Effective Date:
Expiration Date:
Check https://ipdtdms.gsfc.nasa.gov to verify that this is the correct version prior to use
400-FORM-0002 (4/16/2014)
National Aeronautics and Space Administration
Goddard Space Flight Center Greenbelt, Maryland
MSRCCRS-SD-LIST-0011, Revision
Mars Sample Return - Capture, Containment and
Return System (MSR-CCRS) Project
NASA/GSFC Code 435
CCRS
818mm (32in) Separation System
Deliverable Items List and Schedule https://ipdtdms.gsfc.nasa.gov/
CCRS Separation System DILS MSRCCRS-SD-LIST-0011 ii
CCRS
Separation System
Deliverable Items List and Schedule
Signature/Approval Page
Prepared by:
Reviewers/Approvers:
Approved by:
*** Electronic signatures are available on-line at https://ipdtdms.gsfc.nasa.gov*** iii
Preface
This document is a Mars Sample Return (MSR) Capture, Containment and Return System
(CCRS) Project configuration control board (CCB) controlled document. Changes to this document require prior approval of the CCB Chairperson or designee. Proposed changes shall be submitted in the Technical Data Management System (TDMS) via a configuration change request (CCR) along with supportive material justifying the proposed change. Changes to this document will be made by complete revision.
All of the requirements in this document assume the use of the word "shall" unless otherwise stated.
Questions or comments concerning this document should be addressed to:
CCRS Configuration Management Office
Mail Stop: 435
Goddard Space Flight Center
Greenbelt, Maryland 20771
GSFC-DL-CCRS-TDMSCM-Admin@mail.nasa.gov iv
Change History Log
Revision Effective Date Description of Changes
(Reference the CCR Approval Date)
Revision -v
Table of TBDs/TBRs/TBSs [optional]
Action Item
No.
Location Summary Individual/
Organization
Actionee vi
Table of Contents
1 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Related Documentation
1.3.1 Applicable Documents
1.3.2 Reference Documents
2 DELIVERABLES
Appendix A Abbreviations and Acronyms
List of Tables
Table 1. Hardware Delivery Schedule - Capture Lid Mechanism Table 2. Data Delivery Documentation and Schedule –Capture Lid Mechanism
1 INTRODUCTION
1.1 Purpose
This document is the Mars Sample Return (MSR) Capture, Containment and Return System
(CCRS) 818mm Separation System Deliverable Items List and Schedule (DILS).
1.2 Scope
This document lists all of the deliverables for 818mm Separation System, the SOW paragraph number where the deliverable is described further, the type of response required from NASA
GSFC, the format of the deliverable, and the schedule for delivery.
1.3 Related Documentation
The latest revisions of all documents below at the time of contract execution shall be used unless otherwise specified.
1.3.1 Applicable Documents
The following documents are referenced within this document and are directly applicable or contain policies or other directive matters that are binding for the contents of this document. In the event of conflict between an Applicable Document and the content of this document, the
CCRS Project Configuration Change Board has the final authority for conflict resolution.
Document Number Title
MSRCCRS-SD-SOW-
CCRS Separation System Statement of Work
1.3.2 Reference Documents
The following documents are referenced herein and amplify or clarify the information presented in this document. These documents are not binding on the content of this document.
Document Number Title
MSRCCRS-SD-SPEC-
CCRS Separation System Specification
1.4 Terminology
The term “Buyer” refers to code 210, who is the procuring authority on behalf of the
Government.
The term “Seller” or “Vendor” or “Supplier” refers to the manufacturer and provider of the
CCRS Separation System defined in the MSRCCRS-SD-SOW-0011.
The term “Government” refers to the NASA Goddard Space Flight Center (GSFC).
The term “GSFC” refers to the NASA Goddard Space Flight Center (GSFC) or GSFC CCRS project.
2 DELIVERABLES
The following are definitions of the table header used in Error! Reference source not found.Table 1 and Table 2:
Description: This provides the Title of the deliverable item.
Reference: This provides the reference back to the pertinent document calling out the deliverable.
