This is a Statement of Work (SOW) for HVAC system installation at the USDA Agricultural Research Service's Coastal Plains Soil, Water, and Plant Research Center in Florence, SC. The project requires installing a heating and cooling system for a newly constructed portable office enclosure system containing six offices inside Building 3.
The contractor must provide and install a split heat pump system with 3-ton outdoor condensing unit connected to 6.4k BTU wall-mounted air handlers, with each office having its own thermostat and condensate pump. Key requirements include installing wall-mounted air handlers, brackets, copper refrigerant lines, control wiring, condensate drain lines, and properly sized electrical service. The period of performance is 90 calendar days from Notice to Proceed, with work hours between 8:00 AM and 5:00 PM Monday through Friday. The contractor must submit a project schedule and Site Safety Specific Plan within 14 days of award. Required submittals include material specifications, shop drawings, and final documentation like Release of Liens and Claims. The government will provide temporary utilities if requested, and a government representative will inspect the work with 5 days advance notice.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Section J Attachment 2 WD.pdf | ||
| Section J Attachment 3 ARS-371.pdf | ||
| 12405B25Q0051.pdf | ||
| Section J Attachment 4 ARS-372.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Agricultural Research Service
U.S. DEPARTMENT OF AGRICULTURE
Last Updated 12/10/2024
STATEMENT OF WORK
HVAC System Installation For Portable Office
Coastal Plains Soil, Water, and Plant Research Center Clemson Pee Dee REC
2200 Pocket Road Florence, SC
Asset ID: 665700B025
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 2 of 10
1. PROJECT INTRODUCTION
1.1. PROJECT TITLE
HVAC System Installation For Portable Office, Coastal Plains Soil, Water, and Plant Research Center, Florence, SC.
1.2. PROJECT BACKGROUND AND PURPOSE
The USDA, Agricultural Research Service (ARS), Coastal Plains Soil, Water, and Plant Research Center’s (CPSWPCR) mission is to conduct research and transfer solutions that improve agricultural production, protect the environment, and enhance the conservation of natural resources - all within an efficient and profitable agriculture.
In October of 2024, a portable office enclosure system of six (6) offices was constructed inside Building 3 on the CPSWPCR site. The offices are not occupied currently and require HVAC configuration and installation.
The purpose of this project is to provide and install a heating and cooling system to the existing office system consisting of a split heat pump with 3-ton outdoor condensing unit to 6.4k BTU wall mounted air handlers.
1.3. PROJECT CONTACT PERSONS
CONTRACTING OFFICER
Amanda Somerville USDA, ARS, ARM, Southeast Area 406-672-2373 amanda.somerville@usda.gov
LOCATION POINT OF CONTACT (LPOC)
TBD
ADMINISTRATIVE OFFICER (AO)
TBD
ADDITIONAL LPOC
Todd Campbell, Research Geneticist mailto:amanda.somerville@usda.gov
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 3 of 10
USDA, ARS, SEA, CPSWPCR
843-669-5203 todd.campbell@usda.gov
2. SCOPE AND OBJECTIVES
2.1. DESCRIPTION OF WORK
The Contractor must furnish all personnel, equipment, tools, materials, supervision, and quality control necessary to provide an install heating and cooling to the existing portable office system of six (6) offices. Each office must have its own thermostat and its own condensate pump.
2.1.1. Provide and install wall mounted air handlers.
2.1.2. Provide and install split heat pump system consisting of a 3-ton outdoor condensing unit to 6-4k BTU wall mounted air handlers.
2.1.3. Provide and install brackets for outdoor condensing heat pump.
2.1.4. Provide and install copper refrigerant line sets, necessary fittings, and control wire.
2.1.5. Provide and install all condensate drain lines. Each unit must have its own condensate drain pump.
2.1.6. Electrical Service. The Contractor must install properly sized electrical service to the office system’s existing panel box to provide electrical service to each office including electrical service for HVAC system.
