Seminole Drive Reconstruction - Bid Documents Summary

This is a sealed bid package for a roadway reconstruction project issued by the Jackson County Board of County Commissioners in Florida, prepared by Alday-Howell Engineering, Inc. The project involves approximately 1,860 linear feet of roadway reconstruction on Seminole Drive between Indian Springs Road and Appalachee Trail, including subsoil excavation, optional base group 9, 429.5 tons of 1-1/2" structural asphalt, 286.4 tons of 1" friction asphalt, pavement markings, shoulder treatment, 1,200 linear feet of guardrail removal and replacement, and intersection improvements. Sealed bids must be received by 2:00 PM CDT on Thursday, November 19, 2026, at the Jackson County Purchasing Department, 2864 Madison Street, Marianna, Florida 32448, or electronically through www.centralbidding.com. Bidders may examine documents at the issuing office Monday through Thursday from 7:00 AM to 5:00 PM or Friday from 7:00 AM to 11:00 AM. The work must be substantially completed within 150 calendar days after the contract time commences and fully completed within 210 calendar days. Bidding documents are available free in PDF format or for $350.00 per printed set plus shipping costs.

Bids must be submitted on a unit price basis with a 5 percent bid bond payable to Jackson County. The successful bidder will be required to furnish a performance bond and labor and material payment bond, each in the amount of 100 percent of the contract price. Bids remain valid for 90 days after opening. Liquidated damages are assessed at $1,000 per day for failure to achieve substantial completion and $500 per day for failure to complete remaining work after substantial completion. Bidders must demonstrate qualifications within five days of the owner's request and submit subcontractor and supplier lists. The project requires compliance with Florida Department of Transportation standards, Florida Trench Safety Act provisions, prevailing wage requirements, and various certifications including equal opportunity employment, Section 3 provisions, debarment status, and drug-free workplace programs. Contractors must possess appropriate state licenses and underground utility and excavation contractor licenses. Jackson County reserves the right to reject any or all bids and award the contract to the lowest responsive, responsible bidder.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2627-07 - Seminole Drive Reconstruction Jackson County

Project documents obtained from www.CentralBidding.com

15-Oct-2026 04:38:00 PM

Powered by TCPDF (www.tcpdf.org) i

SEMINOLE DRIVE

RECONSTRUCTION

Prepared For:

2864 Madison St.

Marianna, FL 32448

District 1 – Dr. Willie Spires District 2 – Edward Crutchfield District 3 – Paul Donofro, Jr.

District 4 – Donnie Branch District 5 – Jamey Westbrook

Jim Dean, County Administrator

October 2026

Prepared By:

3017 Highway 71 North

Marianna, FL 32446

(850) 526-2040

Table of Contents

Division 0 – Bidding and Contract Requirements C-111 Advertisement

C-200 Instructions to Bidders

C-300 Bidder Experience and Data

C-320 Certification by Bidder Regarding Equal Opportunity Employment

C-330 Certification by Bidder Regarding Section 3 and Segregated Facilities

C-340 Certifications Regarding Labor Standards and Prevailing Wages

C-350 Public Entity Crimes Statement – Sworn Statement

C-360 Certification Regarding Debarment

C-380 Drug-Free Work Place

C-410 Bid Form

C-430 Bid Bond

C-510 Notice of Award

C-520 Agreement Between Owner and Contractor

C-550 Notice to Proceed

C-610 Performance Bond

C-615 Payment Bond

C-620 Application for Payment

C-625 Certificate of Substantial Completion

C-641 Certificate of Final Completion

C-700 Standard General Conditions

C-720 Federal Labor Standards Provisions

C-800 Supplementary Conditions

C-940 Work Change Directive

C-941 Change Order Form

Division 1 – General Requirements 01010 Project Requirements

01026 Application for Payment

01046 Special Provisions

01050 Field Engineering

01065 Permits and Fees

01100 Special Project Procedures

01200 Project Meetings

01300 Submittals

01310 Construction Schedules

01340 Shop Drawings, Working Drawings, and Samples

01410 Testing and Testing Laboratories

01700 Contract Close-out

01720 Project Record Documents

01742 Warranties and Bonds – Roadway

Division 2 – Local Agency Big 3 Specifications LAP120 Earthwork And Related Operations For LAP (Class - D).

LAP334 Asphalt Concrete For LAP (Off-System)

LAP344 Concrete For LAP (Off-System)

Unless otherwise indicated or modified on the plans or specifications all shall be in accordance with the current

Florida Department of Transportation FY 2026-27 Standard Plans for Road and Bridge Construction, supplements and special provisions there to.

