Serv C26-134 Draft PWS 09-03-2026.pdf
PDF 475 KB Posted
- Solicitation number
- ServC26-134
About this file
This is a Performance Work Statement (PWS) for Serv C26-134 Daily Freezer Replacement (Lay Up Room), prepared by OC-ALC OBCA and dated August 5, 2026.
The contract requires the replacement of refrigeration systems for two walk-in freezers located in Building 9001 at Oklahoma City–Air Logistics Complex (OC-ALC). The existing composite freezers, which store prepreg materials for the 553rd Composite Repair section, have exceeded their typical 11-year lifespan at 13 years of service and require multiple corrective maintenance actions due to recurring defrost-cycle malfunctions. The total replacement cost is estimated at $62,000 ($31,000 per freezer). This is a turnkey project requiring the contractor to provide all labor, materials, equipment, and services to deliver fully operational systems capable of maintaining a –10°F setpoint. The new refrigeration systems must comply with EPA's 2026 regulations, utilizing low-GWP A2L refrigerants (preferably R454A) and be fully compatible with existing electrical infrastructure (single-phase, 208V, 60Hz) without modifications to the freezer box panels or disconnect boxes. Specific evaporator units (EL26-079-2EC-PR-A or equivalent) must deliver 7,900 BTUH cooling capacity with 1,600 CFM airflow, and condenser units (PC225ALZOP-2S or equivalent) must provide 14,209 BTUH total heat rejection with a 2.25 horsepower Copeland compressor. Contractor responsibilities include removal and disposal of existing refrigeration systems, procurement and delivery of new equipment, ACR hard copper piping installation with 1-inch thick-wall suction line insulation, all electrical work, system startup and testing, and replacement of two door gaskets per freezer. The contractor must provide lead times not exceeding 10 weeks for procurement and delivery, complete system component drawings, all manuals and parts lists, and operator training documentation. The contract includes extensive safety, environmental, and compliance requirements including OSHA standards, hazardous materials management, waste disposal procedures, security briefings, driver training, and FOD/DOP awareness training for all contractor personnel working at Tinker AFB.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Serv C26-134 Sources Sought Synopsis 09-14-2026.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Serv C26-134 Daily Freezer Replacement (Lay Up Room)
Prepared by:
OC-ALC OBCA
5 August 2026
Commanders Safety Intent: The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.
Section One
Description of Services
1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform replacing the existing refrigeration systems for two (2) walk in freezers located in the layup room in Building 9001, Post F-16 the Oklahoma City–Air Logistics Complex (OC-ALC). The equipment is listed in Appendix A (On-Base).
1.1.1 The Contractor shall be responsible for ensuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Known Problems: The existing daily‑use composite freezers, which store prepreg for the 553rd Composite Repair section, have reached 13 years of service—exceeding the typical 11‑year expected lifespan for this type of equipment. In recent months, the freezers have required multiple corrective maintenance actions, primarily due to recurring defrost‑cycle malfunctions. The cost to replace the refrigeration system on one freezer is $31,000. Since both freezers require refrigeration system replacement, the total cost would be $62,000.
1.2.1 Beginning January 1, 2026, all newly manufactured freezers must comply with updated EPA regulations that phase out high‑GWP HFC refrigerants. Future equipment purchases must use approved low‑GWP A2L refrigerants to meet these standards. Replacing aging refrigeration units now ensures compliance with the 2026 requirements and protecting high-value HazMat materials.
1.3 Requested Services: The Contractor shall replace the existing refrigeration systems for two
(2) walk-in freezers. The new refrigeration systems must be fully compatible with the existing electrical setup, power requirements (Single-phase, 208 V, 60 Hz), and freezer box panels (9 ft × 9 ft × 8 ft 5 in). No modifications are permitted to the freezer box panels or their disconnect boxes. The existing freezer box panels will be reused.
This is a turnkey project, requiring the contractor to provide all labor, materials, equipment, and services necessary to deliver fully operational systems capable of maintaining a –10°F setpoint.
