Service requirements Getinge 2012790.docx
DOCX document 13 KB Posted
- Attached to
- Getinge Equipment in BSL-4 Maintenance Agreement
- Solicitation number
- RFQ-NIAID-2012790
About this file
This request for quote solicits maintenance services for Getinge equipment located in a bio-safety level 4 facility. Services include guaranteed OEM parts and technicians for quarterly preventative maintenance, inspections, calibrations, and corrective maintenance with 4 hour callback response. Annual calibration of temperature, pressure, pH and conductivity monitoring equipment is required. The period of performance is July 3, 2020 to July 2, 2021. Quotes are due by June 30, 2020 to the National Institutes of Health National Institute of Allergy and Infectious Diseases for award of a firm fixed price purchase order for services at the Integrated Research Facility in Frederick, Maryland. The solicitation applies various FAR provisions including those related to representations, telecommunications equipment, accelerated payments to small businesses, and equal employment investigations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 52.212-5_JAN2020.pdf | ||
| Service Coverage and Equipment List Getinge 2012790.xlsx | XLSX spreadsheet | |
| Provision 52.204-26 Dec 2019.pdf | ||
| FAR 52.204-24 Provision Dec 2019.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Service requirements:
Guaranteed OEM Parts and OEM Technicians only
Quarterly Preventive Maintenance and Inspections, Calibrations, and all Break Fix Callback Parts and Labor
Parts will all be Original Equipment Manufacture approved
All work documented
Coverage, Monday – Friday excluding holidays, 7AM-5PM. Call back response time is within four (4) hours of point of call and same day equipment review when a service rep is in building.
Yearly Calibration of Equipment Temperature Sensors, Pressure Transducers, PH and conductivity monitoring probes and controls.
All parts normally excluded i.e. Door Gaskets, Filters and Vacuum Pumps are included
File details come from the government source that posted it. Updated .