SECTION C OwnerContractor Ageement.pdf

PDF 181 KB Posted

Attached to
IFB 24106 St. Clair Brooks Park Skatepark Construction
Solicitation number
57027
Issued by
Stafford County, Fredericksburg City, Virginia

About this file

This document is a Owner-Contractor Agreement for the St. Clair Brooks Park Skatepark Construction project, Contract Number 24106, between the Board of Supervisors of Stafford County, Virginia (the Owner) and the Contractor. The project involves the construction of a skatepark facility at St. Clair Brooks Park, with the Contractor responsible for providing all necessary materials, equipment, labor, and services to complete the work. The Contractor is required to commence work promptly upon receipt of the Notice to Proceed and must achieve Substantial Completion within 170 calendar days and Final Completion within 200 calendar days. Liquidated damages of $413 per day and $275 per day will be assessed for failure to meet the Substantial Completion and Final Completion deadlines, respectively.

The total Contract Sum is $[amount], which will be paid to the Contractor in installments based on monthly progress payment applications. The Contractor must submit a Performance Bond, Labor and Material Payment Bond, and Certification of Insurance as required by the Contract Documents. The Contractor must perform at least 30% of the total work with its own forces. The project is located in Stafford County, Virginia, with additional information provided about the Fredericksburg City jurisdiction.

View the file

Other files

File Type Posted
SECTION B Bid Form.pdf PDF
ADDENDUM 2.pdf PDF
IFBCover24106.pdf PDF
24106 Bid Tab —
SECTION AInfor4Bidders.pdf PDF
Section D - Construction General TCs.pdf PDF
Addendum#1withConstPlans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Number: 24106 Section C

St. Clair Brooks Park Skatepark Construction C-1

SECTION C - OWNER-CONTRACTOR AGREEMENT

(revised January 2022)

CONTRACT NUMBER: 24106

PROJECT NAME: St. Clair Brooks Park Skatepark Construction

THIS AGREEMENT made by and between The Board of Supervisors, Stafford County, Virginia

(herein referred to as the “County” or "Owner"), whose physical address is c/o County Administrator, 1300

Courthouse Road, Stafford, Virginia 22554; mailing address is c/o County Administrator, Post Office Box

339, Stafford, Virginia 22555 and ________________________________________________________

(herein referred to as the "Contractor"), whose mailing address is _______________________________

______________________________________________________________. All correspondence, submittals and notices relating to or required under this Contract shall be sent in writing to the above addresses; unless either party is notified in writing by the other, of a change in address.

WITNESSETH:

WHEREAS it is the intention of the Owner to obtain the services of the Contractor in connection with the construction of Brooks Skateboard Park hereinafter referred to as the "Project" or the "Work"; and

WHEREAS the Contractor desires to perform such construction in accordance with the terms and conditions of this Agreement, NOW, THEREFORE, in consideration of the promises made herein and other good and valuable considerations, the following terms and conditions are hereby mutually agreed to, by and between the Owner and Contractor:

St. Clair Brooks Park Skatepark Construction C-2

Article 1

DEFINITIONS

1.1 All terms in this Agreement which are defined in the Information for Bidders and the General

Conditions shall have the meanings designated therein.

1.2 The Contract Documents shall consist of the: Invitation for Bid, Information for Bidders, Bid Form, Owner Contractor Agreement, Drawings, Attachments, General Conditions and Special Conditions

(if any) and any supplements thereto, Specifications and all Addenda issued prior to and all

Modifications issued after execution of the Contract. A Modification is (1) a written Amendment to the Contract signed by both parties, (2) a written Change Order signed by both parties (3) a written

Field Order or Architect/Engineer/Construction Manager’s Supplemental Instructions, (4) a

Unilateral Change Order or Construction Change Directive issued by the Owner. The Contract

Documents form the Contract, and all are as fully a part thereof as if attached to this Agreement or repeated herein.

1.3 The Department Director, as that term is used in the General Conditions and Contract Documents, shall mean Director, Stafford County Department of Parks, Recreation, Facilities and Tourism, or his authorized designee.