Contractor Responsibilities (Turnkey Scope)
Refrigeration Requirement Evaporator Unit Requirement
• Shall be electric-defrost evaporator assembly, model EL26-079-2EC-PR-A or equivalent and be suitable for low-temperature walk-in applications
• Shall be using low-GWP A2L refrigerant and meets the EPA’s 2026 requirements for new commercial refrigeration systems. Prefer R454A refrigerant.
• Performance requirements:
o Cooling Capacity: 7,900 BTUH o Airflow: 1,600 CFM o Annual Walk-In Energy Factor of 4.00 Btu/W-h o Operating Modes: Off-cycle, air defrost w/timer, electric defrost, demand electric defrost
• Electrical Requirements:
o Power Supply: 208–230V, 1-phase, 60 Hz o Max Total Connected Load: 13.1A o Minimum Circuit Ampacity: 15A o Maximum Overcurrent Protection: 20A o Fan Motors: EC two-speed motors, 1.0A @ 208–230V or equivalent o Defrost Heaters: 13.1A @ 208–230V or equivalent o Control Circuit: 24V transformer included o Electronic Temperature Control: Required (factory installed)
• Mechanical Requirements:
o Suction Connection: 5/8" ODF o Liquid Connection: 3/8" ODF o Drain Connection: ¾-14 NPT
• These following components shall be included with the Unit o Expansion valve (factory installed) o Digital temperature control (factory installed) o EC evaporator fan motors – two-speed o Leak detection – two sensors required (factory installed) o Safety shut-off / liquid line solenoid valve o Safety check valve
Condenser Unit Requirement
• Shall be designed for low-temperature A2L (prefer R454A) refrigeration applications, model PC225ALZOP-2S or equivalent.
• Unit shall comply with AHRI 1250 test method
• Annual Walk-In Energy Factor of 3.15 or higher. Rating must meet DOE requirements.
• Performance Requirements:
o Compressor Model: Copeland YF07KAE-PFV or equivalent with 2¼ Horsepower
• Electrical Requirements o Power Supply: 208–230V, 1-phase, 60 Hz o Compressor RLA: 12.4A or equivalent o Compressor LRA: 88A or equivalent o Condenser Fan Motor FLA: 1.1A or equivalent o Max Total Unit Amps: 13.7A o Minimum Circuit Ampacity (MCA): 16.8A o Maximum Overcurrent Protection (MOPD): 25A
• Mechanical Requirements o Total Heat Rejection of 14,209 BTUH or equivalent to maximize the entire system efficiency
• Refrigerant Piping Requirements o Suction Line: 7/8" OD o Liquid Line: 3/8" OD
• Controls & Safety Requirements: Unit shall include the following controls as a minimum o High-pressure control o Low-pressure control o High discharge cut-out switch o Time delay relay o Fan cycle head pressure control o Crankcase heater o Electric defrost timer
Removal and Disposal
• Pump down and safely remove the existing refrigeration systems from both units.
• Properly dispose of all removed equipment and refrigerant in accordance with industrial regulations.
Procurement and Delivery
• Procure new refrigeration systems compatible with the existing electrical and mechanical configuration.
• Deliver all equipment to the project site.
• Provide all required materials, hardware, and accessories.
• Provide all labor, equipment, materials, and tools required for complete installation.
• Supply only new, commercially available equipment—no prototype or experimental models.
Installation Requirements The contractor shall:
1. Meet delivery trucks and off-load refrigeration equipment.
2. Install new refrigeration condensers and evaporators.
3. Provide nylon all-thread and stainless-steel hardware for evaporator coil suspension.
4. Install new ACR hard copper piping and 1" thick-wall suction line insulation.
5. Provide all unistrut, hangers, brackets, trapeze supports, pipe clamps, all-thread, and anchors as needed.
6. Provide all fittings, silver solder, welding supplies, and labor required for refrigeration piping.
7. Perform leak checks with nitrogen, pull vacuum, and charge the system with new refrigerant.
8. Perform all electrical work, including:
o Disconnecting power from existing units o Removing conduit and demolition as required o Reinstalling receptacles in their current locations o Providing new power connections from existing disconnects to the new evaporators and condensing units o Mounting and wiring lights o Installing new seal-offs at penetration points and GRC inside the freezers
9. Install drains, furnish and install heat tape (if required), and insulate drain lines.
10. Start up all refrigeration systems, set pressure switches and controls, calibrate thermometers, and verify temperature performance.
