AVR maintenance solicitation Solicitation No. SEG30016Q0033
United States Embassy Cairo, Egypt Page 1 of 87
United States Embassy Cairo
Date: February 21 st , 2016
To: Prospective Offerors
Subject: Solicitation number SEG30016Q0033, Enclosed is a Request for Proposals (RFP) for Automatic Voltage Regulator
Preventive Maintenance. If you would like to submit a proposal, follow the instructions in Section L of the solicitation, complete the required portions of the attached document, and submit it to the address shown on the Standard Form 1442 that follows this letter.
The U.S. Government intends to award a contract to the responsible company submitting an acceptable offer at the lowest price. We intend to award a contract based on initial proposals, without holding discussions, although we may hold discussions with companies in the competitive range if there is a need to do so.
A site visit will be held on March 2 nd
, 2016 at 10:30 am. In order to attend the pre-proposal conference and the site visit for the this solicitation, you are kindly requested to provide the name and Egyptian ID number for each of your representatives that will attend maximum by (two days before the site visit). Please e-mail this information to cairocontracts@state.gov to prepare for your access to the Embassy premises.”
Proposals are due by March 23 rd
, 2016 at 2:00pm local time.
Sincerely, Contracting Officer
Richard Johnson
Enclosure mailto:cairocontracts@state.gov
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30
1. REQUISITION NUMBER
PR5093268 Page 1 of 2
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
5. SOLICITATION NUMBER
SEG30016Q0033
6. SOLICITATION ISSUE DATE
02/21/2016
7. FOR SOLICITATION
INFORMATION CALL
a. NAME
Yvette Abdelmessih
b. TELEPHONE NUMBER
+20 2797 3300
8. OFFER DUE DATE/LOCAL TIME
9. ISSUED BY CODE
EG300 10. THIS ACQUISITION IS
AMERICAN EMBASSY CAIRO
US EMBASSY CAIRO 8 KAMAL EL DIN SALAH, ATTN:
PROCUREMENT/CONTRACTING OFFICE
CAIRO 11519
EGY PT
_ UNRESTRICTED
_ SET ASIDE: % FOR
_ SMALL BUSINESS _ EMERGING SMALL
_ HUBZONE SMALL BUSINESS SMALL BUSINESS _ 8(A)
_ SERVICE-DISABLED VETERAN OWNED
NAICS:
SIZE STD:
11. DELIVERY FOR FOB 12. DISCOUNT
TERMS
13a. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700) DESTINATION UNLESS BLOCK IS MAR KED
_ SEE SCHEDULE
13b. RATING
14. METHOD OF SOLICITATION
_ RFQ _ IFB _ RFP
15. DELIVER TO: Code 16. Administered by:
AMERICAN EMBASSY CAIRO
US EMBASSY CAIRO 8 KAMAL EL DIN
SALAH, ATTN: SPM RECEIV ING OFFICE
CAIRO 11519
EGY PT
AMERICAN EMBASSY CAIRO
US EMBASSY CAIRO 8 KAMAL EL DIN SALAH, ATTN:
PROCUREMENT/CONTRACTING OFFICE
CAIRO 11519
EGY PT
117a. CONTRACTOR/OFFEROR CODE 0 FACILITY CODE
NOVENDOR
UNITED STATES
TELEPHONE NO:
18a. PAYMENT WILL BE MADE BY
AMERICAN EMBASSY CAIRO
US EMBASSY CAIRO 8 KAMAL EL DIN SALAH, ATTN: FINANCIAL
MANAGEMENT OFFICE - DBO
CAIRO 11519
EGY PT
17b CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS
BLOCK BELOW IS CHECKED _ SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
- SEE LINE ITEMS -
(Use Reverse and/or Attach Additional Sheets as N ecessary)
25. ACCOUNTING AND APPROPRIAT ION DATA
26. TOTAL AWARD AMOUNT (For Govt. Use Onl y)
_ 27a.SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA _ ARE _ ARE NOT ATTACHED.
_ 27b.CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212- 4. FAR 52.212-5 IS ATTACHED. ADDENDA _ ARE _ ARE NOT ATTACHED.
_ 28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER
ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
ADDITIONAL SHEETS SUBJECT TO THE TER MS AND CONDITIONS SPECIFIED
HEREIN.
_ 29. AWARD OF CONTRACT: REF. OFFER DATED . YOUR
OFFER ON SOLICITATION (BLOCK 5), INCLUDING ANY
ADDITIONS OR CHANGES WHICH ARE SET FORTH HEREIN,
IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT)
30c. DATE SIGNED
31b. NAME OF CONTRACTING OFFICER (Type or Print)
31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1449 (REV3/2005)
PREVIOUS EDITION IS NOT USABLE Computer Generated Prescribed by GSA - FAR (48 CFR) 53.212
11. SCHEDULE
(Include applicable Federal, State and local taxes)
ITEM NO.
(a)
SUPPLIES/SERVICES
(b)
QUANTITY
(c)
UNIT
(d)
UNIT PRICE
(e)
AMOUNT
(f)
1 Automatic vol tage regulator and voltage stablizer preventive maintenance. Contractor shall provide scheduled maintenance services for the Automatic vol tage regulator and voltage s tabilizer, per the included Statement of Work.