Appendix A Seminole Drive Reconstruction - GEOTECHNICAL REPORT

Drawings

BID PLANS

EJCDC® C-111, Suggested Advertisement for Bids for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1

Jackson County 2627-07

Seminole Drive Reconstruction

ADVERTISEMENT FOR BIDS

SEALED BIDS for ITB NO: 2627- Seminole Drive Reconstruction will be received and accepted by the BOARD OF COUNTY COMMISSIONERS OF JACKSON COUNTY, FLORIDA at the Purchasing Department 2864 Madison Street, Marianna, FL 32448 up until 2:00 pm (CDT) Thursday, 11/19/2026. Sealed submittals must include one (1) original and (1) copy, along with an electronic copy on a USB flash drive. Bids shall be enclosed in a sealed envelope bearing the title of the work, the name of the bidder and the date for opening. It is the sole responsibility of the bidder to ensure that the bid is received on time. Bids will be publicly opened immediately following the deadline. Each bid shall be valid to Jackson County for a period of ninety (90) days after the bid opening.

Electronic Bids may be submitted at Central Bidding (www.centralbidding.com).

Special Accommodation: Any person requiring a special accommodation at a Pre-Bid Conference or Bid opening because of a disability should call the Purchasing Department at (850) 482-9633 at least five (5) workdays prior to the Pre-Bid Conference or Bid opening.

Bids will be opened and recorded at 2:00 PM CST (or shortly thereafter) on Thursday, November 19, 2026, at the Jackson County Board of County Commissioners Office at 2864 Madison Street, Marianna, FL 32448. Sealed bids can be received at the above address, or electronically via www.centralbidding.com.

Specifications and Contract Documents will be made accessible at www.centralbidding.com, or by contacting Issuing Office by email at eric@aldayhowell.com.

Central bidding has free registration to bid Jackson County Board of County Commissioners projects.

Go to www.centralbidding.com click on “Register Now!” Then click “Click Here” under Vendors:. Scroll to the bottom of the next page and click “Vendor Registration.” Read Terms and select “I have read…” button. Register your login. Then confirm registration through a confirmation email sent to the email registered.

This project will include roadway reconstruction of Seminole Drive in between Indian Springs Road and Appalachee Trail. The project consists of approximately 1860 LF roadway reconstruction, which includes subsoil excavation, optional base group 9, 429.5 tons of 1-1/2” structural asphalt, 286.4 tons of 1” friction asphalt, pavement markings, shoulder treatment, 1200 LF of guardrail removal and replacement and intersection improvements.

Jackson County reserves the right to waive any informalities or to reject any or all bids. Jackson County is an Equal Opportunity Employer. Each Bidder must deposit with his/her security in the amount, form and subject to the conditions provided in the Information for Bidders. Sureties used for obtaining bonds must appear as acceptable according to the Department of Treasury Circular 570.

Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Thursday between the hours of 7 a.m. to 5 p.m., as well as Friday between the hours of 7 a.m. to 11 a.m. Prospective Bidders may obtain copies of the Bidding Documents from the Issuing Office as described below.

EJCDC® C-111, Suggested Advertisement for Bids for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2

Bidding Documents may be obtained from the Issuing Office during the hours indicated above. Bidding Documents are available as portable document format (PDF) files e-mailed free of charge. Alternatively, printed Bidding Documents may be obtained from the Issuing Office either via in-person pick-up or via mail, upon Issuing Office’s receipt of payment for the Bidding Documents. The non-refundable cost of printed Bidding Documents is $_350.00__ per set, payable to “Alday-Howell Engineering, Inc.”, plus a non-refundable shipping charge. Upon Issuing Office’s receipt of payment, printed Bidding Documents will be sent via the prospective Bidder’s delivery method of choice; the shipping charge will depend on the shipping method chosen. The date that the Bidding Documents are transmitted by the Issuing Office will be considered the prospective Bidder’s date of receipt of the Bidding Documents. Partial sets of Bidding Documents will not be available from the Issuing Office. In addition to obtaining Bidding Documents by PDF or print, Bidding Documents can be obtained through Central Bidding www.centralbidding.com at no cost the bidder. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office.

The Issuing Office for the Bidding Documents is:

Alday-Howell Engineering, Inc.

3017 Highway 71 North Marianna, FL Ph. 850-526-2040 Contact: Eric Worrell, PE, (eric@aldayhowell.com)

Any questions in regard to the Bid Documents shall be emailed to Tyler Schaeffer schaeffert@jacksoncountyfl.gov . The deadline for questions is Monday, 11/2/2026.