11. Seal all refrigeration penetrations.
12. Replace two (2) door gaskets per freezer.
System Performance Requirements The completed installation must deliver:
• Fully operational refrigeration systems
• Ability to maintain a –10°F setpoint under normal operating conditions
• Proper integration with existing freezer box panels and electrical infrastructure
Startup and Training Requirements The contractor shall:
a. Conduct full system startup and functional testing to verify proper operation of all installed components.
Deliverables at Time of Solicitation (Offeror Requirements)
The Offeror shall provide:
a. Detailed descriptions, specifications, and sketches demonstrating compliance with this Statement of Work (SOW).
b. Justification for any proposed alternative solutions, demonstrating how they meet or exceed the requirements.
Deliverables at Time of Installation (Contractor Requirements) The Contractor shall provide:
a. Fully installed and operational freezers capable of achieving a –10°F setpoint.
b. New refrigeration system component drawings.
c. All manuals and parts lists associated with the newly installed equipment.
d. Operator training and supporting documentation.
Schedule Requirements The contractor shall include in the proposal:
• Lead time for procurement and delivery. Lead time shall not be more than 10 weeks.
• Service time required to complete installation for both freezers
1.3 Over and Above (O&A): O&A is defined as work discovered during the course of performing the repair efforts that is within the scope of the contract and necessary in order to satisfactorily complete the contract. The Contractor shall complete O&A requirements In Accordance With (IAW) Defense Federal Acquisition Regulation Supplement (DFARS) 252.217-7028. PGI 217.77.
1.3.1 Malfunction and Notification Process: Upon occurrence of an equipment or system malfunction, the GPOC will contact the Contractor by telephone, email, or fax and provide information below. If the GPOC notifies the Contractor via telephone, the GPOC will provide a written copy of the request by email or fax.
• the equipment identification number (ID#)
• a brief description of the malfunction
• location of equipment
• name and telephone number of the Point of Contact (POC)
Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days. (Tailor these dates dependent upon your requirement.)
1.3.2 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the GPOC by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:
• the equipment ID#
• date of evaluation
• description of findings and recommendations
• required parts and part numbers (P/N)
• cost of parts
• number of parts needed
• estimated labor hours required to complete the repair
Any recommendations cited shall consider:
• the priority of the requested service
• available source for obtaining new parts
• the availability of the new parts
• shipping and delivery schedules of parts
• other factors which may be peculiar to the specific repair requirement
1.3.3 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The GPOC will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.
Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the GPOC, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The GPOC will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.
1.3.4 Service Report: Immediately upon completion of any maintenance and before leaving the OC-ALC, the Contractor shall provide a draft, written Service Report to the SME. When necessary the SME will forward the draft service report to the GPOC within 2 business days of receipt. The
Contractor shall provide, by fax or email, the final service report within 5 business days to the GPOC. As a minimum, the final service report shall contain the following information:
• Company Name
• Requested service date
• Contract #
• Equipment ID #
• Description of Services provided
• Additional Services recommended (if any)
• Printed Name and Signature of Technician who performed the Services (electronic signatures are acceptable)
• Printed Name and Signature of on-site SME or GPOC (electronic signatures are acceptable)
• Start and Completion dates
• Complete Breakdown of the Labor Cost (hours and rate)
• Materials and Parts used
• Details of any other charges
• Printed Name and Signature stating only new parts and materials were used (electronic signatures are acceptable)
• Written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order. (electronic signatures are acceptable)
1.4 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.