Funding Information:
Total : 0.00
--------------- 0.00
1.00 EA 0.00 0.00
United States Embassy Cairo, Egypt Page 4 of 87
SECTION B
-SUPPLIES OR SERVICES AND PRICES/COSTS
B.1 SCOPE OF SERVICES
The Contractor shall provide personnel, supplies and equipment, as identified in this solicitation all maintenance services at United States Embassy Cairo as described in Section C, DESCRIPTION/SPECIFICATIONS/WORK STATEMENT, of this contract and exhibits attached in Section J.
B.2 TYPE OF CONTRACT
This is a fixed price type contract for scheduled maintenance services as defined in Exhibit A the Comprehensive Maintenance Plan (CMP). The fixed price will include all work, including furnishing all labor, materials, equipment and services, overhead
(including cost of Workers’ Compensation and War-Hazard Insurance, which shall not be a direct reimbursement) and profit, unless otherwise specified.
B.3 PRICES/COSTS
B.3.1 Value Added Tax
VALUE ADDED TAX (VAT). The Government will not reimburse the Contractor for
VAT under this contract. The Contractor shall not include a line for VAT on Invoices as the United States Embassy has a tax exemption certificate with the host government.
B.3.2 All prices shall be submitted in Egyptian Pounds
B.3.3 Scheduled Maintenance Services
(a) In consideration of satisfactory performance of all the scheduled services required under this contract, the Contractor shall be paid a fixed-price per quarter for
Scheduled Maintenance Services. No additional sums will be payable on account of any escalation in the cost of materials, equipment or labor (unless mandated by local law), or because of the Contractor 's failure to properly estimate or accurately predict the cost or difficulty of achieving the results required by the maintenance plan is. Nor will the contract price be adjusted on account of fluctuations in the currency exchange rate.
B. 3.4 Emergency Services
(a) Emergency services shall be issued and priced at the same rates as unscheduled services.
B.3.5 Ordering
United States Embassy Cairo, Egypt Page 5 of 87
Ordering - (a) All supplies or services to be furnished under this contract. Orders may be issued from the date of the Contracting Officer's signature until the end of the "Period of
Performance" applicable to this contract.
B.4 BASE PERIOD PRICES
B.4.1. Scheduled Maintenance Services. The fixed-price for the first year
(starting on the date stated in the Notice to Proceed and continuing for a period of 12 months) for scheduled maintenance services as defined in C.1.3.1. is:
Per month _________ x 12 = ______________per year
B.5 FIRST OPTION YEAR PRICES
B.5.1. Scheduled Maintenance Services. The fixed-price for the first option year
(starting on the date stated in the Notice to Proceed for the first option year and continuing for a period of 12 months) for scheduled maintenance services as defined in
C.1.3.1. is:
B.6 SECOND OPTION YEAR PRICES
B.6.1. Scheduled Maintenance Services. The fixed-price for the second option year (starting on the date stated in the Notice to Proceed for the second option year and
B.7 THIRD OPTION YEAR PRICES
B.7.1. Scheduled Maintenance Services. The fixed-price for the third option year
(starting on the date stated in the Notice to Proceed for the third option year and
B.8 FOURTH OPTION YEAR PRICES
B.8.1. Scheduled Maintenance Services. The fixed-price for the fourth option year (starting on the date stated in the Notice to Proceed for the fourth option year and
United States Embassy Cairo, Egypt Page 6 of 87
Total Price for base year plus four option years: __________________
The remainder of this page is intentionally blank.
United States Embassy Cairo, Egypt Page 7 of 87
SECTION C
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1. INTRODUCTION
C.1.1 General.
The United States Embassy Cairo requires a maintenance service Contractor to maintain the following systems in a safe, reliable and efficient operating condition. Please see equipment list included in Exhibit A for a more detailed description.
The Contractor shall furnish managerial, administrative and direct operational personnel to accomplish all work as required in this contract. The Contractor shall designate an English speaking representative who shall supervise the Contractor's workforce and be the Contractor's liaison with the United States Embassy in Cairo.
The Contractor's employees shall be on-site only for contractual duties and not for any other business or purposes. Contractor employees shall have access to the equipment and equipment areas and will be escorted by the United States Embassy personnel.
C.1.2 Personnel. The Contractor shall be responsible for providing qualified technicians (with at least one of each trade at the journey-man level or equivalent) with relevant experience of more than 3 years to meet the minimum requirements established below to perform maintenance services in accordance with the maintenance plan shown in Exhibit A. Helper positions do not need to meet this 3 year minimum requirement.
Personnel shall meet the minimum criteria for labor categories shown in Section B.4.2 as identified in Exhibit B.
C.1.3 Definitions.
"Chancery" means the building of the United States Embassy used for official activities or means the official residence of the ambassador.
"CMP" is a comprehensive maintenance plan
"Daily" means 5 days per week, on each non-holiday workday.
"Emergency Services" are task orders which require immediate attention. May involve working other than normal work day or hour as defined in F.8. Contractor required to respond to call within 8 hours and take action to minimize emergency situation.
"EOB" means Embassy Office Building.
"Execution Plan" is submitted by the Contractor and defines the methods and disciplines used to carry out the maintenance plan as provided in Exhibit A.
United States Embassy Cairo, Egypt Page 8 of 87
"General Instructions" mean those instructions, directives and guidelines that apply to all employee maintenance personnel.
"NOB" means New Office Building
"PM" means Preventive Maintenance
“COR” Contracting Officer Representative
"Routine Maintenance and Repair" includes the preservation in a sound state of real property and might include day-to-day electrical work, and the purchase of maintenance stock.