A Performance Bond in the amount of 100% and a Labor and Material Payment Bond in the amount of 100% will be required of the successful Bidder.

A Bid Bond payable to Jackson County for an amount not less than five percent (5%) of the amount of the bid shall be filed with the proposal. The Bid Bond prepared on the forms specified and signed by a Bonding company authorized to do business in the State of Florida.

Bidders shall be contractors who are normally engaged in construction and shall be licensed as may be required under existing Federal, State, and County laws. Where licensing by examination by Jackson County is required, such licenses shall be obtained prior to bidding. Only bids from qualified Contractors will be considered.

Owner: Jackson County Board of County Commissioners

By: Jim Dean

Title: County Administrator

Date: October 15, 2026

+ + END OF ADVERTISEMENT FOR BIDS + +

EJCDC® C-200, Suggested Instructions to Bidders for Construction Contracts.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page i

SUGGESTED INSTRUCTIONS TO BIDDERS

TABLE OF CONTENTS

Page

Article 1 – Defined Terms

Article 2 – Copies of Bidding Documents

Article 3 – Qualifications of Bidders

Article 4 – Site and Other Areas; Existing Site Conditions; Examination of Site; Owner’s Safety Program;

Other Work at the Site

Article 5 – Bidder’s Representations

Article 6– Interpretations and Addenda

Article 7 – Bid Security

Article 8 – Contract Times

Article 9 – Liquidated Damages

Article 10 – Substitute and “Or-Equal” Items

Article 11 – Subcontractors, Suppliers, and Others

Article 12 – Preparation of Bid

Article 13 – Basis of Bid

Article 14 – Submittal of Bid

Article 15 – Modification and Withdrawal of Bid

Article 16 – Opening of Bids

Article 17 – Bids to Remain Subject to Acceptance

Article 18 – Evaluation of Bids and Award of Contract

Article 19 – Bonds and Insurance

Article 20 – Signing of Agreement

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 1

ARTICLE 1 – DEFINED TERMS

1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below:

A. Issuing Office – The office from which the Bidding Documents are to be issued.

ARTICLE 2 – COPIES OF BIDDING DOCUMENTS

2.01 Complete sets of the Bidding Documents may be obtained from the Issuing Office in the number and format stated in the advertisement or invitation to bid.

2.02 Complete sets of Bidding Documents shall be used in preparing Bids; neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete sets of Bidding Documents.

2.03 Owner and Engineer, in making copies of Bidding Documents available on the above terms, do so only for the purpose of obtaining Bids for the Work and do not authorize or confer a license for any other use.

ARTICLE 3 – QUALIFICATIONS OF BIDDERS

3.01 To demonstrate Bidder’s qualifications to perform the Work, after submitting its Bid and within [__5___] days of Owner’s request, Bidder shall submit (a) written evidence establishing its qualifications such as financial data, previous experience, and present commitments, and (b) the following additional information:

A. Evidence of Bidder’s authority to do business in the state where the Project is located.

B. Bidder’s state or other contractor license number, if applicable.

C. Subcontractor and Supplier qualification information; coordinate with provisions of Article 12 of these Instructions, “Subcontractors, Suppliers, and Others.”

D. Bidder’s underground utility and excavation contractor license number

E. Other required information regarding qualifications

3.02 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.

3.03 No requirement in this Article 3 to submit information will prejudice the right of Owner to seek additional pertinent information regarding Bidder’s qualifications.

3.04 Bidder is advised to carefully review those portions of the Bid Form requiring Bidder’s representations and certifications.

ARTICLE 4 – SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE; OWNER’S

SAFETY PROGRAM; OTHER WORK AT THE SITE

4.01 Site and Other Areas

A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by Owner for the use of the Contractor. Any additional lands required for temporary construction facilities, construction equipment, or

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 2 storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by Contractor.

4.02 Existing Site Conditions

A. Subsurface and Physical Conditions; Hazardous Environmental Conditions

1. The Supplementary Conditions identify:

a. those reports known to Owner of explorations and tests of subsurface conditions at or adjacent to the Site.

b. those drawings known to Owner of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities).

c. reports and drawings known to Owner relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.

d. Technical Data contained in such reports and drawings.

2. Owner will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions. Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.

3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.

B. Underground Facilities: Information and data shown or indicated in the Bidding Documents with respect to existing Underground Facilities at or contiguous to the Site are set forth in the Contract Documents and are based upon information and data furnished to Owner and Engineer by owners of such Underground Facilities, including Owner, or others.