2.1.7. All startup of all equipment, checking pressure, airflow and testing operation of all components.
2.1.8. Seal existing concrete floors to control future moisture intrusion.
2.1.9. Clean up and remove all debris.
2.2. The Contractor must verify all dimensions and site conditions prior to beginning work. No Government equipment will be available for use by the Contractor.
mailto:todd.campbell@usda.gov
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 4 of 10
2.3. Site Photographs
a. Existing Portable Office Enclosure System.
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 5 of 10
b. Existing Panel.
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 6 of 10
c. Portable Office System Configuration.
2.4. LOCATION OF WORK
The project is located at Clemson Pee Dee REC, 2200 Pocket Road, Florence, SC 29506. Access to the site is controlled with a fence and call box.
3. PROJECT SCHEDULE
3.1. The completion of the project must not exceed ninety (90) calendar days from the date of the Notice to Proceed (NTP).
3.2. The Contractor must prepare an overall project schedule including milestone dates for all phases of work and completion date; submit to the COR for approval. This schedule is due fourteen (14) days after contract award. The Contractor must track all work progress to ensure that the project is completed according to the schedule. Include work week schedule with daily starting and stopping time.
3.3. The Contractor must coordinate and confirm the dates for all work with the COR. If necessary, any request for a time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration and provide an updated schedule for completion.
8’ x 10’ Office 3
------ 10’----
------ 10’----
------ 10’----
------------------------------------- 30’------------------------------------
8’
8’
8’ x 10’ Office 2
8’ x 10’ Office 1
8’ x 10’ Office 6
8’ x 10’ Office 5
8’ x 10’ Office 4
4’
Air handlers for each officeBreaker box
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 7 of 10
No extension of the period of performance may be given without the written authority of the CO.
3.4. Project work hours are 8:00 am and 5:00 pm, local time, Monday through Friday;
federal holidays excluded. The contractor is not required to provide services on recognized Federal holidays established by Federal law (5 U.S.C. 6103). Any changes to work schedule must be submitted to CO for written approval prior to any schedule change.
4. GENERAL REQUIREEMENTS
4.1. PERMITS
The Contractor must obtain all building and trade permits necessary to include any drawings, plans, permit and inspection fees, utility location, site surveys, and any other items necessary for compliance with state, local, and federal building authorities.
4.2. SAFETY
The Contractor must submit a Site Safety Specific Plan/Accident Prevention Plan (SSSP) in industry recognizable format to the COR within fourteen (14) of contract award. The Government will review and approve the SSSP before issuance of the
NTP.
4.3. EXISTING INSTALLATIONS/DEMOLITION
Coordinate removal of existing installations with COR. All disturbances of existing systems must be coordinated with the COR to prevent disconnecting equipment that may jeopardize on-going research.
4.4. QUALITY CONTROL
Provide quality control to ensure that all components of project work meet the requirements of the contract specifications. Ensure that all work not acceptable or compliant with the specifications is corrected prior to inspection or review by the COR. Quality control is the exclusive responsibility of the Contractor.
4.5. PROTECTION OF WORK AND PROPERTY/SAFETY REQUIREMENTS
4.5.1. The Contractor must protect the work, the site, and all existing property and structures within the limits of the construction activities or that may be affected until acceptance of the work. Any damage to property must be repaired at the Contractor’s expense to pre-damaged condition to the satisfaction of the COR.
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 8 of 10
4.5.2. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor must furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities of the protection and security.
4.5.3. Open depressions and excavations occurring as part of this work must be adequately barricaded or fenced to prevent vehicle or pedestrian traffic into the work area.
4.5.4. Provide continuous noise and dust abatement as required to prevent disturbance and nuisance to the public and workers and to the occupants of adjacent premises and surrounding areas. Dampen or cover areas affected by demolition operations as necessary to prevent dust nuisance.