"Scheduled Maintenance Services" includes all routine maintenance functions identified in the Exhibit A, Comprehensive Maintenance Plan, for Post systems and equipment.
C.1.3.1 The Contractor shall provide an Executive Plan to carry out the maintenance as shown in Exhibit A. These duties and responsibilities described in
Subsection C.1.5. The Contractor shall provide a draft of the Executive Plan to the
COR for review 30 days after contract award.
C.1.4 Location, Service, Kind of Personnel: A sample listing of locations, kinds of services, and personnel by category, is provided in Exhibit A.
C.1.5 Duties and Responsibilities.
C.1.5.1 Outline of Maintenance Services to be Performed: (ALL
PROPERTIES)
Services to be performed by these engineers shall include those outlined below.
Damage or situations requiring major or specialized remedial services shall promptly be brought to the attention of the COR, and efforts shall be made to minimize such trouble or damage until proper corrective action can be taken. Major and specialized repairs shall be carried out by the Government, independent of this contract. Services to be performed as part of scheduled maintenance to include:
The detailed work requirements and instructions including emergency works shall be provided by the COR to the Contractor's Liaison who shall supervise, schedule, and manage the performance of the assignments.
All personnel assigned by the Contractor for the performance of the respective services shall be regular employees of the Contractor, and shall be supervised by the
Contractor. There shall be no employer-employee relationship between the
Government and the personnel. Subcontractors may only be employed with the express written consent of the Contracting Officer.
United States Embassy Cairo, Egypt Page 9 of 87
C.2 SUPERINTENDENCE BY CONTRACTOR:
The entire operation of the contracted services shall be superintended by the Contractor's bilingual (English/Arabic) liaison, who shall maintain a close contact with the
Contracting Officer and the COR in order to coordinate the performance of the contracted services with the needs of the Government.
The liaison, (or his/her qualified assistant), shall be on duty throughout the normal operating hours of the United States Embassy in Cairo. S/he shall also superintend the performance of the contracted services on Fridays, Saturdays, and holidays.
C.3 QUALITY ASSURANCE
The Contractor shall institute an appropriate inspection system including checklists of duties to be carried out, ensuring these duties are carried out by the supervisory staff and senior employees, and carrying out weekly inspections to determine whether the various services are being performed according to the contract requirements. Copies of the weekly inspection reports shall be provided to the COR.
Any shortcomings and/or substandard conditions noted in such inspections shall be promptly corrected and improved; any conditions beyond the responsibility of the
Contractor shall be brought to the attention of the Contracting Officer or COR, for disposition.
C.3.1 Monthly Report: The Contractor shall render a monthly maintenance report, summing up observations resulting from the inspections, difficulties or irregularities encountered, measures taken, improved conditions, repairs or services needed (those beyond the Contractor's responsibilities), special work done, recommendations, and other matters related to operation and maintenance of the buildings and facilities covered by this contract. The monthly report shall be provided in a format similar to the one in Exhibit D, signed by an authorized representative of the
Contractor, and shall be submitted to the COR.
C.3.2 Inspection by Government: The services being performed hereunder and the supplies furnished therefor will be inspected from time to time by the COR, or his/her authorized representatives, to determine that all work is being performed in a satisfactory manner, and that all supplies are of acceptable quality and standards.
The Contractor shall be responsible for any countermeasures or corrective action, within the scope of this contract, which may be required by the COR as a result of such inspection.
United States Embassy Cairo, Egypt Page 10 of 87
SECTION D
PACKAGING AND MARKING
D.1 MATERIALS DELIVERED TO THE SITE SHALL BE MARKED AS
FOLLOWS:
N/A
United States Embassy Cairo, Egypt Page 11 of 87
SECTION E
INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates the following clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address: http://www.acquisition.gov/far/ or http://farsite.hill.af.mil/vffara.htm
These addresses are subject to change. If the Federal Acquisition Regulation (FAR) is not available at the locations indicated above, use the Department of State Acquisition website at http://www.statebuy.state.gov/ to see the links to the FAR. You may also use an internet “search engine” (for example Google, Yahoo, Excite) to obtain the latest location of the most current FAR.
FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)
CLAUSE TITLE AND DATE
52.246-4 INSPECTION OF SERVICES – FIXED PRICE (AUG 1996)
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
E.2 QUALITY ASSURANCE AND SURVEILLANCE PLAN (QASP)
This plan is designed to provide an effective surveillance method to promote effective
Contractor performance. The QASP provides a method for the Contracting Officer's
Representative (COR) to monitor Contractor performance, advise the Contractor of unsatisfactory performance, and notify the Contracting Officer of continued unsatisfactory performance. The Contractor, not the Government, is responsible for management and quality control to meet the terms of the contract. The role of the
Government is to conduct quality assurance to ensure that contract standards are achieved.
Performance Objective
PWS
Paragraph Performance Threshold
Services
Performs all maintenance services set forth in the Performance Work Statement (PWS) thru
All required services are performed and no more than one
(1) customer complaint is received per month http://www.acquisition.gov/far/ http://farsite.hill.af.mil/vffara.htm http://www.statebuy.state.gov/
United States Embassy Cairo, Egypt Page 12 of 87
E.2.1 Surveillance. The COR will receive and document all complaints from
Government personnel regarding the services provided. If appropriate, the COR will send the complaints to the Contractor for corrective action.
