, and transportation, with a specific focus on traffic control during construction. The project will require detailed traffic management, including the use of appropriate signage, barricades, safety equipment, and potentially off-duty police officers to manage traffic flow and ensure public safety during construction activities.

The technical specifications outline strict requirements for materials, worker safety, and traffic control devices, mandating compliance with Georgia Department of Transportation standards and the Manual on Uniform Traffic Control Devices (MUTCD). Contractors must submit detailed plans for traffic control, including the type, number, and location of control measures. Workers are required to wear high-visibility safety apparel, and all traffic control devices must meet specific standards. The project includes provisions for maintaining public access, minimizing disruption to businesses and residents, and ensuring safe navigation through construction zones, with requirements such as providing 24-hour notice before interfering with private drives and not blocking more than half a street during open-cut crossings.

View the file

Other files

File Type Posted
ITB Base Document.pdf PDF
ITB General Instructions.pdf PDF
Exhibit C Specifications.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DOCUMENTS

for

2024 Sewer Main

Replacement Package

VOLUME I OF II

Technical Specifications

BID DOCUMENTS

December 2024

EAST POINT

DEPARTMENT OF WATER AND SEWER

EAST POINT, GEORGIA

Prepared by:

990 Hammond Drive, Suite 400

Atlanta, Georgia 30328

THIS PAGE LEFT INTENTIONALLY BLANK

2024 Sewer Main Replacement Package

BC Project No. 159297

Technical Specifications Index i

CITY OF EAST POINT – 2024 SEWER MAIN REPLACEMENT PACKAGE

TECHNICAL SPECIFICATIONS INDEX

DIVISION 01—GENERAL REQUIREMENTS

01 01 00 Project Location and Site Access

01 11 00 Summary of Work

01 11 05 Measurement and Payment

01 29 73 Schedule of Values

01 31 19 Project Meetings

01 32 16 Construction Progress Schedule

01 32 33 Photographic Documentation

01 33 00 Submittal Procedures

01 35 29 Health, Safety and Emergency Response Procedures

01 45 23 Testing and Inspection Services

01 52 50 Contractor’s Facilities, Utilities, and Staging Areas

01 66 00 Product Storage and Protection

01 71 33 Protection and Maintenance

01 74 23 Cleaning and Waste Management

01 77 00 Closeout Procedures

01 78 36 Warranties

01 78 39 Project Record Documents

01 99 90 Reference Forms

DIVISION 31—EARTHWORK

31 23 00 Excavation and Fill

31 23 19 Dewatering

31 25 00 Erosion and Sedimentation Control

31 41 00 Sheeting, Shoring and Bracing

DIVISION 32—EXTERIOR IMPROVEMENTS

32 92 00 Grassing

32 12 16 Asphalt Paving

DIVISION 33—UTILITIES

33 01 30.11 Sanitary Sewer CCTV

33 01 30.50 Wastewater Flow Control

33 01 30.53 Sanitary Sewer Cleaning

33 01 30.73 Sanitary Sewer Manhole Rehab

33 01 30.74 Lateral Lining

33 01 30.75 Lining with Cured-In-Place-Pipe (CIPP)

33 05 13.16 Precast Manholes, Frames and Covers

33 05 31 Ductile Iron Pipe

33 31 16 Sewer Lateral Reconnection and Replacement

DIVISION 34 —TRANSPORATION

34 41 16.10 Traffic Control

2024 Sewer Main Replacement Package Traffic Control

BC Project No. 159297 34 41 16.10 - 1

SECTION 34 41 16.10

TRAFFIC CONTROL

PART 1 GENERAL

1.01 SUMMARY

A. SECTION INCLUDES:

Section Title

1.1 References

1.2 Work Included

1.3 Submittals

2.1 Materials

2.2 Worker Safety Apparel

2.3 Traffic Control Devices

3.1 Maintaining Traffic

3.2 Traffic Control

B. RELATED SECTIONS

1. All bid items are to be all inclusive of traffic control, as it is the Contractor’s responsibility to do all the Work in accordance with the Contract Documents.

1.02 REFERENCES

A. Drawings and general provisions of the Contract, including general and supplementary conditions and Division 1 Specification Sections, apply to this section.

