Section J Documents.pdf
PDF 65 KB Posted
- Attached to
- FM Tulsa and O&M Muskogee Procurement
- Solicitation number
- 47PH0220R0016
View the file
Other files
Show all 45
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENTS
Attachment 1 Collective Bargain Agreement (CBA)
Attachment 2 CBA-Wage Determination [Enter WD from DOL WD for the CBA]
Attachment 3 Wage Determination No. [Enter WD DOL for non CBA FTE's]
Attachment 4 List of Deliverables
BUILDING LIBRARY
BL1 Extinguisher Report BL2 Inventory to Include Fire Alarm Devices
BL3 Location General Information
BL4 Elevator Information BL5 Roof Information BL6 Work Order History BL7 Energy Report BL8 PM Schedules
EXHIBITS - CUSTODIAL SERVICES
Exhibit C1 Building Information Sheet [Tulsa-custodial only] Exhibit C2 Full Maintenance Quality Assurance Surveillance Plan (QASP) Exhibit C3 Surveillance Forms -1181A Exhibit C4 Building Exterior and Hardscape Plan Exhibit C5 Erosion and Sediment Control Exhibit C6 Recycling/Solid Waste/Trash Report Exhibit C7 PBS Waste Audits
EXHIBITS OPERATIONS & MAINTENANCE
Exhibit M1& C2 Full Maintenance Quality Assurance Surveillance Plan (QASP) Exhibit M2 Green Purchasing Report Exhibit M3 Environmentally Sustainable Products and GSA Attribute Preferences Exhibit M4 Building Operating Plan Template Exhibit M5 Smart Buildings, GSA Smart and Sustainable Buildings Exhibit M6 Water Treatment Exhibit M7 Qualifications of Electrical Testing Technicians (ETT) Exhibit M8 Miscellaneous Best Practices Shave Energy Exhibit M9 Preventative Maintenance Guide Exhibit M10 PV Service Schedule- Does not apply
FIGURES
Figure B-1 Contractor Staffing Declaration Figure B-2 SCA DOL/CBA Combination Wage Adjustment Spreadsheet Figure B-3 Pricing of Services Figure L-1 Management Plan Baseline/Worksheet Figure L-2 Past Performance Questionnaire
File details come from the government source that posted it. Updated .