E.2.2 Standard. The performance standard is that the Government receives no more than one (1) customer complaint per month. The COR shall notify the Contracting
Officer of the complaints so that the Contracting Officer may take appropriate action to enforce the inspection clause (FAR 52.246-4, Inspection of Services – Fixed Price (AUG
1996)), if any of the services exceed the standard.
E.2.3 Procedures
(a) If any Government personnel observe unacceptable services, either incomplete work or required services not being performed they should immediately contact the COR.
(b) The COR will complete appropriate documentation to record the complaint.
(c) If the COR determines the complaint is invalid, the COR will advise the complainant. The COR will retain the annotated copy of the written complaint for his/her files.
(d) If the COR determines the complaint is valid, the COR will inform the
Contractor and give the Contractor additional time to correct the defect, if additional time is needed. The COR shall determine how much time is reasonable.
(e) The COR shall, as a minimum, orally notify the Contractor of any valid complaints.
(f) If the Contractor disagrees with the complaint after investigation of the site and challenges the validity of the complaint, the Contractor will notify the COR. The
COR will review the matter to determine the validity of the complaint.
(g) The COR will consider complaints as resolved unless notified otherwise by the complainant.
(h) Repeat customer complaints are not permitted for any services. If a repeat customer complaint is received for the same deficiency during the service period, the
COR will contact the Contracting Officer for appropriate action under the Inspection clause.
United States Embassy Cairo, Egypt Page 13 of 87
SECTION F
DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
website at http://www.statebuy.state.gov/ to see the links to the FAR. You may also use
FEDERAL ACQUISITION REGULATION (48 CFR CH. 1)
52.242-15 STOP-WORK ORDER (AUG 1989)
52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)
52.242-14 SUSPENSION OF WORK (APR 1984)
F.2 PERIOD OF PERFORMANCE
The contract shall be effective on the date of the Contracting Officer's signature, and shall remain in effect until a year after with four one year option years. Individual delivery orders for unscheduled work will identify completion times for specific unscheduled/urgent tasks.
http://www.acquisition.gov/far/
United States Embassy Cairo, Egypt Page 14 of 87
F.3 DELIVERABLES
The following items shall be delivered under this contract:
Description Quantity Delivery Date
Deliver
To
C.1.3.1 Execution Plan 1 30 days after award COR
C.3. Quality Assurance Plan 1 10 days after award COR
C.3. Inspection Report 1
7 days after end of weekly period COR
C.3.1. Building Maintenance
Report 1 5th day of each month COR
H.1.2.3. Bios on Personnel 1 10 days after award COR
H.3. Bonds 1 10 days after award CO
H.4. Insurance/Licenses & Permits 1
30 days after Notice of
Award CO
H.10.1 Safety Plan 1 30 days after contract award COR
H.7.1 Waste Disposal Report 1 Last day of each month COR
F.4 CONTRACTOR'S SUBMISSION OF MAINTENANCE SCHEDULE AND
MINOR REPAIRS UNDER UNSCHEDULED WORK ORDERS
The time for submission of the schedules and General Instructions referenced in
Section I, 52.236-15, "Schedules for Construction Contracts", paragraph (a), is hereby modified to reflect the due date for submission as ten (10) calendar days after receipt of an executed contract". The Contractor shall weekly revise such schedules (1) to account for the actual progress of the work, (2) to reflect approved adjustments in the performance schedule, and (3) as required by the Contracting Officer to achieve coordination with work by the Government and any separate contractors employed by the
Government. The Contractor shall submit a schedule which sequences work so as to minimize disruption at the jobsite.
All deliverables shall be in the English language, unless otherwise provided hereunder, and any system of dimensions (i.e., English or metric) shown shall be consistent with that used in the contract. No extension of time shall be allowed on account of a delay by the
Government in approving such deliverables if the Contractor has failed to act promptly and responsively in submitting its deliverables. Each deliverable shall be identified as required by the contract.
F.5 ACCEPTANCE OF SCHEDULE
When the Government has accepted any time schedule, it shall be binding upon the Contractor. The completion date is fixed and may be extended only by a written modification to the delivery order signed by the Contracting Officer. Acceptance or approval of any schedule or revision thereof by the Government shall not (1) extend the completion date or obligate the Government to do so, (2) constitute acceptance or approval of any delay, nor (3) excuse the Contractor from or relieve the Contractor of its
United States Embassy Cairo, Egypt Page 15 of 87 obligation to maintain the progress of the work and achieve final completion by the established completion date.
F.6 NOTICE OF DELAY
In the event the Contractor receives a notice of any change in the work, or if any other conditions arise which are likely to cause or are actually causing delays which the
Contractor believes may result in completion of the project after the completion date, the
Contractor shall notify the Contracting Officer of the effect, if any, of such change or other conditions upon the approved schedule, and shall state in what respects, if any, the relevant schedule or the completion date should be revised. Such notice shall be given promptly, and not more than ten (10) days following the first occurrence of event giving rise to the delay or prospective delay. Revisions to the approved time schedule shall only be made with the approval of the Contracting Officer.
F.7 NOTICE TO PROCEED
(a) Following receipt from the Contractor of any bonds or evidence of insurance within the time specified in Section H of this contract, and following acceptance of these documents by the Contracting Officer, the Contracting Officer will provide to the
Contractor a Notice to Proceed. The Contractor must then prosecute the work required hereunder.
