About this file

This document contains a solicitation for the procurement of A-10 wing tip assemblies. The solicitation requests one first article for each of the left and right wing tip assemblies within 90 days of award, with production batches of 561 and 330 units respectively to be delivered within specified periods after approval of the first article. The solicitation also specifies pricing terms, delivery locations, and qualification requirements. Evaluation will be based on price with award going to the technically acceptable bidder offering the lowest price determined to be fair and reasonable. Only prequalified sources may submit bids, with interested contractors able to request qualification. The solicitation is issued by the Department of the Air Force Materiel Command Air Force Sustainment Center.

View the file

Other files for this federal contract opportunity

Other files attached to A-10 WING TIP ASSY, LH/RH, WING TIP & FAIRING CHAFF / FLARE, OUTER WING PANEL, newest first.
File Type Posted
FA821221R0144_______0002.pdf PDF
SectionMUPDATED.pdf PDF
SectionLUPDATED.pdf PDF
ADDITIONALEDL2.pdf PDF
ADDITIONALEDL1.pdf PDF
FA821221R0144_______0001.pdf PDF
ENGINEERINGDATALIST2578.pdf PDF
1423-1 CDRLs.pdf PDF
2169 SPECIAL PACKAGING INSTRUCTION.pdf PDF
FA821221R0144.pdf PDF
PACKAGING STATEMENT OF WORK.pdf PDF
462ENGINEERINGDATAREQUIRMENTS2578.pdf PDF
ManufacturingQualificationRequrirements2578.pdf PDF
SectionL.pdf PDF
158 PACKAGING REQUIRMENTS.pdf PDF
1423-1 CDRL 2578.pdf PDF
ENGINEERINGDATALIST4391.pdf PDF
462ENGINEERINGDATAREQUIREMENTS4391.pdf PDF
ManufacturingQualificationRequrirements391.pdf PDF
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION M

EVALUATION FACTORS FOR AWARD

A. INTRODUCTION:

1. This acquisition will utilize Lowest Priced procedures restricted to technically qualified “Approved Source” offeror(s). This acquisition shall use price as the only evaluated factor between approved sources.

2. The Government intends to award the requirement(s) represented in this solicitation to one awardee. However, the Government reserves the right to award no contract at all.

B. EVALUATION FACTORS AND PROCEDURES:

1. The Government shall evaluate proposals based on the evaluation factor below:

Factor 1- Price

The Offeror’s price will be evaluated based upon the Total Evaluated Price (TEP). The Offeror’s Price Proposal will be evaluated for the criteria of Price Reasonableness and Balance.

Price Reasonableness: The proposed prices will be evaluated for Price Reasonableness. For a price to be reasonable, it will represent a price to the Government that a prudent person would pay when consideration is given to prices in the market. Normally, price reasonableness is established through adequate price competition, but may also be determined through cost and price analysis techniques as described in FAR 15.404. For additional information see

FAR 31.201-3.

Balance: The Government may also determine a proposal unacceptable should the proposed prices be unbalanced. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more items/Contract Line Item Numbers (CLINs) is significantly overstated or understated as indicated by the application of price analysis techniques as those defined by FAR 15.404-1.

Total Evaluated Price (TEP): A TEP will be calculated and be used for evaluation of offers to determine the lowest priced proposal. The TEP will utilize the offerors proposed unit pricing in Section B and will be calculated by taking the summation of Section B applicable total prices.

2. Solicitation Requirements, Terms and Conditions: In addition to meeting the identified factor above, Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications.

Furthermore, all Offeror’s shall be listed as approved sources in the Government’s Screening Analysis Worksheet Form 761, or be determined an approved source by a Government engineer prior to contract award. A Manufacturing Qualification

Requirements package is attached to this solicitation for those contractors who are not already qualified; however, per FAR 9.202(e), the Government reserves the right not to delay contract award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards.

3. The process for the evaluation of proposals is as follows:

a. Approved Source Offerors Total Evaluated Price will be calculated.

b. Proposals will be evaluated to ensure all solicitation requirements identified above have been met. If an offeror fails to meet the solicitation requirements identified above, they may be ineligible to receive the award.

c. Past performance record and history will be assessed via Government databases as one of the multiple standards required for a successful offeror to be determined responsible as described in FAR 9.104. Contractors shall the terms and conditions in this solicitation, to be determined responsible.

d. The Approved Source offeror meeting the contract requirements who is determined to be responsible, with the lowest Total Evaluated Price will be selected for award.

File details come from the government source that posted it. Updated .