Category:
A = Approval – Items in this category require approval from the National Aeronautics and Space Administration (NASA)/Goddard Space Flight Center (GSFC) Contracting
Officer (CO). In general, documents may be provided in contractor format as long as required content, as specified in the CCRS Capture Lid Mechanism SOW MSR-CCRS-
CCM-SOW-0003, is addressed. The NASA GSFC CO reserves the time-limited right of disapproval for each submission. The time-limited period is two weeks from receipt of documents.
R= Review – Items in this category do not require formal NASA GSFC CO approval but will be reviewed by the GSFC or its designated representatives in order to determine contractor effectiveness in meeting contract objectives. When Government review reveals inadequacies, the contractor may be requested to correct the inadequacies. GSFC will review and comment within 20 working days of receipt.
I = Information – Items in this category are informal and are for information only.
Format: This provides the format for the deliverable. For documents, the following format applies:
E = Electronic – Provide submittal in electronic format to the CCRS Project Library, COR, and Contracting Officer. The contractor and COR shall jointly determine the type of electronic format (e.g., Word, Excel, PowerPoint, PDF, MATLAB) acceptable for each deliverable.
Quantity: This provides the required number of copies for the deliverable. All data is required to be submitted electronically. The number in the quantity column refers to the number of hard copies required.
Delivery Date: This provides the fixed or relative date or time that the deliverable is required.
Table 1. Hardware Delivery Schedule – Separation System
Item
Description Reference Quantity Delivery Date
(no later than)
1 Active Separation Rings SOW 2 total Flt #1 (Qual): 2/6/2024
Flt #2: 3/6/2024
2 Passive Separation Rings SOW 2 total Flt #1 (Qual): 2/6/2024
Flt #2: 3/6/2024
3 Pin pullers, each with (2) Initiators for separation testing at GSFC
SOW 16 (32
(initiators)
(1) with each active ring delivery
4 Spare Clamps SOW 8 With Flt#2 delivery
5 Initiator port contamination covers SOW 1/initiator port
Delivered with each pin puller
6 Initiator RF/static control covers SOW 1/initiator Delivered with initiators
7 Tensioning device SOW 1 With Flt #1 delivery
8 Tension measurement and display device
SOW 1 With Flt #1 delivery
9 Safety devices to secure the
Separation System
SOW 3 Delivered with each separation system
10 Installation aids / tools SOW 1 With Flt #1 delivery
11 Coatings application equipment SOW 1 With Flt #1 delivery
12 Drill Template per MICD SOW 2
TBD
Note: templates must be identical
1 template to remain at RUAG
1 template delivered to CCRS
Table 2. Data Delivery Documentation and Schedule –Separation System
Item
Description Reference Category Format
13 1 SOW Compliance Matrix SOW 1.2 A With Proposal
14 Monthly Status Report SOW 2.2 I
Fourteen (14) calendar days following the month being reported.
15 Milestone List SOW 2.2 R With Proposal
16 Notifications SOW 2.3 R Seven (7) calendar days in advance of all mandatory hardware inspections, test activities, TIM’s, and deliveries.
