Section J Attachment 1.pdf

PDF 114 KB Posted

Attached to
Delivery of Firm Load Following Electric Supply Service
Solicitation number
697DCK-21-R-00174
Issued by

View the file

Other files

File Type Posted
Responses to Questions SIR 697DCK-21-R-00174.pdf PDF
Section J Attachment 1.xlsx XLSX spreadsheet
697DCK-21-R-00174 SF-33.pdf PDF
Copy of Section J Attachment 2.xlsx XLSX spreadsheet
697DCK-21-R-00174SIR.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Proposal Form

Section J - Attachment 1

Federal Aviation Administration

William J. Hughes Technical Center

Offeror's Name:

Option 1

$/kWh

Option 2

$/kWh

$0.000000 $/kW-Day

$0.164728 $/kW-Day

1.087100

1.077335

0.997434

$0.192429 $/kW-Day

$0.125186 $/kW-Day

9,405.99 kW 9,723.91 kW

Total Metered KWH -

Line Loss KWH

Option 1

Real-Time LMP Charges

$0

Real-Time Line Loss Charges

$0

Fixed Price Real-Time Adder Charges

$0

Reliability Must Run Charges

$0

Capacity Charges

$0

Transmission Charges

$0

Total Option 1 (Real-Time Market) $0

Option 2

Day-Ahead LMP Charges

$0

Day-Ahead Line Loss Charges

$0

Fixed Price Day-Ahead Adder Charges

$0

Reliability Must Run Charges

$0

Capacity Charges

$0

Transmission Charges

$0

Total Option 2 (Day-Ahead Market) $0

Capacity Rate = Final Zonal Net Load Price * Final Forecast Pool Requirement * Final Zonal RPM Scaling Factor * Daily Zonal Scaling Factor

Real-Time Line Loss Charges = Σ(Real-Time Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data * Derated Line Loss Value / 1000)

Transmission Charges = Transmission Peak Load Contribution * Transmission Rate * 365 Days

Real-Time LMP Charges = Σ(Real-Time Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data / 1000)

Day-Ahead LMP Charges = Σ(Day-Ahead Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data / 1000)

Line Loss kWh = Metered kWh * Derated Line Loss Value

Fixed Price Real-Time Adder Charges = Σ(Hourly Metered data) * Fixed Price Real-Time Adder Rate

Fixed Price Day-Ahead Adder Charges = Σ(Hourly Metered data) * Fixed Price Day-Ahead Adder Rate

Final Zonal Net Load Price (as of 6/1/2021)

Reliability Must Run Charges = Transmission Peak Load Contribution * Reliability Must Run Rate * 365 Days

Reliability Must Run (Estimated Annual Avg to be used for this Price Evaluation)

Capacity Rate (as of 6/1/2021)

Transmission Rate (as of 6/1/2021)

Day-Ahead Line Loss Charges = Σ(Day-Ahead Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data * Derated Line Loss Value / 1000)

Capacity Charges = Capacity Peak Load Contribution * Capacity Rate * 365 Days

Final Forecast Pool Requirement (as of 6/1/2021)

Final Zonal RPM Scaling Factor (as of 6/1/2021)

Daily Zonal Scaling Factor (Estimated Annual Avg to be used for this Price Evaluation)

Capacity Peak Load Contribution Transmission Peak Load Contribution

Derated Line Loss Value (Used for Billing)

Fixed Price Real-Time Adder

Fixed Price Day-Ahead Adder