Security Camera Project.docx

DOCX document 14 KB Posted

Attached to
Purchase, mounting and integration of 8 Security Cameras
Solicitation number
15B80025Q00000007
Issued by

About this file

This document is a project description for a Security Camera Project issued by the Department of Justice Bureau of Prisons. The project involves replacing and upgrading existing security camera infrastructure, specifically purchasing and installing 8 new security cameras. The technical specifications include replacing four existing 2MP corner cameras with a new configuration featuring four 5MP cameras in a quad arrangement and a central 2MP zoom PTZ camera that can respond to motion detection. Each PTZ camera requires a PoE++ injector.

The solicitation (15B80025Q00000007) requires electronic quote submission on company letterhead by September 8, 2025, at 12:00 PM EST. Submissions must include material costs, labor, shipping prices, and DUNS number. All vendors must be registered in SAM.gov to be considered. Quotes should be sent to contracting specialists J1Moreno and IMiller via email, with quote expiration date and best delivery schedule included. Vendors are advised to monitor the website for updates and amendments, and late submissions will not be accepted.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PROJECTS INCLUDES THE FOLLOWING:

*Purchase, mounting and integration of 8 Security Cameras.

*Purchase of 8 new security cameras. (Refer to specifications below) *Dismounting of existing cameras. (More details below) *Mounting of 8 new security cameras and relocation of one reusable camera.

*Set-up and integration of cameras into existing system.

MORE DETAILS:

Replace existing (4) 2MP cameras located on the corners of the building with a camera that has (4) 5MP cameras in a quad arrangement and a central 2MP zoom PTZ that can respond to motion in the quads. (Note: Each of the 5 PTZ cameras requires a PoE++ injector.)

The other cameras, listed below, will replace older cameras located at various locations around the exterior of the building and garage to update field of vision functionality.

Remove existing ancillary equipment and setup and configure all new cameras into existing Operations Software system and recorder.