Sewer Pipeline Rehabilitation FY21-22.pdf

PDF 19 MB Posted

Attached to
Sewer Pipeline Rehabilitation FY21/22
Solicitation number
SWR0322
Issued by
San Diego County, California

About this file

This is a Scope of Work document for the Sewer Pipeline Rehabilitation FY21/22 Project (SWR0322) issued by a California state or local agency. The project encompasses the rehabilitation of eight existing sewer main lines through approved lining methods, sewer line lateral rehabilitation, sewer flow control, traffic control, and protection and restoration of existing improvements. All labor, material, equipment, and transportation necessary for project completion are to be included in contractor bids. The document references Table A-1 for the specific sewer mains to be rehabilitated and attached appendices for detailed construction requirements and bid items.

The file does not specify pricing terms, contract duration, response or due dates, site visit requirements, bidder's meetings, or award timelines. No set-asides, incumbents, or specific funding sources and amounts are identified in the provided documentation. Additional contract details regarding bid submission procedures, payment terms, project timeline, and financial requirements would be contained in supplementary contract documents not included in this summary.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file