(b) It is possible that the Contracting Officer may elect to issue the Notice to
Proceed prior to receipt and acceptance of any bonds or evidence of insurance required hereunder. Issuance of a Notice to Proceed by the Government before receipt of the required bonds or insurance certificates or policies shall not be a waiver of the requirement to furnish these documents.
F.8 WORKING HOURS
All work shall be performed during Sunday through Thursday from 08:30 to
16:00 except for the holidays identified below in Section I.15. Other hours, initiated by the Contractor, may be approved by the Contracting Officer's Representative. Notice must be given 24 hours in advance to COR who will consider any deviation from the hours identified above. Changes in work hours will not be cause for a price increase.
F.9 EXCUSABLE DELAYS
The Contractor will be allowed time, not money, for excusable delays as defined in FAR 52.249-10, Default. Examples of such cases include (l) acts of God or of the public enemy, (2) acts of the United States Government in either its sovereign or contractual capacity, (3) acts of the government of the host country in its sovereign capacity, (4) acts of another contractor in the performance of a contract with the
Government, (5)fires, (6) floods, (7) epidemics, (8) quarantine restrictions, (9) strikes, (l0) freight embargoes, (11) delays in delivery of Government furnished equipment and
United States Embassy Cairo, Egypt Page 16 of 87
(12) unusually severe weather. In each instance, the failure to perform must be beyond the control and without the fault or negligence of the Contractor, and the failure to perform furthermore (1) must be one that the Contractor could not have reasonably anticipated and taken adequate measures to protect against, (2) cannot be overcome by reasonable efforts to reschedule the work, and (3) directly and materially affects the date of final completion of the project.
F.10 POST AWARD CONFERENCE
A post award conference will be held 10 days after contract award at the United
States Embassy premises to discuss the schedule, submittals, notice to proceed, mobilization and other important issues that affect the progress under this contract.
United States Embassy Cairo, Egypt Page 17 of 87
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 652.242-70 CONTRACTING OFFICER'S REPRESENTATIVE (COR)
(AUG 1999)
(a) The Contracting Officer may designate in writing one or more Government employees, by name or position title, to take action for the Contracting Officer under this contract. Each designee shall be identified as a Contracting Officer’s Representative
(COR). Such designation(s) shall specify the scope and limitations of the authority so delegated; provided, that the designee shall not change the terms or conditions of the contract, unless the COR is a warranted Contracting Officer and this authority is delegated in the designation.
(b) The COR for this contract is Quality Assurance Engineer
G.1.1 Duties
The COR is responsible for inspection and acceptance of services. These duties include review of Contractor invoices, including the supporting documentation required by the contract. The COR may provide technical advice, substantive guidance, inspections, invoice approval, and other purposes as deemed necessary under the contract.
G.2 PAYMENT
G.2.1 General. The Contractor's attention is directed to Section I, 52.232-1, "Payments", and 52.232-5, "Payments Under Fixed-Price Construction Contracts". The following subsections elaborate upon the information contained therein. All invoices should contain copies of the signed work orders completed that quarter and status information on those not completed. Completed work orders shall bear the signature of the Contractor’s quality control personnel. Work orders shall consist of all preventive maintenance orders as well as unscheduled and emergency orders issued since the submittal of the last invoice.
Invoices shall be submitted in an original to the Designated Billing Office (DBO) at the following address:
United States Embassy Cairo
8 Kamal El Din Salah
Garden City, Cairo
Attn.: Financial Management Center/DBO
CairoDBO@state.gov (Preferred)
G.2.2 Detail of Payment Requests
Each application for payment, which shall be made no more frequently than quarterly, unless otherwise provided herein, shall cover the fixed price preventive mailto:CairoDBO@state.gov
United States Embassy Cairo, Egypt Page 18 of 87 maintenance fee and the value of labor and materials completed and in place for individual delivery orders.
In addition, the Contractor shall provide the following support for each request for payment for additional, seasonal, and emergency services:
-Time sheets to support the number of hours worked for each work order and signed by the Contractor’s approving official that work has been completed.
G.2.3 Payments to Subcontractors
The Contractor shall make timely payment from the proceeds of the progress or final payment for which request is being made, to his subcontractors and suppliers in accordance with the
Contractor's contractual arrangements with them.
G.2.4 Evaluation by the Contracting Officer
Following receipt of the Contractor's request for payment, and on the basis of an inspection of the work, the Contracting Officer shall make a determination as to the amount which, in his/her opinion, is then due. In the event the Contracting Officer does not approve payment of the full amount applied for, less the retainage addressed in
52.232-5, the Contracting Officer shall advise the Contractor of the reasons therefore.
G.2.5 Additional Withholding
Independently of monies retained by the Government under 52.232-5, or otherwise as permitted to be retained under this contract, the Government may withhold from payments due the Contractor any amounts as may be considered necessary to cover
(a) Wages or other amounts due the Contractor's employees on this project;
(b) Wages or other amounts due employees of subcontractors on this project;
(c) Amounts due suppliers of materials or equipment for this project; and
(d) Any other amounts for which the Contractor may be held liable under this contract, including but not limited to the actual or prospective costs of correction of defective work and prospective liquidated damage when the
Contractor has failed to make adequate progress.
