Exhibit M5 - Smart Buildings (3).pdf

PDF 109 KB Posted

Attached to
FM Tulsa and O&M Muskogee Procurement
Solicitation number
47PH0220R0016
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment 0001 46PH0220R0016 .pdf PDF
Solicitation Amendment 0002 47PH0220R0016.pdf PDF
4 Questions and Answers to Solicitation 47PH0220R0016.pdf PDF
3 Solicitation 47PH0220R0016 Pre-Proposal Conference Agenda Tulsa and Muskogee.pptx PPTX presentation
2 REVISED Figure B 3 Pricing of Services 8 year.xlsx XLSX spreadsheet
1 Attachment 1a Addendum to OK Eastern IUOE Local 627 CBA 2018 01 02.pdf PDF
5 Changes to Solicitation 47PH0220R0016.pdf PDF
BL5 Roof Information for Tulsa Federal Building OK0063ZZ (1) (3).pdf PDF
Muskogee O and M and Tulsa FM Solicitation Spec September 03 2020.pdf PDF
BL8 PM Schedule Tulsa Federal Building (1).pdf PDF
Attachment 4 Table of Deliverables Tulsa and Muskogee New Procurement.pdf PDF
Figure B 2 SCA DOL CBA COMBINATION WD .xlsx XLSX spreadsheet
Exhibit M8 - Misc Best Practices Shave Energy (3).pdf PDF
Exhibit M4 - Bldg Op Plan Template (1) (2).pdf PDF
Section J Documents.pdf PDF
BL3 Building Location Information Tulsa OK OK0063ZZ (2).pdf PDF
Exhibit C4 Building Exterior and Hardscape Plan (2).pdf PDF
BL7 Energy and Water Monthly Report Template.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians (1) (3).pdf PDF
BL2 Inventory List Muskogee Federal Building OK0041ZZ (2).pdf PDF
Exhibit C7 PBS Waste Audits (1) (2).pdf PDF
BL3 Building Location Information Muskogee OK OK0041ZZ (2).pdf PDF
FIGURE B 1 Staffing Declaration .xls XLS spreadsheet
Exhibit M6 - Water Treatment (1) (3).pdf PDF
BL2 Inventory List Tulsa Federal Building OK0063ZZ (2).pdf PDF
Exhibit C5 - Erosion and Sediment Control (1) (2).pdf PDF
Attachment 1 CBA Tulsa and Muskogee Oklahoma (1).pdf PDF
Exhibit C3 - Surveilence Form 1181-A (1).xls XLS spreadsheet
Exhibit M9 - 2018 GSA Preventative Maintenance Guide Tulsa and Muskogee Buy (1).pdf PDF
Exhibit M2 - Green Purchasing Report (1) (2).pdf PDF
Exhibit C6 Recycle Solid Water Trash Report .pdf PDF
Figure L 2 Past Performance Questionnaire.pdf PDF
Exhibit M3 - Environmental Sustainable Products (1) (2).pdf PDF
Attachment 2 Form 98 From DOL Tulsa Muskogee New Buy (4).txt TXT text file
BL5 Roof Information for Muskogee Federal Courthouse OK0041ZZ (1).pdf PDF
Exhibit M1 and C2 - FM Quality Assurance Surveillance Plan (1).pdf PDF
BL6 Work Order History Tulsa and Muskogee JANUARY 2109-DECEMBER 2019 (2).xlsx XLSX spreadsheet
Attachment 3 SCA Wage Determination Muskogee County June 30 2020 WD2015 5320 (1).pdf PDF
FIGURE L1 Management Plan Baseline Worksheet .xlsx XLSX spreadsheet
Exhibit C1 Building Information sheet Muskogee (1) (2).pdf PDF
Figure B 3 Pricing of Services 8 year.xlsx XLSX spreadsheet
BL1 Fire Extinguisher Report Tulsa and Muskogee Buy (2) (2).pdf PDF
Attachment 3 SCA Wage Determination Tulsa County June 30 2020 WD2015 5318 (1).pdf PDF
Exhibit C1 Building Information Sheet Tulsa Federal Building OK0063ZZ (2).pdf PDF
BL8 PM Schedule Muskogee Federal Building (1) (1).pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

systems.

procedures, and job roles in order to better operate the facilities that have these newer technology based systems support more effectively. This may involve more thorough planning and redefining some processes, need to adapt, be more proactive, and leverage the availability of real-time data to help them perform building has outpaced traditional design and construction practices. As a result, building operations and maintenance staff (physical and wireless), servers, internet access, and cloud-based/hosted solutions. This shift in domain expertise facilities more efficiently. Building Systems are getting increasingly more dependent on software, IT networks provided opportunities in the market place to alter the way facilities managers use real time data to operate their which facilities can be monitored, maintained, and operated. Trends in building systems technology have New building technologies, and their convergence with traditional information technology, have altered the way in

1.0 Trend Toward Integrated Building System Technologies

the GSA portfolio deploy Smart Technologies.

new technologies. O&M Contractors should continue to monitor developments in this area as more buildings in for long-term improved operational efficiencies as a result of the investment the Government is making in these Buildings, that tools, processes, data, and some procedures may need to be modified to meet GSA requirements Contractors should be aware that if they are involved in operational support of one of GSA’s newer Smart details are learned as GSA analyzes this new trend of monitoring building performance at a detailed level. O&M available to O&M Contractors and building support personnel and will increase in significance over time as more data about the individual building systems (HVAC/BAS, Lighting, and Advanced Meters). This data will be made implementing Smart Technologies in GSA buildings is to capture and make available more real-time performance project designs. Others involve modest retrofits to update key building controls systems. A key objective of enhancements. Some facility projects involve complete detailed design-built from the infrastructure to completed approximately 250 buildings in the GSA portfolio are undergoing Smart Technologies design and implementation Contractors should be aware of. One of these programs includes Smart Building technologies. Currently, Public Buildings Service has several programs in development and at various stages of implementation that O&M Background Because of current Government energy reduction executive orders and regulatory mandates, GSA

SMART TECHNOLOGIES - BACKGROUND AND PURPOSE

GSA Smart and Sustainable Buildings

Smart Buildings

EXHIBIT M5

File details come from the government source that posted it. Updated .