C. Adequacy of Data: Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to subsurface conditions, other physical conditions, and Underground Facilities, and possible changes in the Bidding Documents due to differing or unanticipated subsurface or physical conditions appear in Paragraphs 5.03, 5.04, and 5.05 of the General Conditions. Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at the Site which was not shown or indicated in the Drawings or Specifications or identified in the Contract Documents to be within the scope of the Work, appear in Paragraph 5.06 of the General Conditions.

4.03 Site Visit and Testing by Bidders

A. Bidder shall conduct the required Site visit during normal working hours, and shall not disturb any ongoing operations at the Site.

B. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.

C. On request, and to the extent Owner has control over the Site, and schedule permitting, the Owner will provide Bidder access to the Site to conduct such additional examinations, Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 3 investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. Owner will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on Owner’s authority regarding the Site.

D. Bidder shall comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by Owner or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.

E. Bidder shall fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.

4.04 Owner’s Safety Program

A. Site visits and work at the Site may be governed by an Owner safety program. As the General Conditions indicate, if an Owner safety program exists, it will be noted in the Supplementary Conditions.

4.05 Other Work at the Site

A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which Owner is aware (if any) that is to be performed at the Site by Owner or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If Owner is party to a written contract for such other work, then on request, Owner will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.

ARTICLE 5 – BIDDER’S REPRESENTATIONS

5.01 It is the responsibility of each Bidder before submitting a Bid to:

A. examine and carefully study the Bidding Documents, and any data and reference items identified in the Bidding Documents;

B. visit the Site, conduct a thorough, alert visual examination of the Site and adjacent areas, and become familiar with and satisfy itself as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work;

C. become familiar with and satisfy itself as to all Laws and Regulations that may affect cost, progress, and performance of the Work;

D. consider the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Site-related reports and drawings identified in the Bidding Documents, with respect to the effect of such information, observations, and documents on (1) the cost, progress, and performance of the Work; (2) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and (3) Bidder’s safety precautions and programs;

E. agree, based on the information and observations referred to in the preceding paragraph, that at the time of submitting its Bid no further examinations, investigations, explorations, tests, studies, or data are necessary for the determination of its Bid for performance of the

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 4

Work at the price bid and within the times required, and in accordance with the other terms and conditions of the Bidding Documents;

F. become aware of the general nature of the work to be performed by Owner and others at the Site that relates to the Work as indicated in the Bidding Documents;

G. promptly give Engineer written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder discovers in the Bidding Documents and confirm that the written resolution thereof by Engineer is acceptable to Bidder;

H. determine that the Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for the performance and furnishing of the Work;

and

I. agree that the submission of a Bid will constitute an incontrovertible representation by Bidder that Bidder has complied with every requirement of this Article, that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.

ARTICLE 6 – INTERPRETATIONS AND ADDENDA

6.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all parties recorded as having received the Bidding Documents. Questions received less than seven days prior to the date for opening of Bids may not be answered. Only questions answered by Addenda will be binding.

Oral and other interpretations or clarifications will be without legal effect.

6.02 Addenda may be issued to clarify, correct, supplement, or change the Bidding Documents.

ARTICLE 7 – BID SECURITY

7.01 A Bid must be accompanied by Bid security made payable to Owner in an amount of [__5%___] percent of Bidder’s maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and

6.02 of the General Conditions.

7.02 The Bid security of the apparent Successful Bidder will be retained until Owner awards the contract to such Bidder, and such Bidder has executed the Contract Documents, furnished the required contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract Documents and furnish the required contract security within 15 days after the Notice of Award, Owner may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited. Such forfeiture shall be Owner’s exclusive remedy if Bidder defaults.

7.03 The Bid security of other Bidders that Owner believes to have a reasonable chance of receiving the award may be retained by Owner until the earlier of seven days after the Effective Date of the Contract or 61 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.

7.04 Bid security of other Bidders that Owner believes do not have a reasonable chance of receiving the award will be released within seven days after the Bid opening.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 5

ARTICLE 8 – CONTRACT TIMES

8.01 The number of days within which, or the dates by which, [Milestones are to be achieved and] the Work is to be substantially completed and ready for final payment are set forth in the Agreement.

ARTICLE 9 – LIQUIDATED DAMAGES

9.01 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.