G.2.6 Payment
In accordance with FAR 52.232-27(a) the 14 day period identified in FAR
52.232-27(a)(1)(i)(A) is hereby changed to 30 days.
United States Embassy Cairo, Egypt Page 19 of 87
G.3 VALUE ADDED TAX
VALUE ADDED TAX (VAT). The Government will not reimburse the Contractor for
VAT under this contract. The Contractor shall not include a line for VAT on Invoices as the United States Embassy has a tax exemption certificate with the host government.
G.3.1 Recordkeeping Requirements
The Contractor and the COR shall both maintain a complete and accurate management file. The file shall contain as a minimum, the following items:
The Government's copies of all task orders issued under this contract, and all inspection reports completed by the COR (OF-127). These forms will be supplied to advise the Contractor of service requests and to document the performance of all work, including emergency work.
Contractor's Service Report forms, documenting arrival and departure time of the Contractor's representative performing the service, and all information on parts installed for unscheduled and emergency services only.
Documentation of any complaints from Post personnel or unusual incidents which may have taken place during the visit to the site.
United States Embassy Cairo, Egypt Page 20 of 87
SECTION H
SPECIAL CONTRACT REQUIREMENTS
H.1 RESERVED
H.2 ORDERING OFFICIAL
In accordance with FAR 52.216-18 ORDERING (OCT 1995), the designated ordering individual for this contract is the Contracting Officer.
H.3 BOND REQUIREMENTS
H.3.1 Bonds Required
The Contractor shall furnish (1) a performance and guaranty bond on forms provided by and from sureties acceptable to the Government, in the amount of 10% of the contract price, or (2) comparable alternate performance security approved by the
Government.
H.3.2 Time for Submission
The Contractor shall provide the bonds required above within ten (10) calendar days of contract award. Failure to timely submit (1) the required bonds other security acceptable to the Government; (2) bonds from an acceptable surety; or (3) bonds in the required amount, may result in rescinding or termination of the contract by the
Government.
H.3.3 Coverage
The bonds or alternate performance security shall guarantee the Contractor's execution and completion of the work within the contract time and the correction of any defects after completion as required by this contract, the payment of all wages and other amounts payable by the Contractor under its subcontracts or for labor and materials, and the satisfaction or removal of any liens or encumbrances placed on the work.
H.4 CERTIFICATE OF INSURANCE
The Contractor shall furnish to the Contracting Officer a current certificate of insurance as evidence of the insurance required. In addition, the Contractor shall furnish evidence of a commitment by the insurance carrier to notify the Contracting Officer in writing of any material change, expiration or cancellation of any of the insurance policies required not less than thirty (30) days before such change, expiration or cancellation is effective.
When coverage is provided by self-insurer, the Contractor shall not change or decrease the coverage without the Contracting Officer's approval. If the Contractor intends to use any subcontractors under this contract, the Contractor must ensure that the subcontractor carries the types and amounts of insurance as identified below.
United States Embassy Cairo, Egypt Page 21 of 87
The Contractor's attention is directed to Section I, 52.228-5, "Insurance - Work on a
Government Installation". As required by this clause, the Contractor is required to provide whatever insurance is legally necessary. The Contractor, shall, at its own expense, provide and maintain during the entire performance period the following insurance amounts:
General Liability (includes premises/operations, collapse hazard, products, completed operations, contractual, independent contractors, broad form property damage, personal injury)
1. Bodily Injury, On or Off the Site, in US Dollars
Per Occurrence $ 5,000
Cumulative $ 15,000
2. Property Damage, On or Off the Site, in US Dollars
Per Occurrence $ 10,000
Cumulative $ 20,000
The foregoing types and amounts of insurance are the minimums required. The
Contractor shall obtain any other types of insurance required by local law or that are ordinarily or customarily obtained in the location of the work. The limit of such insurance shall be as provided by law or sufficient to meet normal and customary claims.
The Contractor agrees that the Government shall not be responsible for personal injuries or for damages to any property of the Contractor, its officers, agents, servants, and employees, or any other person, arising from an incident to the Contractor's performance of this contract. The Contractor shall hold harmless and indemnify the Government from any and all claims arising therefrom, except in the instance of gross negligence on the part of the Government.
The Contractor shall obtain adequate insurance for damage to, or theft of, materials and equipment in insurance coverage for loose transit to the site or in storage on or off the site.
H.4.1 Government as Additional Insured
The general liability policy required of the Contractor shall name "the United
States of America, acting by and through the Department of State", as an additional insured with respect to operations performed under this contract.
H.4.2 Insurance-Related Disputes
United States Embassy Cairo, Egypt Page 22 of 87
Failure to agree to any adjustment contemplated under this contract regarding insurance shall be a dispute within the meaning of the clause in Section I, 52.233-1, Alternate I, "Disputes". However, nothing in this clause shall excuse the Contractor from proceeding with the work, including the repair and/or replacement as herein above provided.
H.4.3 Time for Submission of Evidence of Insurance
The Contractor shall provide evidence of the insurance required under this contract within thirty (30) calendar days after contract award. Failure to timely submit this evidence, in a form acceptable to the Contracting Officer, may result in rescinding or termination of the contract by the Government.
H.5 GOVERNING LAW
The contract and the interpretation thereof shall be governed by the laws of the
United States.
H.6 LANGUAGE PROFICIENCY
The manager assigned by the Contractor to superintend the work on-site, as required by Section I, 52.236-6, "Superintendence by the Contractor", shall be fluent in written and spoken English.
