Section J Attachment 1.pdf
PDF 114 KB Posted
- Solicitation number
- 697DCK-21-R-00174
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Responses to Questions SIR 697DCK-21-R-00174.pdf | ||
| Section J Attachment 1.xlsx | XLSX spreadsheet | |
| 697DCK-21-R-00174 SF-33.pdf | ||
| Copy of Section J Attachment 2.xlsx | XLSX spreadsheet | |
| 697DCK-21-R-00174SIR.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Proposal Form
Section J - Attachment 1
Federal Aviation Administration
William J. Hughes Technical Center
Offeror's Name:
Option 1
$/kWh
Option 2
$/kWh
$0.000000 $/kW-Day
$0.164728 $/kW-Day
1.087100
1.077335
0.997434
$0.192429 $/kW-Day
$0.125186 $/kW-Day
9,405.99 kW 9,723.91 kW
Total Metered KWH -
Line Loss KWH
Option 1
Real-Time LMP Charges
$0
Real-Time Line Loss Charges
$0
Fixed Price Real-Time Adder Charges
$0
Reliability Must Run Charges
$0
Capacity Charges
$0
Transmission Charges
$0
Total Option 1 (Real-Time Market) $0
Option 2
Day-Ahead LMP Charges
$0
Day-Ahead Line Loss Charges
$0
Fixed Price Day-Ahead Adder Charges
$0
Reliability Must Run Charges
$0
Capacity Charges
$0
Transmission Charges
$0
Total Option 2 (Day-Ahead Market) $0
Capacity Rate = Final Zonal Net Load Price * Final Forecast Pool Requirement * Final Zonal RPM Scaling Factor * Daily Zonal Scaling Factor
Real-Time Line Loss Charges = Σ(Real-Time Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data * Derated Line Loss Value / 1000)
Transmission Charges = Transmission Peak Load Contribution * Transmission Rate * 365 Days
Real-Time LMP Charges = Σ(Real-Time Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data / 1000)
Day-Ahead LMP Charges = Σ(Day-Ahead Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data / 1000)
Line Loss kWh = Metered kWh * Derated Line Loss Value
Fixed Price Real-Time Adder Charges = Σ(Hourly Metered data) * Fixed Price Real-Time Adder Rate
Fixed Price Day-Ahead Adder Charges = Σ(Hourly Metered data) * Fixed Price Day-Ahead Adder Rate
Final Zonal Net Load Price (as of 6/1/2021)
Reliability Must Run Charges = Transmission Peak Load Contribution * Reliability Must Run Rate * 365 Days
Reliability Must Run (Estimated Annual Avg to be used for this Price Evaluation)
Capacity Rate (as of 6/1/2021)
Transmission Rate (as of 6/1/2021)
Day-Ahead Line Loss Charges = Σ(Day-Ahead Hourly Residual Metered Load Aggregate LMP Rate * Hourly Metered data * Derated Line Loss Value / 1000)
Capacity Charges = Capacity Peak Load Contribution * Capacity Rate * 365 Days
Final Forecast Pool Requirement (as of 6/1/2021)
Final Zonal RPM Scaling Factor (as of 6/1/2021)
Daily Zonal Scaling Factor (Estimated Annual Avg to be used for this Price Evaluation)
Capacity Peak Load Contribution Transmission Peak Load Contribution
Derated Line Loss Value (Used for Billing)
Fixed Price Real-Time Adder
Fixed Price Day-Ahead Adder
File details come from the government source that posted it. Updated .