ARTICLE 10 – SUBSTITUTE AND “OR-EQUAL” ITEMS

10.01 The Contract for the Work, as awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents, and those “or-equal” or substitute or materials and equipment subsequently approved by Engineer prior to the submittal of Bids and identified by Addendum. No item of material or equipment will be considered by Engineer as an “or-equal” or substitute unless written request for approval has been submitted by Bidder and has been received by Engineer at least 15 days prior to the date for receipt of Bids. Each such request shall comply with the requirements of Paragraphs 7.04 and 7.05 of the General Conditions. The burden of proof of the merit of the proposed item is upon Bidder. Engineer’s decision of approval or disapproval of a proposed item will be final. If Engineer approves any such proposed item, such approval will be set forth in an Addendum issued to all prospective Bidders. Bidders shall not rely upon approvals made in any other manner.

10.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that the Contractor will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.

ARTICLE 11 – SUBCONTRACTORS, SUPPLIERS, AND OTHERS

11.01 A Bidder shall be prepared to retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of the Work if required by the Bidding Documents (most commonly in the Specifications) to do so. If a prospective Bidder objects to retaining any such Subcontractor, Supplier, or other individual or entity, and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.

11.02 Subsequent to the submittal of the Bid, Owner may not require the Successful Bidder or Contractor to retain any Subcontractor, Supplier, or other individual or entity against which Contractor has reasonable objection.

11.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to Owner a list of the Subcontractors or Suppliers proposed for the following portions of the Work:

If requested by Owner, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If Owner or Engineer, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, Owner may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 6 substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and Owner may consider such price adjustment in evaluating Bids and making the Contract award.

11.04 If apparent Successful Bidder declines to make any such substitution, Owner may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which Owner or Engineer makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to Owner and Engineer subject to subsequent revocation of such acceptance as provided in Paragraph 7.06 of the General Conditions.

ARTICLE 12 – PREPARATION OF BID

12.01 The Bid Form is included with the Bidding Documents.

A. All blanks on the Bid Form shall be completed in ink and the Bid Form signed in ink.

Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.

B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”

12.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.

12.03 A Bid by a limited liability company shall be executed in the name of the firm by a member or other authorized person and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.

12.04 A Bid by an individual shall show the Bidder’s name and official address.

12.05 A Bid by a joint venture shall be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The official address of the joint venture shall be shown.

12.06 All names shall be printed in ink below the signatures.

12.07 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which shall be filled in on the Bid Form.

12.08 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.

12.09 The Bid shall contain evidence of Bidder’s authority and qualification to do business in the state where the Project is located, or Bidder shall covenant in writing to obtain such authority and qualification prior to award of the Contract and attach such covenant to the Bid. Bidder’s state contractor license number, if any, shall also be shown on the Bid Form.

ARTICLE 13 – BASIS OF BID

13.01 Lump Sum

A. Bidders shall submit a Bid on a lump sum basis as set forth in the Bid Form.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 7

13.02 Unit Price

A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.

B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which Owner or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices”; such total will be used by Owner for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.

C. Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum.

13.03 Allowances

A. For cash allowances the Bid price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of cash allowances, if any, named in the Contract Documents, in accordance with Paragraph 13.02.B of the General Conditions.

ARTICLE 14 – SUBMITTAL OF BID

14.01 With each copy of the Bidding Documents, a Bidder is furnished one separate unbound copy of the Bid Form, and, if required, the Bid Bond Form. The unbound copy of the Bid Form is to be completed and submitted with the Bid security and the other documents required to be submitted under the terms of Article 7 of the Bid Form.

14.02 A Bid shall be received no later than the date and time prescribed and at the place indicated in the advertisement or invitation to bid and shall be enclosed in a plainly marked package with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If a Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate package plainly marked on the outside with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to [_Jim Dean, County Administrator, Jackson County, 2864 Madison St., Marianna, FL 32446_].

14.03 Bids received after the date and time prescribed for the opening of bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.

ARTICLE 15 – MODIFICATION AND WITHDRAWAL OF BID

15.01 A Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to the date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.

15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 16.01 and submit a new Bid prior to the date and time for the opening of Bids.

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 8

15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with Owner and promptly thereafter demonstrates to the reasonable satisfaction of Owner that there was a material and substantial mistake in the preparation of its Bid, that Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, that Bidder will be disqualified from further bidding on the Work.

ARTICLE 16 – OPENING OF BIDS

16.01 Bids will be opened at the time and place indicated in the advertisement or invitation to bid and, unless obviously non-responsive, read aloud publicly. An abstract of the amounts of the base Bids and major alternates, if any, will be made available to Bidders after the opening of Bids.