1.5 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 8:00 am - 5:00 pm. If work hours are required outside the hours stated, the Contractor shall contact the GPOC for approval from the CO. Upon approval from the CO, the Government Subject Matter Expert (SME) or GPOC must be present with the Contractor.
1.5.1 These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
1.6 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and GPOC, in writing, within ten (10) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.
The Contractor and Contractor personnel shall be required to identify themselves as contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB. The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.6.2 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the GPOC within five
(5) business days after the contract award date. Within ten (10) business days, the Contractor shall also provide an updated listing of personnel to the GPOC when employees affecting the work of this contract change status or position.
The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty GPOCs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.
OC-ALC PWS/SOW Template Environmental Language
Dated 5 OCT 2017
ENVIRONMENTAL PROTECTION & SAFETY: MANDATORY on all Service Contracts.
Supervisor: Krystal Tilson 76MXSG/MXDEU PH# 622-7796
1.7 Environmental Certification: The Government will ensure the part or equipment is clean, drained and purged before it is transferred to the Contractor for repair. The Government will provide written certification of such to the Contractor prior to shipment or pick up of the part or equipment. Certification will be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification will contain description of the part or equipment, make, model, serial number, and OC number (if applicable). This certification will be provided to the GPOC three (3) business days prior to the pick-up or shipment of the part or equipment. The GPOC will, in turn, provide it to the Contractor within two (2) business days prior to the pick-up or shipment of the part or equipment.
The Contractor shall ensure and provide written certification that the repaired part or equipment is cleaned to remove all hazardous contaminants, dirt, shavings, oil, or grease, and drained and purged to remove all fluids, oils and liquids before returning to Tinker AFB. Certification shall be by official correspondence with a statement which specifies the part or equipment is certified to be clean, drained and purged. In addition, as a minimum, said certification shall contain description of part or equipment, make, model, serial number, and OC number (if applicable). This certification shall be provided to the GPOC two (2) business days prior to the return of the part or equipment.
1.8 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
1.8.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (DAFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per 'Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32- 101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.”
1.9 Hazardous Material (HAZMAT): If no HAZMAT will be brought on Base or used in performance on this contract, the Contractor shall certify that “No HAZMAT will be brought on Base” or “No HAZMAT Usage” by official correspondence. This Certification shall be provided to the GPOC within ten (10) business days after award. After the GPOC has received the Certification, the requirements of this section no longer apply. Appropriate penalties for the Contractor shall be assessed if found in violation of the above Certification.
1.9.1 The Contractor shall comply with applicable federal and military procurement policies IAW OC-ALC Supplement to DAFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall obtain access to the standardized Air Force HAZMAT tracking system and manage HAZMAT within the system or have a government designated HAZMART comply. The Contractor shall establish and reconcile the inventory, print the standardized Air Force HAZMAT tracking system bar code labels, and apply the labels to containers of HAZMAT so that the Occupational Safety and Health Administration (OSHA) compliant labels are not covered. Any failure to comply with proper HAZMAT management procedures shall be reported to the CO and GPOC who will notify 76 MXSG/MXDEU, OC-ALC Environmental Compliance.
1.10 Safety Data Sheet (SDS) and Labeling: Upon GPOC receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.
http://www.e-publishing.af.mil/
1.10.1 Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the GPOC, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the GPOC prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s);
pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The GPOC will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the GPOC if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.
1.11 Air Quality Recordkeeping: Upon GPOC receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.
1.11.1 The Contractor shall be responsible for specific recordkeeping and reporting requirements, when applicable, mandated by Tinker Air Force Base Facility-Wide Operating Permit IAW OC- ALCI 32-101. The GPOC will contact the UEC for environmental requirements. The Contractor shall submit all applicable records on a monthly basis to the GPOC no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the (third) 3rd. The GPOC will forward the records to the UEC no later than the fourth (4th) day of the following month or the first subsequent business day. Contractor shall maintain a signed copy of the form(s) required per OC-ALCI 32-101 on site for one (1) year.
