Exhibit C7 PBS Waste Audits (1) (2).pdf

PDF 123 KB Posted

Attached to
FM Tulsa and O&M Muskogee Procurement
Solicitation number
47PH0220R0016
Issued by

View the file

Other files

File Type Posted
Solicitation Amendment 0001 46PH0220R0016 .pdf PDF
Solicitation Amendment 0002 47PH0220R0016.pdf PDF
2 REVISED Figure B 3 Pricing of Services 8 year.xlsx XLSX spreadsheet
4 Questions and Answers to Solicitation 47PH0220R0016.pdf PDF
3 Solicitation 47PH0220R0016 Pre-Proposal Conference Agenda Tulsa and Muskogee.pptx PPTX presentation
1 Attachment 1a Addendum to OK Eastern IUOE Local 627 CBA 2018 01 02.pdf PDF
5 Changes to Solicitation 47PH0220R0016.pdf PDF
Exhibit M7 - Qualificaiton of Electrical Testing Technicians (1) (3).pdf PDF
BL2 Inventory List Muskogee Federal Building OK0041ZZ (2).pdf PDF
BL3 Building Location Information Muskogee OK OK0041ZZ (2).pdf PDF
FIGURE B 1 Staffing Declaration .xls XLS spreadsheet
Exhibit M6 - Water Treatment (1) (3).pdf PDF
BL2 Inventory List Tulsa Federal Building OK0063ZZ (2).pdf PDF
Exhibit C5 - Erosion and Sediment Control (1) (2).pdf PDF
Attachment 1 CBA Tulsa and Muskogee Oklahoma (1).pdf PDF
Exhibit C1 Building Information sheet Muskogee (1) (2).pdf PDF
Figure B 3 Pricing of Services 8 year.xlsx XLSX spreadsheet
BL1 Fire Extinguisher Report Tulsa and Muskogee Buy (2) (2).pdf PDF
Attachment 3 SCA Wage Determination Tulsa County June 30 2020 WD2015 5318 (1).pdf PDF
Exhibit C1 Building Information Sheet Tulsa Federal Building OK0063ZZ (2).pdf PDF
BL8 PM Schedule Muskogee Federal Building (1) (1).pdf PDF
BL5 Roof Information for Tulsa Federal Building OK0063ZZ (1) (3).pdf PDF
Muskogee O and M and Tulsa FM Solicitation Spec September 03 2020.pdf PDF
BL8 PM Schedule Tulsa Federal Building (1).pdf PDF
Attachment 4 Table of Deliverables Tulsa and Muskogee New Procurement.pdf PDF
Figure B 2 SCA DOL CBA COMBINATION WD .xlsx XLSX spreadsheet
Exhibit M8 - Misc Best Practices Shave Energy (3).pdf PDF
Exhibit M4 - Bldg Op Plan Template (1) (2).pdf PDF
Section J Documents.pdf PDF
Exhibit M5 - Smart Buildings (3).pdf PDF
BL3 Building Location Information Tulsa OK OK0063ZZ (2).pdf PDF
Exhibit C4 Building Exterior and Hardscape Plan (2).pdf PDF
BL7 Energy and Water Monthly Report Template.pdf PDF
Exhibit C3 - Surveilence Form 1181-A (1).xls XLS spreadsheet
Exhibit M9 - 2018 GSA Preventative Maintenance Guide Tulsa and Muskogee Buy (1).pdf PDF
Exhibit M2 - Green Purchasing Report (1) (2).pdf PDF
Exhibit C6 Recycle Solid Water Trash Report .pdf PDF
Figure L 2 Past Performance Questionnaire.pdf PDF
Exhibit M3 - Environmental Sustainable Products (1) (2).pdf PDF
Attachment 2 Form 98 From DOL Tulsa Muskogee New Buy (4).txt TXT text file
BL5 Roof Information for Muskogee Federal Courthouse OK0041ZZ (1).pdf PDF
Exhibit M1 and C2 - FM Quality Assurance Surveillance Plan (1).pdf PDF
BL6 Work Order History Tulsa and Muskogee JANUARY 2109-DECEMBER 2019 (2).xlsx XLSX spreadsheet
Attachment 3 SCA Wage Determination Muskogee County June 30 2020 WD2015 5320 (1).pdf PDF
FIGURE L1 Management Plan Baseline Worksheet .xlsx XLSX spreadsheet
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C7

PBS WASTE AUDITS

This exhibit is provided to the Contractor as a guide for additional considerations for post-audit monitoring, plan implementation, training and other ancillary activities that may assist GSA in meeting the listed objectives.

I. Background GSA’s Public Buildings Service (PBS) provides work environments for over one million Federal employees nationwide. The inventory consists of courthouses, laboratories, offices and border stations.

Tenant activities in these buildings generate tons of solid waste/trash that PBS is obligated to properly dispose of and achieve a minimum waste diversion of 50%. Recycling composting and other alternatives to landfills and incineration are the preferred methods for disposal of solid waste/trash.

II. Objectives Determine the most efficient methods to maximize reduction, recycling, and composting of solid waste/trash and to minimize waste shipments.

Achieve a minimum of 50% waste diversion through waste minimization, recycling, and composting.

Determine the right service level for solid waste/trash collection and removal

III. Extent Of Work The Contractor shall conduct a solid waste/trash audit to include:

100% of the waste and/or recycling collected in a 24 hour period must be audited (excluding durable goods or construction waste).

The audit must represent a 24 hour period on a typical work day.

Use scales to weigh sorted waste, as weight is the preferred metric.

Determine the amount of recyclable materials being thrown away that could have been recycled and composted. At a minimum, the recyclable items within the waste/trash must be identified and separated into the following categories: Paper, Plastic, Cardboard, Glass, Metal/aluminum, and Wet Waste.

The Contractor shall develop a written report and analysis of the conclusions drawn from this audit, including recommendations for improving the economy and efficiency of waste collection, storage, transfer, and disposal (including recycling and composting). This report shall address, at a minimum:

Recommendations to maximize waste minimization, recycling, and composting to achieve at least 50% waste diversion.

Recommendations to right-size service level for solid waste/trash removal services to minimize trash shipments.

The report and analysis is due 60 days after the start date.

File details come from the government source that posted it. Updated .