H.7 LAWS AND REGULATIONS
H.7.1 Compliance Required
The Contractor shall, without additional expense to the Government, be responsible for complying with all laws, codes, ordinances, and regulations applicable to the performance of the work, including those of the host country, and with the lawful orders of any governmental authority having jurisdiction. Host country authorities may not enter the facilities without the permission of the Contracting Officer. Unless otherwise directed by the Contracting Officer, the Contractor shall comply with the more stringent of the requirements of such laws, regulations and orders and of the contract. In the event of a conflict among the contract and such laws, regulations and orders, the
Contractor shall promptly advise the Contracting Officer of the conflict and of the
Contractor's proposed course of action for resolution by the Contracting Officer.
The Contractor shall provide on a monthly basis an environmental waste report which describes any occurrence of and disposal of hazardous waste encountered during performance of this contract and any resulting delivery orders issued herein.
H.7.2 Labor, Health and Safety Laws and Customs
United States Embassy Cairo, Egypt Page 23 of 87
The Contractor shall comply with all local labor laws, regulations, customs and practices pertaining to labor, safety, and similar matters, to the extent that such compliance is not inconsistent with the requirements of this contract.
H.7.3 Subcontractors
The Contractor shall give written assurance to the Contracting Officer that all subcontractors and others performing work on or for the project have obtained all requisite licenses and permits.
H.7.4 Evidence of Compliance
Proper documentation and evidence satisfactory to the Contracting Officer of compliance with this clause shall be submitted by the Contractor at such times as directed by the Contracting Officer.
H.8 RESPONSIBILITY OF CONTRACTOR
H.8.1 Damage to Persons or Property
The Contractor shall be responsible for all damages to persons or property that occur as a result of the Contractor's fault or negligence, and shall take proper safety and health precautions to protect the work, the workers, the public, and the property of others.
H.8.2 Responsibility for Work Performed
The Contractor shall be responsible for all materials delivered and work performed, except for any completed unit of work which may have been accepted in writing under individual delivery orders.
H.9 MAINTENANCE OPERATIONS
H.9.1 Operations and Storage Areas
(a) Confinement to Authorized Areas. The Contractor shall confine all operations
(including storage of materials) on Government premises to areas authorized or approved
(b) Vehicular Access. The Contractor shall, and in accordance with any regulations prescribed by the Contracting Officer, use only established site entrances and roadways.
H.9.2 Use of Premises
(a) Occupied Premises. If the premises are occupied, the Contractor, its subcontractors, and their employees shall comply with the regulations promulgated by the
United States Embassy Cairo, Egypt Page 24 of 87
Government governing access to, operation of, and conduct while in or on the premises and shall perform the work required under this contract in such a manner as not to unreasonably interrupt or interfere with the conduct of Government business.
(b) Requests from occupants. Any request received by the Contractor from occupants of existing buildings to change the sequence of work shall be referred to the
Contracting Officer for determination.
(c) Access limited. The Contractor, its subcontractors and their employees shall not have access to or be admitted into any building or portion of the site outside the areas designated in this contract except with the permission of the Contracting Officer.
H.10 SAFETY
H.10.1 Accident Prevision
(a) General. The Contractor shall provide and maintain work environments and procedures which will (1) safeguard the public and Government personnel, property, materials, supplies, and equipment exposed to Contractor operations and activities; (2) avoid interruptions of Government operations and delays in project completion dates; and
(3) control costs in the performance of this contract. For these purposes, the Contractor shall--
(1) Comply with the standards issued by any local government authority having jurisdiction over occupational health and safety issues; and
(2) Ensure that any additional measures the Contracting Officer determines to be reasonably necessary for this purpose are taken.
(b) Records. The Contractor shall maintain an accurate record of exposure data on all accidents incident to work performed under this contract resulting in death, traumatic injury, occupational disease, or damage to or theft or loss of property, materials, supplies, or equipment. The Contractor shall report this data in the manner prescribed by the
Contracting Officer.
(c) Subcontracts. The Contractor shall be responsible for its subcontractors' compliance with this clause.
(d) Written Program. Before commencing the work, the Contractor shall--
(1) Submit a written proposal for implementing this clause; and
(2) Meet with the Contracting Officer to discuss and develop a mutual understanding relative to administration of the overall safety program.
United States Embassy Cairo, Egypt Page 25 of 87
(e) The Contracting Officer shall notify the Contractor of any non-compliance with these requirements and the corrective actions required. This notice, when delivered to the Contractor or the Contractor's representative at site, shall be deemed sufficient notice of the non-compliance and corrective action required. After receiving the notice, the Contractor shall immediately take correction action. If the Contractor fails or refuses to promptly take corrective action, the Contracting Officer may issue an order stopping all or part of the work until satisfactory corrective action has been taken. The Contractor shall not be entitled to any equitable adjustment of the contract price or extension of the performance schedule on any stop work order issued under this clause.
H.11 SUBCONTRACTORS AND SUPPLIERS
H.11.1 Claims and Encumbrances
The Contractor shall satisfy as due all lawful claims of any persons or entities employed by the Contractor, including subcontractors, materialmen and laborers, for all labor performed and materials furnished under this contract, including the applicable warranty or correction period, unless the Government shall be directly liable therefore by contract. The Contractor shall not at any time permit any lien, attachment, or other encumbrance to be entered against or to remain on the building(s), or the premises, whether public or private, or any portion thereof, as a result of nonperformance of any part of this contract.