ARTICLE 17 – BIDS TO REMAIN SUBJECT TO ACCEPTANCE

17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but Owner may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.

ARTICLE 18 – EVALUATION OF BIDS AND AWARD OF CONTRACT

18.01 Owner reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. Owner will reject the Bid of any Bidder that Owner finds, after reasonable inquiry and evaluation, to not be responsible. If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, then the Owner will reject the Bid as nonresponsive; provided that Owner also reserves the right to waive all minor informalities not involving price, time, or changes in the Work.

18.02 If Owner awards the contract for the Work, such award shall be to the responsible Bidder submitting the lowest responsive Bid.

18.03 Evaluation of Bids

A. In evaluating Bids, Owner will consider whether or not the Bids comply with the prescribed requirements, and such alternates, unit prices, and other data, as may be requested in the Bid Form or prior to the Notice of Award.

B. For the determination of the apparent low Bidder when unit price bids are submitted, Bids will be compared on the basis of the total of the products of the estimated quantity of each item and unit price Bid for that item, together with any lump sum items.

18.04 In evaluating whether a Bidder is responsible, Owner will consider the qualifications of the Bidder and may consider the qualifications and experience of Subcontractors and Suppliers proposed for those portions of the Work for which the identity of Subcontractors and Suppliers must be submitted as provided in the Bidding Documents.

18.05 Owner may conduct such investigations as Owner deems necessary to establish the responsibility, qualifications, and financial ability of Bidders and any proposed Subcontractors or Suppliers.

ARTICLE 19 – BONDS AND INSURANCE

19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth Owner’s requirements as to performance and payment bonds and insurance. When the

Copyright © 2013 National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers. All rights reserved. Page 9

Successful Bidder delivers the Agreement (executed by Successful Bidder) to Owner, it shall be accompanied by required bonds and insurance documentation.

ARTICLE 20 – SIGNING OF AGREEMENT

20.01 When Owner issues a Notice of Award to the Successful Bidder, it shall be accompanied by the unexecuted counterparts of the Agreement along with the other Contract Documents as identified in the Agreement. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement (and any bonds and insurance documentation required to be delivered by the Contract Documents) to Owner. Within ten days thereafter, Owner shall deliver one fully executed counterpart of the Agreement to Successful Bidder, together with printed and electronic copies of the Contract Documents as stated in Paragraph 2.02 of the General Conditions.

C-300, Bidder Experience and Data.

Bidder:_______________________

BIDDER EXPERIENCE & DATA

(Submit in triplicate)

Proposal of: ______________________________________ (hereinafter called "Bidder" or "Contractor"), organized and existing under the laws of the State of __________________ doing business as a partnership ( ), corporation ( ), individual ( ).

To: (hereinafter called "Owner").

Gentlemen:

The Bidder, in compliance with your invitation for bids for the construction of:

DESCRIPTION OF WORK:

This project will include roadway reconstruction of Seminole Drive in between Indian Springs Road and Appalachee Trail. The project consists of approximately 1860 LF roadway reconstruction, which includes subsoil excavation, optional base group 9, 429.5 tons of 1-1/2” structural asphalt, 286.4 tons of 1” friction asphalt, pavement markings, shoulder treatment, 1200 LF of guardrail removal and replacement and intersection improvements.

TRENCH EXCAVATION SAFETY CERTIFICATION

Pursuant to Florida Statutes 553.63, the Contractor or Subcontractor when performing trench excavation in excess of five feet (5') will comply with the following requirements:

(1) The Contract bid submitted by the contractor who will perform such excavation shall include:

a. A reference to the trench safety standards that will be in effect during the period of construction of the project.

b. Written assurance by the contractor performing the trench excavation that such contractor will comply with the applicable trench safety standards.

(2) A contractor perform trench excavation shall:

a. As a minimum, comply with the excavation safety standards which are applicable to a project.

b. Adhere to any special shoring requirements, if any, of the state or other political subdivisions which may be applicable to such a project.

c. If any geotechnical information is available from the owner, the contractor, or otherwise, the contractor performing trench excavation shall consider this information in the contractor's design of the project. This paragraph shall not require the owner to obtain geotechnical information.

(3) The separate item identifying the cost of compliance with trench safety standards shall be based on the linear feet of trench to be excavated. The separate item for special shoring requirements, if any, shall be based on the square feet of shoring used. Every separate item shall indicate the specific method of compliance as well as the cost of that method.

The contractor shall complete this form and submit it to the owner as a part of the bidding proposal package.

The undersigned, herein called "Bidder", has determined to his own complete satisfaction that all portions of the Florida Trench Safety Act (90-96, Laws of Florida) as the OSHA Excavation Safety Standards 29, CFR part 1926.650 Subpart P, will be fully complied with and executed property on this project.

Bidder acknowledges that included in the various items of the proposal and in the Total Bid Price are costs for complying with the Florida Trench Safety Act (90-96, Laws of Florida) effective October 1, 1990. The bidder further identifies the costs to be summarized below:

Trench Safety Units of Unit Unit Extended Measure Measure Cost Cost (Description) (Quantity/LS, SY)

A. __________________________ __________ ___________ ___________ ____________

B. __________________________ __________ ___________ ___________ ____________

C. __________________________ __________ ___________ ___________ ____________

D. __________________________ __________ ___________ ___________ ____________

Total $_______________________

In witness whereof, the Bidder has hereunto set his signature and affixed his seal this ______ day of ________________________, 20____.

Firm: ______________________________________

By: _______________________________________

Title: ______________________________________

(SEAL)

Sworn to and subscribed before me this ______ day of ___________________________, 20____.

Notary Public

STATEMENT OF EXPERIENCE

Bidder:______________________________________________________________________________

How Long in Business: ______________________________ At Current Address_______________________

Principals: ______________________________ Title ________________________________

______________________________ Title ________________________________

______________________________ Title ________________________________

Number of Personnel Currently Employed:__________________________

Number of Personnel Available for Project:__________________________

Gross Construction Revenue for Previous Year $_____________________

Type of Work _______________________________________________________________________ Normally Performed: _______________________________________________________________________

Bidder must list largest 10 projects completed or currently under construction within the past 18 months, performed either as general contractor or sub contractor. List projects in order of dollar value from greatest to least. Do not omit any projects. Failure to include project may result in determination of non-responsive bid.

1. Project Name:___________________________________________________________

__________________________________ Amount $________________________

Project Begin Date:___________________ Project Completion Date:____________

Engineer: __________________________ Telephone No.____________________

Owner: ____________________________ Telephone No.____________________

2. Project Name:___________________________________________________________

__________________________________ Amount $________________________

Project Begin Date:___________________ Project Completion Date:____________

3. Project Name:___________________________________________________________

4. Project Name:___________________________________________________________

Project Begin Date:___________________ Project Completion Date:____________

5. Project Name:___________________________________________________________

Project Begin Date:___________________ Project Completion Date:____________

6. Project Name:___________________________________________________________

Project Begin Date:___________________ Project Completion Date:____________

7. Project Name:___________________________________________________________

__________________________________ Amount $________________________

Project Begin Date:___________________ Project Completion Date:____________

8. Project Name:___________________________________________________________

9. Project Name:___________________________________________________________

Project Begin Date:___________________ Project Completion Date:____________

10. Project Name:___________________________________________________________

Project Begin Date:___________________ Project Completion Date:____________

SUBCONTRACTOR LISTING

The Bidder has fully investigated each subcontractor listed and has in his files evidence that each subcontractor fully complies with the requirements of these specifications, has engaged successfully in his line of work for a reasonable period of time, that he maintains a fully equipped organization capable, technically and financially, of performing the work required, and that he made similar installations in a satisfactory manner.

Name of Subcontractor Description of Work

EQUIPMENT AND MATERIAL LISTING

The Bidder will furnish the following items of equipment and materials:

Name of Manufacturer Description of Material and Equipment

C-320, Certification by Bidder Regarding Equal Opportunity Employment.

CERTIFICATION BY BIDDER REGARDING EQUAL OPPORTUNITY EMPLOYMENT

This certification is required pursuant to Executive Order 11246 (30 F.R. 12319-25). The implementing rules and regulations provide that any bidder or prospective contractor, or any of their proposed subcontractors, shall state as an initial part of the bid or negotiations of the contract whether it has participated in any previous contract or subcontract subject to the equal opportunity clause; and if so, whether it has filed all compliance reports due under applicable instructions.

Where the certification indicates that the bidder has not filed a compliance report due under applicable instructions, such bidder shall be required to submit a compliance report within seven calendar days after bid opening. No contract shall be awarded unless such report is submitted.

NAME AND ADDRESS OF BIDDER (include ZIP Code):

1. Bidder has participated in a previous contract or subcontract subject to the Equal Opportunity Clause.

Yes ( ) No ( )

2. Compliance reports were required to be filed in connection with such contract or subcontract.

3. Bidder has filed all compliance reports due under applicable instructions, including SF 100.

4. Have you ever been or are you being considered for sanction due to violation of Executive Order

112246, as amended?