1.12 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the Contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the GPOC within ten (10) business days after award. Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.
1.12.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers IAW TAFB
HWMP.
1.12.2 The Contractor shall be responsible for the Initial Accumulation Point (IAP) within the Contractor assigned space. The IAP shall be under the direct control of the Contractor who generates the waste. Before accumulation begins, the Contractor shall ensure appropriate hazard labels are affixed to government furnished waste containers as specified in 49 Code of Federal
Regulation (CFR) 172.400. Management procedures for IAPs include written weekly inspections and reporting. When the container has been filled, the Contractor shall seal the container, mark the Certified Filled Date on the container label using an indelible pen, place the container at a designated pick-up location, and call the Hazardous Waste Management Facility (HWMF) at 734- 3285 for pick-up service. The Contractor shall ensure the HWMF picks up the container within three (3) calendar days after the Certified Filled Date. If container is not picked up within three (3) calendar days, Contractor shall notify the GPOC who will notify 76 MXSG/MXDEU, OC-ALC Environmental Engineering Section.
1.12.3 The Contractor shall perform written weekly inspections using Tinker AFB IMT Form 487, Initial Accumulation Point Management Aid. Weekly denotes once per working week. The Contractor shall submit Tinker AFB IMT Form 487 on a monthly basis to the GPOC no later than the third (3rd) day of the month following the reporting period. If the third (3rd) day of the month is a weekend or holiday, the logs are required by the last business day 'PRIOR' to the third (3rd). The GPOC will forward the form(s) to the UEC no later than the fourth (4th) day of the following month or the first (1st) subsequent business day. Contractor shall maintain a signed copy of the form(s) on site for one (1) year.
1.13 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Wastewater Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the GPOC within ten (10) days after award. The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.
1.14 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the GPOC and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
1.14.1 One (1) copy to the CO, two (2) copies to the GPOC, a copy for UEC and one (1) copy for record. The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken
10.) Organizations contacted 11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.)
and whether 911 was called and which agencies responded.
1.15 Environmental Training: Upon GPOC receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.
1.15.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements and an annual refresher classes, updates the person on changes to those rules. This training can be obtained through creditable training institutions or companies. All training will be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm, http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000, and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR within thirty (30) calendar days after contract award date. Annual refresher training certificates for the supervisor and employees managing the initial accumulations points (IAPs) shall be provided to the COR, within ten (10) calendar days after each option year renewal. The COR will forward a copy of the certificates to the UEC.
1.16 Forms, Technical Orders (T.O.), AFI, Air Force Material Command Instructions (AFMCI), and Publications: The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at www.e-publishing.af.mil. In the event a form or publication is not available online, the GPOC will provide the form, instruction, or publication to the Contractor upon the Contractor’s written request (e-mail is acceptable). In the event, laws, regulations, T.O.’s, AFI’s, or AFMCI’s change during the term of this contract, the Contractor shall be required to comply as the changes come into effect. Contractors delivering or handling official United States Air Force (USAF) records shall comply with the applicable records management regulations in AFI 33-322, Chapter 3, in its entirety.
1.17 OC-ALC Security and OPSEC briefing: All Contractor personnel working on base in the OC-ALC shall be required to read the OC-ALC Security and OPSEC briefings. The GPOC will ensure the Security and OPSEC briefings are available for review by the Contractor. The Contractor shall provide the GPOC with a report within five (5) business days after receiving the briefings. The report shall contain the employee’s name and the date of review. These requirements are IAW AFI 16-1404, “Information Security”, Chapter 6, Paragraph 6.2-6.2.3, 6.4-6.4.4.; DoDI
5220.22 “Industrial Security”, Section 9, Paragraph 9.2(6).; AFI 10-701, “Operations Security”, Chapter 4, Paragraph 4.4. and OC-ALC 16-1404, “OC-ALC Security”, Paragraph 7.