H.11.2 Approval of Subcontractors
(a) Review and approval. The Government reserves the right to review proposed subcontractors for a period of five (5) calendar days before providing notice of approval or rejection of any or all subcontractors.
(b) Rejection of subcontractors. The Government reserves the right to reject any or all subcontractors proposed if their participation in the project, as determined by the
Contracting Officer, may cause damage to the national security interests of the United
States. The Contractor agrees to promptly replace any subcontractor rejected by the
Government under this clause.
H.12 CONTRACTOR PERSONNEL
H.12.1 Removal of Personnel
The Contractor shall maintain discipline at the site and at all times take all reasonable precautions to prevent any unlawful, riotous or disorderly conduct by or amongst those employed at the site and for the preservation of peace and protection of persons and property in the neighborhood of the project against the same. The
Contracting Officer may require, in writing, that the Contractor remove from the work any employee that the Contracting Officer deems incompetent, careless, insubordinate or
United States Embassy Cairo, Egypt Page 26 of 87 otherwise objectionable, or whose continued employment on the project is deemed by the
Contracting Officer to be contrary to the Government's interests.
H.12.2 Maintenance Personnel Security
After award of the contract, the Contractor has ten calendar days to submit to the
Contracting Officer a list of workers and supervisors assigned to this project for the
Government to conduct all necessary security checks. It is anticipated that security checks will take up to 30 days to perform. For each individual the list shall include:
Full Name:
Place and Date of Birth:
Current Address:
Identification Number:
Fingerprint Card
Failure to provide any of the above information may be considered grounds for rejections and/or resubmittal of the application. Once the Government has completed the security screening and approved the applicants a badge will be provided to the individual for access to the site. This badge may be revoked at any time due to the falsification of data, or misconduct on site.
H.12.3. Standards of Conduct
(a) General. The Contractor shall maintain satisfactory standards of employee competency, conduct, cleanliness, appearance and integrity and shall be responsible for taking such disciplinary action with respect to employees as may be necessary. Each
Contractor employee is expected to adhere to standards of conduct that reflect credit on themselves, their employer, and the United States Government. The Government reserves the right to direct the Contractor to remove an employee from the worksite for failure to comply with the standards of conduct. The Contractor shall immediately replace such an employee to maintain continuity of services at no additional cost to the Government.
(b) Uniforms and Personal Equipment. The Contractor 's employees shall wear clean, neat and complete uniforms when on duty. All employees shall wear uniforms approved by the Contracting Officer's Representative (COR). The Contractor shall provide for each employee and supervisor, uniforms and personal equipment. The
Contractor shall bear the cost of purchasing, cleaning, pressing, and repair of the uniforms.
(c) Neglect of duties shall not be condoned. This includes sleeping while on duty, unreasonable delays or failures to carry out assigned tasks, conducting personal affairs during duty hours and refusing to render assistance or cooperate in upholding the integrity of the worksite security.
United States Embassy Cairo, Egypt Page 27 of 87
(d) Disorderly conduct, use of abusive or offensive language, quarreling, intimidation by words, actions, or fighting shall not be condoned. Also included is participation in disruptive activities which interfere with normal and efficient
Government operations.
(e) Intoxicants and Narcotics. The Contractor shall not allow its employees while on duty to possess, sell, consume, or be under the influence of intoxicants, drugs or substances which produce similar effects.
(f) Criminal Actions. Contractor employees may be subject to criminal actions as allowed by law in certain circumstances. These include but are not limited to the following actions: falsification or unlawful concealment, removal, mutilation, or destruction of any official documents or records or concealment of material facts by willful omission from official documents or records; unauthorized use of Government property, theft, vandalism, or immoral conduct; unethical or improper use of official authority or credentials; security violations; organizing or participating in gambling in any form; and misuse of weapons.
(g) Key Control. The Contractor will not be issued any keys. The keys will check out by a United States Embassy escort as needed.
(h) Notice to the Government of Labor Disputes. The Contractor shall inform the COR of any actual or potential labor dispute that is delaying or threatening to delay the timely performance of this contract.
H.13 MATERIALS AND EQUIPMENT
H.13.1 Selection and Approval of Materials
(a) Standard of Quality. All materials and equipment incorporated into the work shall be new and for the purpose intended, unless otherwise specified, and all workmanship shall be of good quality and performed in a skillful manner as determined
(b) Selection by Contractor. Where the contract permits the Contractor to select products, materials or equipment to be incorporated in the work, or where specific approval is otherwise required by the contract, the Contractor shall furnish to the
Contracting Officer, for approval, the names of the manufacturer, model number, and source of procurement of each such product, material or equipment, together with other pertinent information concerning the nature, appearance, dimensions, performance, capacity, and rating thereof, unless otherwise required by the Contracting Officer. Such information shall be provided in a sufficiently timely manner to permit evaluation by the
Government against the requirements of the contract. When directed to do so, the
Contractor shall submit samples for approval at the Contractor's expense, with all shipping charges prepaid. Installation or use of any products, materials or equipment without the required approval shall be at the risk of subsequent rejection.
United States Embassy Cairo, Egypt Page 28 of 87
H.13.2 Custody of Materials
The Contractor shall be responsible for the custody of all materials received for incorporation into the project, including Government furnished materials, upon delivery to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .