Sediment Basin Cleanout SOW FY24 rev.docx

DOCX document 15 KB Posted

Attached to
Sediment Basin Cleanout 2420032 UTES #1
Solicitation number
SRC0000021808
Issued by
Calhoun County, Alabama

About this file

The document is a Statement of Work (SOW) for the Sediment Basin Cleanout project at the UTES #1/Clark Range Complex facility in Alexandria, Alabama. The project's purpose is to clean out the sediment basin located in the southwest corner of the UTES #1 compound. The work includes removing all liquid, sludge, and sediment from the basin, pressure washing the walls, and disposing of the extracted materials in accordance with ADEM regulations. The service must be completed by the vendor within 90 days of being awarded the contract, and all disposal documentation must be submitted to the CFMO/Environmental Office within 30 days. The sediment basin dimensions are approximately 113ft x 12ft x 4ft. The point of contact for the project is Stewart Lockwood, FMO-ENV, at 334-271-8186.

The related state and local contract opportunity has a mandatory site visit scheduled for May 1, 2024, at 10:00 am at the UTES #1/Clark Range Complex facility. Suppliers must show valid identification, vehicle registration, and proof of insurance to access the controlled-access facility. The contract opportunity is for the Sediment Basin Cleanout project 2420032 UTES #1, and the jurisdiction is Calhoun County, Alabama.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UTES #1 Sediment Basin Cleanout FY24

Statement of Work

UTES #1/CLARK RANGE COMPLEX

1236 GATE 3 ROAD

ALEXANDRIA, ALABAMA 36250

The purpose of this project is to clean out the sediment basin at UTES #1 on Clark Range in Alexandria, AL.

1. All liquid, sludge/sediment from sediment basin located in the SW corner of the UTES#1 compound shall be removed from site. All extracted material shall be disposed in accordance with ADEM regulations.

2. Pressure wash walls of basin and remove any debris or material remaining in the basin.

3. All documentation of disposal/waste manifests shall be submitted to the CFMO/Environmental Office within 30 days of disposal.

4. Coordination with the Environmental Office is required for any changes to the work being performed.

5. Service must be completed by vendor within 90 days of being awarded the service.

6. Sediment basin dimensions are approximately 113ft x 12ft x 4ft.

7. POC for the project is Stewart Lockwood, FMO-ENV, 334-271-8186, stewart.e.lockwood.nfg@army.mil.

8. This is a controlled access facility. Vendors must show a valid driver’s license, vehicle registration and proof of insurance for gate access. Any riders must also show valid identification (driver’s license, State ID, Employee ID, Etc.)

File details come from the government source that posted it. Updated .