1.17.1 The original contract sponsor will ensure delivery personnel are made aware that any photography or videography are not allowed on Tinker Air Force Base or its associated http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 http://www.lion.com/Storing-Hazardous-Waste-for-LQGs http://www.e-publishing.af.mil/ areas. Additionally, the disclosure (sharing) of any Department of Defense information, obtained from or while on Tinker Air Force Base, is unauthorized. Unauthorized disclosure can lead to severe penalties, including fines, imprisonment, and administrative action.
1.18 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.
1.18.1 Foreign Object Damage (FOD) and Dropped Object Prevention: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36-2650, AFMC Supplement 1, paragraph 9.2., and A4.4.4. (Initial)/A4.4.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training by viewing the Digital Versatile Disc (DVD) provided by the GPOC.
1.18.2 The Contract Manager shall provide written certification to the GPOC for each employee prior to the employees starting work in the OC-ALC shops. The certification shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide written certification of training to the GPOC prior to the employees starting work in the OC-ALC shops.
Every 36 Months, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide written certification to the GPOC.
1.18.3 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the GPOC. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the GPOC within five (5) business days after (insert type of action, i.e. PM, RM, etc.) actions.
The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the GPOC of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The GPOC will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the GPOC. The CM shall ensure each employee on the job site receives a briefing from the GPOC about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.
1.19 Privately Owned Motor Vehicles (POV): Contractor Contractor’s personnel shall comply with the directives pertaining to the operation of POVs on Tinker AFB, per DAFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24- 302, in its entirety for the operation of POVs within Tinker AFB.
1.20 Required Initial and Refresher Courses for On-Base Driver’s Training: The Contractor and all Contractor employees shall take and pass the on-base Driver’s Training Course before driving on or in the Ramp areas. The Contractor shall contact the GPOC to schedule training. On an annual basis, the Contractor shall take the refresher on-base Driver’s Training Course. The Contractor shall submit each employee’s on-base Driver’s Training Course certificates to the GPOC upon completion of the initial or refresher courses.
1.21 FOD Training for Vehicle Operations: Vehicle operators shall complete all FOD awareness and prevention training, as well as testing requirements, before driving any vehicle on the flight line. The Contractor shall comply with DAFI 13-213_TINKERAFBSUP a10.4.1 & 2.16.4.
a) A10.4.1 - Airfield entry points. Entry points are marked with warning signs stating you are entering the airfield. Only government or POV/contractor owned/government leased vehicles with an airfield or ramp pass are authorized on the airfield. A FOD checkpoint is located at each airfield entry point.
b) 2.16.4 - Contractors. In accordance with DAFMAN 91-203, it is the responsibility of the Contracting Division to ensure contractors understand and comply with the airfield driving program and base personnel security access requirements. Additionally, they will inform AM and 72 SFS of contractors who will have a requirement to drive on the airfield.
No contractor is authorized to drive on Tinker airfield until properly trained and access granted. This requirement must be written in contract agreements.
1.22 Visitors Pass: The Contractor shall contact the GPOC seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The GPOC will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
1.23 Foreign Nationals: The Contractor shall notify the GPOC before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
1.24 Safety and Health on Government Installations: While performing work under this contract the Contractor shall comply with all applicable federal, state, and local and the specific Air Force regulations (as applicable) regarding occupational safety and health addressed in the PWS. During the execution of the contract the Contractor shall notify the CO, GPOC, and Government Contract Administrator (CA) within one (1) business day of any damage to Government property where the dollar value exceeds $500,000.00 and within two (2) work days, for any damage to Government property less than $500,000.00. The Contractor shall notify the (CO) within one (1) business day of any injury to contract personnel which occurs while on a Government installation.
1.24.1 Mishap notifications shall contain, as a minimum, the following information:
• Contract, Contract Number, Name and Title of Person(s) Reporting
• Date, Time and exact location of accident/incident
• Brief Narrative of accident/incident (Events leading to accident/incident)
• Cause of accident/incident, if known
• Estimated cost of accident/incident (material and labor to repair/replace)
• Nomenclature of equipment and personnel involved in accident/incident
• Corrective actions (taken or proposed)
• Other pertinent information
1.24.2 If requested by the designated CO, the Contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by the Procuring Safety Office. Contractors will not dispose of contract data related to a mishap until notified to do so by the CO.