4.5.5. The contract documents may not represent all surface conditions at the site and adjoining areas. The known surface conditions are as indicated and must be compared with actual conditions before commencement of work and the cost must be included in the Contractor’s quote.
4.5.6. The Government will not furnish any labor or equipment to unload or move materials or supplies.
5. UTILIZATION OF BIOBASED PRODUCTS
The Contractor must utilize products and material based from bio-based materials as applicable, (e.g. bio-based greases; bio-based hydraulic fluids, bio-based absorbents), to the maximum extent possible without jeopardizing the intended end use or detracting from the overall quality delivered to the Government. All supplies and materials must be of a type and quality that conform to the applicable federal specifications and standards.
All supplies and materials to be used in the performance of work described herein are subject to the approval of the Contracting Officer Representative (COR). Products can be found at: www.biopreferred.gov.
6. HAZARDOUS MATERIAL
The facility is believed to be free of asbestos containing materials. Existing conditions are reflected correctly to the best of USDA’s knowledge. The USDA makes no representation, warranty, or guaranty that the conditions indicated either are representative of those conditions existing throughout the area, or that unforeseen developments may not occur, or that materials other than, or proportions different from those indicated may not exist.
The Contractor must include costs for hazardous materials assessment in the quote. If hazardous materials are found to be present, it must be reported to the CO & COR for further action.
http://www.biopreferred.gov/
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 9 of 10
7. DISPOSAL OF REMOVED MATERIALS AND DEBRIS
7.1. The Contractor must dispose of removed materials, waste, trash, and debris in a safe, acceptable manner, in accordance with applicable laws and ordinances and as prescribed by authorities having jurisdiction.
7.2. Burying of trash and debris on the site is prohibited. Burning of trash and debris at the site is prohibited.
7.3. Remove trash and debris from the site at frequent intervals so that its presence will not delay the progress of the work or cause hazardous conditions for workers and the public.
7.4. Removed materials, trash, and debris must become the property of the Contractor and must be removed from the project site and be disposed of in a legal manner.
Location of disposal site and length of haul are the Contractor's responsibility.
7.5. The Contractor should make every effort to recycle as much of the construction debris as possible.
7.6. Any waste materials encountered during the demolition that are found to contain lead, asbestos, polychlorinated biphenyls (PCB), fluorescent lamps, or any hazardous substances are to be handled and removed in accordance with local, state, and federal laws and requirements concerning hazardous waste as well as any specific hazardous waste requirements stated in different sections.
7.7. Comply with hauling and disposal regulations of authorities having jurisdiction, per federal, state, and local requirements.
8. TEMPORARY FACILITIES
Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if requested. The Contractor must maintain and protect all such utilities during the course of construction and must repair or replace any items damaged through its own negligence. Should the Contractor require any power or utility shutdowns during construction, the Contractor must obtain approval for such shutdown from the COR 24 hours prior to the need.
9. CLEANUP
The construction site must be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor must remove from the premises all unused material, trash, and debris resulting from the work to the
12405B25Q0051 – HVAC Install Flooring, Florence, SC Page 10 of 10 satisfaction of the COR.
10. SUBMITTALS
Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project must be submitted to the COR and Contracting Specialist. Electronic submittals are acceptable, otherwise three (3) written submittals are required.
10.1. Project Schedule within fourteen (14) calendar days of award (see Section 3.2).
10.2. SSSP within fourteen (14) days of award (see Section 4.2).
10.3. Any additional material, including shop drawings and specifications, used on this project.
11. INSPECTION AND ACCEPTANCE
A government representative will inspect and approve the work performed on this project. The Contractor must schedule inspection a minimum of five (5) days in advance, in writing, to the COR and CO.
12. FINAL PAYMENT/CONTRACT CLOSEOUT
The following documents are required prior to final payment (other documents may also be required): Release of Liens, Release of Claims, Employee Payroll\Timesheets, and Invoice.
1. PROJECT INTRODUCTION