This file is a labor rate schedule for the San Antonio New VA Medical Center Architect-Engineer Services Indefinite Delivery Contract (IDC). The schedule establishes hourly billing rates for approximately 88 distinct labor categories across a 10-year ordering period, consisting of a five-year base with one five-year option, with five annual periods in each phase. Labor categories span multiple disciplines including project management, architecture, engineering (civil, electrical, mechanical, structural, geotechnical, and fire protection), construction management, medical facility planning, medical equipment planning, commissioning, environmental compliance, and specialized roles such as infection control nurses, medical physicists, and NEPA specialists. Each category is stratified by experience level, typically offering Subject Matter Expert (SME), Senior, Staff, and Junior-level positions to accommodate varying project requirements and cost structures. The schedule also includes reproduction and materials pricing for xerographic copies in various formats (8.5" x 11", 8.5" x 14", and 11" x 17") in both black and white and color, as well as CAD printing services in three standard sizes. Contractors are required to populate the blank rate fields for each labor category and material item, enabling the government to evaluate pricing proposals for the estimated $90 million total ordering limitation contract supporting the design and construction of approximately 1.4 million gross square feet of medical facility complex.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section B

San Antonio New VA Medical Center A-E SATOC IDC
Section B: Rate Schedule
LineDESCRIPTIONUNITBase YearBase YearBase YearBase YearBase YearOption YearOption YearOption YearOption YearOption Year
ItemOneTwoThreeFourFiveOneTwoThreeFourFive
0001PrincipalHOUR
0002Project Manager, SMEHOUR
0003Project Manager, SeniorHOUR
0004Project Manager, StaffHOUR

0005 Activation Specialist HOUR

0006Architect, SMEHOUR
0007Architect, SeniorHOUR
0008Architect, StaffHOUR

0009 Architectual Historian HOUR

0010 CADD Technician HOUR

0011Civil Engineer, SMEHOUR
0012Civil Engineer, SeniorHOUR
0013Civil Engineer, StaffHOUR

0014 Certified Value Specialist Facilitator HOUR

0015Cost Estimator, SMEHOUR
0016Cost Estimator, SeniorHOUR
0017Cost Estimator, StaffHOUR
0018Commissioning Engineer, SMEHOUR
0019Commissioning Engineer, SeniorHOUR
0020Commissioning Engineer, StaffHOUR
0021Communications Systems Professional, SMEHOUR
0022Communications Systems Professional, SeniorHOUR
0023Communications Systems Professional, StaffHOUR
0024Construction Manager, SMEHOUR
0025Construction Manager, SeniorHOUR
0026Construction Manger, StaffHOUR

0027 Design Sustainability Coordinator HOUR

0028Electrical Engineer, SMEHOUR
0029Electrical Engineer, SeniorHOUR
0030Electrical Engineer, StaffHOUR

0031 Engineering Geologist, SME HOUR

0032Environmental Engineer, SMEHOUR
0033Environmental Engineer, SeniorHOUR
0034Environmental Engineer, StaffHOUR
0035Fire Protection Engineer, SMEHOUR
0036Fire Protection Engineer, SeniorHOUR
0037Fire Protection Engineer, StaffHOUR

0038 Force Protection Consultant HOUR

0039Geologist, SeniorHOUR
0040Geologist, StaffHOUR
0041Geotechnical Engineer, SMEHOUR
0042Geotechnical Engineer, SeniorHOUR
0043Geotechnical Engineer, StaffHOUR

0044 GIS Specialist HOUR

0045 Industrial Hygienist HOUR

0046Interior Designer, SMEHOUR
0047Interior Designer, SeniorHOUR
0048Interior Designer, StaffHOUR

0049 Infection Control Nurse HOUR

0050Landscape Architech, SMEHOUR
0051Landscape Architech, SeniorHOUR
0052Landscape Architech, StaffHOUR
0053Mechinical Engineer, SMEHOUR
0054Mechinical Engineer, SeniorHOUR
0055Mechinical Engineer, JuniorHOUR
0056Medical Facility Planner, SMEHOUR
0057Medical Facility Planner, SeniorHOUR
0058Medical Facility Planner, StaffHOUR
0059Medical Equipment Planner, SMEHOUR
0060Medical Equipment Planner, SeniorHOUR
0061Medical Equipment Planner, StaffHOUR
0062Medical Physicist (X-ray/MRI), SMEHOUR
0063Medical Physicist (X-ray/MRI), SeniorHOUR
0064Medical Physicist (X-ray/MRI), StaffHOUR
0065NEPA Specialist, SMEHOUR
0066NEPA Specialist, SeniorHOUR
0067NEPA Specialist, StaffHOUR

0068 Project Controls/Scheduler HOUR

0069 Project Suppport Specialist/Document Coordinator HOUR

0070 Quality Management HOUR

0071Structural Engineer, SMEHOUR
0072Structural Engineer, SeniorHOUR
0073Structural Engineer, StaffHOUR
0074Traffic Engineer, SMEHOUR
0075Traffic Engineer, SeniorHOUR
0076Traffic Engineer, StaffHOUR
0077Additional Proposed DisciplineHOUR
0078Additional Proposed DisciplineHOUR
0079Additional Proposed DisciplineHOUR
Reproductions and Materials
LineDESCRIPTIONBase YearBase YearBase YearBase YearBase YearOption YearOption YearOption YearOption YearOption Year
ItemOneTwoThreeFourFiveOneTwoThreeFourFive
0077Xerox 8-1/2 by 11 Inches B&WEA
0078Xerox 8-1/2 by 11 Inches ColorEA
0079Xerox 8-1/2 by 14 Inches B&WEA
0080Xerox 8-1/2 by 14 Inches ColorEA
0081Xerox 11 by 17 Inches B&WEA
0082Xerox 11 by 17 Inches ColorEA
0083CAD Print 22 by 34 Inches PaperSQ/FT
0084CAD Print 28 by 40 Inches PaperSQ/FT
0085CAD Print 34 by 44 Inches PaperSQ/FT
LineDESCRIPTIONUNITBase YearBase YearBase YearBase YearBase YearOption YearOption YearOption YearOption YearOption Year
ItemOneTwoThreeFourFiveOneTwoThreeFourFive
0086Additional Proposed DisciplineHOUR
0087Additional Proposed DisciplineHOUR
0088Additional Proposed DisciplineHOUR