17 Kickoff Meeting SOW 2.4.1 R
One (1) month after Award of
Contract
18 Design Conformance Review SOW 2.4.2 R
Four (4) months after Award of
Contract
19 Design Conformance Review
Presentation Package
SOW 2.4.2
I
Fourteen (14) calendar days before
DCR
20 Design Conformance Review Report SOW 2.4.2 R
Fourteen (14) calendar days after completion of DCR
21 Pre-Test Review SOW 2.4.3 R
Seven (7) days before start of testing on first Flight Unit
22 Pre-Test Review Presentation SOW 2.4.3 R Due at PTR
23 Flight Unit(s) Pre-Ship Review SOW 2.4.4 R
Seven (7) calendar days prior to delivery of each Flight Unit
24 Flight Unit(s) Data Delivery
Package(s)
SOW 2.4.4
A With each delivered Flight Unit
25 TIM SOW 2.4.5 R As negotiated
26 Training SOW 2.4.6 R No later than PSR for Flight Unit #1
27 Interface Control Document(s) SOW 3.1.1 A
Fourteen (14) calendar days before
DCR
28 Heritage Documentation SOW 3.1.2 R With Proposal
29 Drawing Package SOW 3.2 R
Fourteen (14) calendar days before
DCR
30 Computer Models SOW 3.3 I
Fourteen (14) calendar days before
DCR
31 Structural Analysis Report SOW 3.4 R
Fourteen (14) calendar days before
DCR
32 Mass Properties Analysis Report SOW 3.5 R
Fourteen (14) calendar days before
DCR
33 Separation Analysis Report SOW 3.6 R
Fourteen (14) calendar days before
DCR
34 Thermal Analysis Report SOW 3.7 R
Fourteen (14) calendar days before
DCR
35 Reliability Analysis Report SOW 3.8 R
Fourteen (14) calendar days before
DCR
36 FMEA Report SOW 3.9 R
Fourteen (14) calendar days before
DCR
37 Safety Analysis Report SOW 3.10 R
Fourteen (14) calendar days before
DCR
38 User/Instruction Manuals SOW 3.11 R No later than PSR for Flight Unit #1
39 Fabrication, Assembly, and
Inspection Flow Plan
SOW 4.1
R
Fourteen (14) calendar days before
DCR
40 Verification Plan (Including
Verification Matrix)
SOW 5.1
A
Fourteen (14) calendar days before
DCR
41 Individual Verification Test Plan(s)
(if needed)
SOW 5.1
A
Fourteen (14) calendar days before
DCR
42 Verification Test Procedure(s) SOW 5.2
R
Twenty-eight (28) calendar days before start of testing and as changes occur.
43 Verification Test Report(s) SOW 5.3 I Due at PSR
44 Quality Assurance Plan SOW 6.1.1 A Due at Kickoff Meeting
45 Anomaly/Failure Reports SOW 6.1.3
A
Seven (7) calendar days after
Contractor Failure Review Process determines disposition
46 Class I CM Changes SOW 6.1.4 A
Seven (7) calendar days after
Contractor CM review
47 Class II CM Changes SOW 6.1.4 R
Seven (7) calendar days after
Contractor CM review
48 Safety/Hazard Controls SOW 6.2 A Due 3 working days after Contractor disposition
49 Trended Parameter List SOW 6.3.1 R Seven (7) calendar days prior to PTR
50 Limited Life Items List SOW 6.3.2 A
Fourteen (14) calendar days before
DCR
51 Expired Shelf Life Waiver SOW 6.3.2 A
Fourteen (14) calendar days before
DCR
52 Alternate Workmanship Standards SOW 6.5.4 R
Fourteen (14) calendar days before
DCR
53 GIDEP Alert Disposition and
Preparation
SOW 6.5.6
R
Due 3 working days after Contractor disposition
54 Part Failure Reporting SOW 6.5.8 A 72 hrs of failure determination
55 Materials and Processes
Identification List
SOW 6.6.1
A
Fourteen (14) calendar days before
DCR
56 As-Built Materials List SOW 6.6.1 R Due at PSR
57 Materials Certificate of
Conformance
SOW 6.6.2 R With each delivered flight unit (part of Data Delivery Package)
58 Coatings Screening SOW 6.6.4 A Two (2) months after contract award
59 Contamination Control Plan SOW 6.7.1 R, A Due at Kickoff Meeting
Appendix A Abbreviations and Acronyms
AM AI&T Model
CCRS Capture, Containment and Return System
CDR Critical Design Review
CDRL Contract Data Requirements List
DILS Deliverable Items List and Schedule
EAR Export Administration Regulations
EDU Engineering Development Unit
EES Earth Entry System (EES Aeroshell + C-OS + CAM lid; system that separates for Earth return)
EIDP End Item Data Package
EGSE Electrical Ground Support Equipment
ETU Engineering Test Unit
KOM Kickoff Meeting
MAR Mission Assurance Requirements
MGSE Mechanical Ground Support Equipment
MIUL Materials Identification and Usage List
MRR Manufacturing Readiness Review
MSR Mars Sample Return (Campaign)
PDR Preliminary Design Review
PER Pre-Environmental Review
PFM Proto-Flight Model
PSR Pre-Ship Reviews
PT Prototype
SCV Secondary Containment Vessel
SEM Spin Eject Mechanism
SOW Statement of Work
TBD To Be Determined
TRR Test Readiness Review