1.03 WORK INCLUDED

A. The Contractor shall furnish all materials, equipment, and labor, necessary to maintain traffic control during construction. This Work shall consist of furnishing, installing, maintaining, and removing necessary traffic signs, pedestrian signs, barricades, lights, signals, cones, pavement markings, and other traffic control devices, and shall include flagging and other means for guidance and protection of vehicular, worker, and pedestrian traffic through the Work Zone. This Work shall include both maintaining existing devices and installing additional devices, as necessary, in construction work zones.

1.04 SUBMITTALS

A. Submit for approval, in accordance with Section 01 33 00 SUBMITTAL PROCEDURES all working drawings and schedules of materials and methods proposed to be followed in the execution of the Work under this item.

B. Submittals shall show in detail, the type, number, and location of all traffic control measures to be used in the execution of the Work.

BC Project No. 159297 34 41 16.10 - 2

PART 2 PRODUCTS

2.01 MATERIALS

A. Unless otherwise specified, all materials furnished for traffic control shall meet the requirements of the Georgia Department of Transportation Standard Specifications, Construction of Roads and Bridges, Sections 148 and 150, latest edition; Georgia

Department of Transportation, Special Provision, Section 150-Traffic Control, latest edition; and the Manual on Uniform Traffic Control Devices (MUTCD), latest edition.

2.02 WORKER SAFETY APPAREL

A. All workers within the right-of-way who are exposed to traffic or to work vehicles and construction equipment shall wear high-visibility safety apparel that meets the

Performance Class for the risk exposure.

2.03 TRAFFIC CONTROL DEVICES

A. All traffic control devices used during the execution of the Work shall meet the Standards utilized in the Manual on Uniform Traffic Control Devices (MUTCD), latest edition.

PART 3 EXECUTION

3.01 MAINTAINING TRAFFIC

A. All working operations of the Contractor, Subcontractors, and/or their agents or employees must be subordinated to the free and unobstructed use of the highway, and structures encountered in the prosecution of the Work under this item.

B. The Contractor shall proceed with the Work in such manner as shall permit regular transaction of business by the GCDOT and/or property owner without delay or danger to life or property, and shall place necessary barricades, warning signs, signals, lights, and if necessary, flaggers or Police Officer(s) for the protection of the traveling public.

C. Whenever it is necessary to cross, obstruct, or close roads, driveways, and walks, whether public or private, Contractor shall provide and maintain suitable and safe bridges, detours, or other temporary expedients for the accommodation of public and private travel, and shall give a minimum of twenty-four (24) hour notice to owner(s)/tenant(s) of private drives before interfering with them.

D. In making open-cut street crossings, Contractor shall not block more than one-half (½) of the street at a time. Whenever possible, Contractor shall widen the shoulder on the opposite side of the street to facilitate traffic flow.

3.02 TRAFFIC CONTROL

A. Contractor’s proposed plan of operation shall supplement the approved traffic control plan per East Point Traffic Control Requirements or as directed by the Engineer or Owner.

B. All traffic control devices shall be in an acceptable condition when first installed on the

Project and shall be maintained throughout the construction period. All unacceptable traffic control devices shall be replaced within twenty-four (24) hours.

BC Project No. 159297 34 41 16.10 - 3

C. In the execution of the Work, if it becomes necessary to remove any existing signs, markers, etc., they shall be removed, stored and reinstalled as directed by the Engineer or Owner, to line and grade in the same condition as when removed.

D. All temporary traffic control devices shall be removed within seven (7) calendar days after completion of construction.

E. When necessary to provide a safe work zone for the Contractor and Owner employees, off-duty Police Officer(s) may be utilized to assist in maintaining safe traffic control. Use of Police Officer(s) shall be used when safety necessary, in areas of high traffic volume, installation in roadways, road closures and lane closures, or in areas of low visibility. The

Contractor shall contact the East Point Police Department to schedule an off-duty Police

Officer(s). Arrangements for Police Officer(s) must be made a minimum of forty-eight (48) hours prior to the Work to allow time for Police Officer(s) to be scheduled. Depending on the situation, the Police Officer(s) onsite may request additional Police Officer(s), if needed.

END OF SECTION

THIS PAGE LEFT INTENTIONALLY BLANK

File details come from the government source that posted it. Updated .