Section M.docx
DOCX document 25 KB Posted
- Attached to
- REPAIR SERVICES FOR THE JTE PROGRAM Federal contract opportunity
- Solicitation number
- FA825024R0006
About this file
This document is the Section M, Evaluation Factors for Award, from a federal solicitation. It outlines the evaluation criteria and procedures to be used for the contract award.
The key details are:
- This is a Lowest Priced, Technically Acceptable procurement, restricted to approved sources on the Contract Screening Analysis Worksheet.
- The sole evaluation factor is Price, which will be evaluated for Price Reasonableness and Balance. A Total Evaluated Price (TEP) will be calculated.
- The award will be made to the offeror with the lowest TEP who is a qualified source. If the two lowest proposals are equal, discussions may be held to obtain best and final offers.
- Past performance and responsibility, as well as compliance with delivery dates and terms/conditions, will also be evaluated.
- The related federal contract opportunity is for Repair Services for the JTE Program, including compressor parts, data deliverables, and related services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA825024R0006-SOL.pdf | ||
| Section L.docx | DOCX document | |
| TRANSPORTATION.pdf | ||
| PACKAGING.pdf | ||
| ITEM DISCRIPTION.pdf | ||
| SQRS.pdf | ||
| IUID.pdf | ||
| SPI.pdf | ||
| GFP_4440015989067.xlsx | XLSX spreadsheet | |
| FA825024R0006-SOL.pdf | ||
| CAV_AF.pdf | ||
| PWS.pdf | ||
| Combined-CDRLs.pdf | ||
| SOW.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION M
EVALUATION FACTORS FOR AWARD
A. INTRODUCTION:
This acquisition will utilize Lowest Priced procedures restricted to technically qualified offeror(s), identified as such by being listed as an approved source on the Contract Screening Analysis Worksheet (762).
The government intends to award the requirement(s) represented in this solicitation to one awardee. However, the Government reserves the right to award no contract at all.
B. EVALUATION FACTORS AND PROCEEDURES:
The government shall evaluate proposals based on the evaluation factor below:
Factor 1- Price
The Offeror’s price will be evaluated based upon the Total Evaluated Price (TEP). The Offeror’s Price Proposal will be evaluated for the criteria of Price Reasonableness and Balance.
Price Reasonableness: The proposed prices will be evaluated for Price Reasonableness. For a price to be reasonable, it will represent a price to the Government that a prudent person would pay when consideration is given to prices in the market. Normally, price reasonableness is established through adequate price competition, but may also be determined through cost and price analysis techniques as described in FAR 15.404. For additional information see FAR 31.201-3.
Balance: The Government may also determine a proposal unacceptable should the proposed prices be unbalanced. Unbalanced pricing exists when, despite an acceptable total evaluated price, the price of one or more items/Contract Line Item Numbers (CLINs) is significantly overstated or understated as indicated by the application of price analysis techniques as those defined by FAR 15.404.
Total Evaluated Price (TEP): A TEP will be calculated to be used for evaluation of offers to determine the lowest-priced proposal. The TEP calculation will be a summation of all Contract Line Item Pricing.
Solicitation Requirements, Terms and Conditions: In addition to meeting the identified factor above, Offerors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and required delivery schedules.
Furthermore, all Offeror’s shall be listed as an approved source in the Government’s Screening Analysis Worksheet Form 761 or 762 prior to contract award.
A qualification package request is attached to this solicitation for those contractors who are not already qualified; however, per FAR 9.202(e), the government reserves the right not to delay contract award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards.
The process for the evaluation of proposals is as follows:
This award will be made to the offeror that submitted the proposal with the lowest Total Evaluated Price and is a qualified source. In the rare instance where the two lowest-priced proposals from qualified sources are the same, the PCO may enter into discussions to provide both offerors an opportunity to supply a best and final offer.
Past performance record and history will be assessed as one of the multiple standards required for a successful offeror to be determined responsible as described in FAR 9.104. Contractors shall meet the required delivery dates, as well as the terms and conditions in this solicitation, to be determined responsible.