1.24.3 Applicable Regulations and Air Force Instructions:
29 CFR 1910 OSHA Standards for General Industry AFI 91-203 Air Force Consolidated Occupational Safety Instruction AFI 91-207 THE US AIR FORCE TRAFFIC SAFETY PROGRAM 12 Sep 2013
AFI 31-218 AIR FORCE MOTOR VEHICLE TRAFFIC SUPERVISION
1.24.4 While on a government installation the Contractor shall be required to follow applicable installation traffic safety regulations and any applicable safety requirements required by the work center supervisor as it pertains to execution of the contract while in the work center; these may include but are not limited to general personal protective equipment such as safety glasses, hearing protection, and hard hats. The Contractor shall comply with base/shop emergency procedures for fire, tornado etc.
1.25 Communicating Hazards Of Workplace (CHOW): Contractor’s onsite representative communicates all hazards being introduced to the worksite by the Contractor. This is accomplished prior to commencement of work and refreshed daily during performance, IAW Contractor’s Site Safety Plan.
1.26 Safety and Health Plan: The Contractor shall be responsible for compliance with the OSHA Public Law 91-596. The Contractor shall submit a Safety and Health Plan (SHP) and corresponding site safety checklist to the CO and the GPOC (see Appendix C).
1.27 Combating Trafficking in Persons: IAW DFARS PGI 222.17, the GPOC shall pursue, as appropriate, the following methods of monitoring the Contractor’s performance regarding trafficking in persons such that non-compliances with FAR clause 52.222-50 are brought to the immediate attention of the Contracting Officer:
a. Keep the lines of communication open with the Contractor. At the Post-Award conference, remind the Contractor of his contractual responsibilities to notify the government if the Contractor receives notification of any alleged violations to this policy or if actions have been taken against the Contractor employees, subcontractor’s or subcontractor employees pursuant to the clause.
b. When appropriate, encourage Contractor to complete Human Trafficking Awareness Training.
c. Encourage the Contractor to take steps to investigate and eliminate slavery and human trafficking in their supply chains and to publish information for consumer awareness.
d. Periodically access the Department of State’s Trafficking in Person (TIP) website for updates and to view the latest reports. http://www.state.gov/g/tip
1.28 Speak Up for Safety: Safety surety is an integral part of our overall goal of establishing a world class safety and health program. Our “Speak Out for Safety” initiative ensures a partnership with contractors and government employees to further enhance safety to ensure we are looking out for all our partners and empowers all employees to actively participate in each other’s safety.
1.28.1 A safe workplace is everyone's business. As part of the contract team, military, civilian and contractor personnel are empowered to Speak Out for Safety (S.O.S.) when they observe an unsafe act.
1.28.2 Government personnel are empowered to intercede in events that pose imminent danger to personnel or catastrophic damage to property.
1.29 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
1.30 Training – General (including but not limited to): The Government GPOC will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC.
The Government will be responsible for all approved costs associated with the training identified below. The GPOC will document training on and maintain copies of the completed AF IMT 2426, Training Attendance and Rating, as part of the contract surveillance file. The Government will add or remove training as required per Air Force Regulation.