NAME AND TITLE OF SIGNER (Please Type):

Name Title

(Signature) (Date)

C-330, Certifications by Bidder Regarding Section 3 and Segregated Facilities.

CERTIFICATION OF BIDDER REGARDING SECTION 3

AND SEGREGATED FACILITIES

Seminole Drive Reconstruction

Name of Prime Contractor:

The undersigned hereby certifies that:

(a) Section 3 provisions are included in the Contract.

(b) A written Section 3 plan was prepared and submitted as part of the bid proceedings (if bid equals or exceeds $10,000). See page 00330-2.

(c) No segregated facilities will be maintained.

Print Name and Title of Signer:

Print Name Print Title

Signature Date

CONTRACTOR

Section 3 Plan Format agrees to implement the following specific affirmative action steps directed at increasing the utilization of lower income residents and businesses within Jackson County, Florida.

A. To ascertain from the locality’s CDBG program official the exact boundaries of the Section 3 covered project area and where advantageous, seek the assistance of local officials in preparing and implementing the affirmative action plan.

B. To attempt to recruit from within the city the necessary number of lower income residents through: Local advertising media, signs placed at the proposed site for the project, and community organizations and public or private institutions operating within or serving the project area such as Service Employment and Redevelopment (SER), Opportunities Industrialization Center (OIC), Urban League, Concentrated Employment Program, Hometown Plan or the U.S.

Employment Service.

C. To maintain a list of all lower income residents who have applied either on their own or on referral from any source, and to employ such persons, if otherwise eligible and if a vacancy exists.

*D. To insert this Section 3 plan in all bid documents, and to require all bidders on subcontracts to submit a Section 3 affirmative action plan including utilization goals and the specific steps planned to accomplish these goals.

*E. To insure this Section 3 plan in all bid documents, and to require all bidders on subcontracts to submit a Section 3 affirmative action plan including utilization goals and the specific steps planned to accomplish these goals.

F. To formally contact unions, subcontractors, and trade associations to secure their cooperation for this program.

G. To insure that all appropriate project area business concerns are notified of pending subcontractual opportunities.

H. To maintain records, including copies of correspondence, memoranda, etc., which document that all of the above affirmative action steps have been taken.

I. To appoint or recruit an executive official of the company or agency as Equal Opportunity Officer to coordinate the implementation of this Section 3 plan.

J. To list on Table A, information related to subcontracts to be awarded.

K. To list on Table B, all projected workforce needs for all phases of this project by occupation, trade, skill level, and number of positions.

* Loans, grants, contracts, and subsidies for less than $10,000 will be exempt.

As officers and representatives of_____________________________________________.

(Name of Contractor)

We, the undersigned, have read and fully agree to this Affirmative Action Plan, and become a party to the full implementation of this program.

Signature

Title Date

Signature

Title Date

TABLE A

PROPOSED SUBCONTRACTORS BREAKDOWN

FOR THE PERIOD COVERING , 20 THROUGH ,

(DURATION OF THE CDBG-ASSISTED PROJECT)

COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4

COLUMN 5

TYPE OF CONTRACT TOTAL NUMBER TOTAL APPROXIMATE ESTIMATED NUMBER ESTIMATED

(BUSINESS OR PRO- OF CONTRACTS DOLLAR AMOUNT OF CONTRACTS DOLLAR AMOUNT

FESSION)

AREA BUSINESSES* TO PROJECT AREA

* The Project Area is coextensive with or included within Jackson County’s boundaries.

Company

Project Name Project Number

EEO Officer (Signature) Date

ESTIMATED PROJECT WORKFORCE BREAKDOWN

COLUMN 1 COLUMN 2 COLUMN 3 COLUMN 4 COLUMN 5

JOB CATEGORY TOTAL ESTIMATE

POSITIONS

NO. POSTITIONS

CURRENTLY

OCCUPIED BY

PERMANENT

EMPLOYEES

NO. POSITIONS NOT

CURRENTLY

OCCUPIED

NO. POSITIONS TO BE

FILLED WITH L.I.P.A.R.

OFFICERS/

SUPERVISORS

PROFESSIONALS

TECHNICIANS

HOUSING SALES/

RENTAL/MANGMT

OFFICE CLERICAL

SERVICE WORKER

OTHER

TRADE:

JOURNEYMEN

HELPERS

APPRENTICES

MAXIMUM NO.

TRAINEES

OTHERS

*Lowe…