Service requirements Getinge 2012790.docx

DOCX document 13 KB Posted

Attached to
Getinge Equipment in BSL-4 Maintenance Agreement
Solicitation number
RFQ-NIAID-2012790
Issued by

About this file

This request for quote solicits maintenance services for Getinge equipment located in a bio-safety level 4 facility. Services include guaranteed OEM parts and technicians for quarterly preventative maintenance, inspections, calibrations, and corrective maintenance with 4 hour callback response. Annual calibration of temperature, pressure, pH and conductivity monitoring equipment is required. The period of performance is July 3, 2020 to July 2, 2021. Quotes are due by June 30, 2020 to the National Institutes of Health National Institute of Allergy and Infectious Diseases for award of a firm fixed price purchase order for services at the Integrated Research Facility in Frederick, Maryland. The solicitation applies various FAR provisions including those related to representations, telecommunications equipment, accelerated payments to small businesses, and equal employment investigations.

View the file

Other files

File Type Posted
52.212-5_JAN2020.pdf PDF
Service Coverage and Equipment List Getinge 2012790.xlsx XLSX spreadsheet
Provision 52.204-26 Dec 2019.pdf PDF
FAR 52.204-24 Provision Dec 2019.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Service requirements:

Guaranteed OEM Parts and OEM Technicians only

Quarterly Preventive Maintenance and Inspections, Calibrations, and all Break Fix Callback Parts and Labor

Parts will all be Original Equipment Manufacture approved

All work documented

Coverage, Monday – Friday excluding holidays, 7AM-5PM. Call back response time is within four (4) hours of point of call and same day equipment review when a service rep is in building.

Yearly Calibration of Equipment Temperature Sensors, Pressure Transducers, PH and conductivity monitoring probes and controls.

All parts normally excluded i.e. Door Gaskets, Filters and Vacuum Pumps are included

File details come from the government source that posted it. Updated .