The Contractor shall contact the GPOC prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed:
Contractor Required Courses Course Number FOD and DOP Awareness Training Course Initial CHPMAS0000400SU AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB Initial Fire Safety and Prevention Training CTESAF0000100SU Refresher Fire Safety and Prevention Training, Computer Based Training (CBT)
CTEMAS0002900CB
OC-ALC Environmental Accountability/Solid Waste Training, CBT MTEMAS9713800BR OC-ALC Human Factors Training, CBT MTEPDV9775100BR Environmental Management Systems (EMS) - General Awareness Training MTEENV9733070BR
ISO 50001 – Energy Management Training http://www.state.gov/g/tip
Records Management - User Training MLMW0188 Controlled Unclassified Information (CUI) Training_2022BG ZZZ2021CUI OC-ALC/OB Initial Workplace Specific FOD/DOP Briefing MTEMAS0002011BR If the Contractor IS going on to the shop floor, this class is required:
Lockout/Tagout Initial and Refresher Course for Affected Personnel, CBT
CTEMAS0003001CB
If the Contractor is NOT crossing the yellow line into the shop, this class is required:
Lockout/Tagout Course for Others, CBT CTEMAS0003002CB If the Contractor IS going to actually lockout/tagout equipment, these classes are required:
Lockout/Tagout Initial Course TE00141 Lockout/Tagout Refresher Course for Authorized Personnel, CBT CTEMAS0003000CB If Contractor IS handling Hazardous Materials, these classes are required:
Hazardous Waste Management Practices MTEENV0000100SU Hazardous Waste Management Practices - Annual Refresher MTEENV0000200SU Hazardous Chemicals, Handling and Storage MTESAF0008400SU
Section Two
Reserved
SECTION THREE
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES.
3.1. Government Furnished Property (GFP).
3.1.1. Government Property Repair/Maintenance (or Similar Requirement) On-Base.
Note: Same as Government Property Incidental to Government Installation or Site.
Not Applicable or Narrative Below.
Government Property Repair/Maintenance On-Base is not considered GFP in accordance with (IAW) Federal Acquisition Regulation (FAR) Parts 45 and 52.245 plus supplements. The responsible Government Organizations CMXG for Government Property Repair/Maintenance On-Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and disposal during the performance of this contract.
3.1.2. GFP - Repair/Maintenance Off-Base.
Not Applicable
3.2. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:
3.2.X. Security Forces. The Government will provide general on-base security forces’ service.
The security forces’ telephone numbers are 911 for emergencies, 405-734-2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.
3.2.X. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405-734-7964 for after hours and weekends. For routine calls to dispatch call 405-734-7964.
NOTE: If applicable, Government Contracting Officer Representative (COR) or Government Point of Contact (GPOC) needs to verify if the Government will provide, inspect, and maintain the fire extinguishers in Contractor occupied space.
3.2.X. Utilities. The Government will provide utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide. Contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.
3.2.X. Postal Distribution. The Government will provide on-base mail distribution, United States Postal Service (USPS) distribution only for official Government mail required under terms of this contract.
3.2.X. Telephone. The Government will provide telephone service consisting of the following Classes of Service. The Contractor shall ensure that the Government provided telephone usage is limited to only official Government business related to the performance of this contract. The Contractor shall furnish their own telephone service provided by local commercial carrier for their use in matters other than official Government business.
NOTE: Only list applicable telephone service(s).
CLASS "A"/ CLASS OF SERVICE "1"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- Dial "98" for long distance calls
- Dial "94" Defense Switched Network (DSN) calls
- On-base calls
CLASS “D” / CLASS OF SERVICE "2"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- Dial "94" Defense Switched Network (DSN) calls
- On-base calls
CLASS “G” / CLASS OF SERVICE "3"
- For on-base calls only
CLASS "H" / CLASS OF SERVICE "4"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- Dial "98" for long distance calls
- On-base calls
*CLASS "F"/ CLASS OF SERVICE "5"
- Dial "99" for local off-base and toll free calls (1-800, etc.) -- NOTE: Do not use this option for long distance calls
- On-base calls
3.2.X. Custodial Services. The Government will provide custodial services limited to the extent provided in the Base Custodial Contract(s) for the Government provided facilities.
3.2.X. Refuse Collection. The Government will provide refuse collection services limited to the extent provided in the Base Refuse Collection Contract(s) for the Government provided facilities. The Government will only allow non-hazardous refuse to be emptied into the nearest authorized refuse dumpster for trash collection.