Article 2

STATEMENT OF THE WORK

2.1 The Contractor shall provide and pay for all materials, tools, equipment, labor and professional and non-professional services, and shall perform all other acts and supply all other things necessary, to fully and properly perform and complete the Work, as required by the Contract Documents.

2.2 The Contractor shall further provide and pay for all related facilities described in any of the Contract

Documents, including all work expressly specified therein and such additional work as may be reasonably inferred therefrom, saving and excepting only such items of work as are specifically stated in the Contract Documents not to be the obligation of the Contractor. The totality of the obligations imposed upon the Contractor by this Article and by all other provisions of the Contract

Documents, as well as the structures to be built and the labor to be performed, is herein referred to as the “Work”.

St. Clair Brooks Park Skatepark Construction C-3

Article 3

ARCHITECT/ENGINEER/CONSTRUCTION MANAGER

3.1 The Architect/Engineer/Construction Manager (hereinafter referred to as the "A/E/CM" and as defined in the General Conditions) shall be

CONSTRUCTION MANAGER TBD

ENGINEER Vince Onel, VP Skatepark Design

Spohn Ranch, Inc.

6824 S Centinela Avenue

Los Angeles, CA 90230

(626) 330-5803 Ext. 205 vince@spohnranch.com

; provided, however, that the Owner may, without liability to the Contractor, unilaterally amend this

Article from time to time by designating a different person(s) or organization(s) to act as its A/E/CM and so advising the Contractor in writing, at which time the person(s) or organization(s) so designated shall be the A/E/CM for purposes of this Contract.

Article 4

TIME OF COMMENCEMENT AND COMPLETION

4.1 The Contractor shall commence the Work promptly upon the date established in the Notice to

Proceed. If there is no Notice to Proceed, the date of commencement of the Work shall be the date of this Agreement or such other date as may be established herein. Pursuant to the General

Conditions and Special Conditions, Owner may also issue a Limited Notice to Proceed for a portion of the Work.

4.2 Time is of the essence. The Contractor shall achieve Substantial Completion, as defined in the

General Conditions, within 170 calendar days from the date of Notice to Proceed or the date otherwise established for the commencement of Work. This time period shall be designated the

Contract Time.

4.3 The liquidated damages incurred by the Owner due to the Contractor's failure to achieve

Substantial Completion complete the Work within the Contract Time, including any extensions thereof, shall be $413.00 per calendar day for each consecutive calendar day beyond the

Contract Time (Sundays and all holidays included) for which the Contractor shall fail to complete the Work.

mailto:vince@spohnranch.com

St. Clair Brooks Park Skatepark Construction C-4

4.4 The Contractor shall achieve Final Completion, as defined in the General Conditions, within 200 calendar days from the date of Notice to Proceed or the date otherwise established for the commencement of Work.

4.5 The liquidated damages incurred by the Owner due to the Contractor's failure achieve final completion of all Work within the time period specified in Article 4.4, including any extensions thereof, shall be $275.00 per calendar day for each consecutive calendar day (Sundays and all holidays included) for which the Contractor shall fail to achieve Final Completion of the Work.

4.6 The amount of liquidated damages set forth in Articles 4.3, and 4.5 hereinabove shall be assessed cumulatively. The basis for the assessment of liquidated damages is described in the General

Conditions.

Article 5

CONTRACT SUM

5.1 Provided that the Contractor shall strictly and completely perform all of its obligations under the

Contract Documents, and subject only to additions and deductions by Modification or as otherwise provided in the Contract Documents, the Owner shall pay to the Contractor, in current funds and at the times and in the installments hereinafter specified, the sum of:

Dollars, ($ ) (herein referred to as the "Contract Sum").

Article 6

PROGRESS PAYMENTS

6.1 The Contractor hereby agrees that on or about the first day of the month for every month during the performance of the Work he will deliver to the A/E/CM a Pay Request Application in accordance with the provisions of Article 9 of the General Conditions. This date may be changed upon mutual agreement, stated in writing, between the Owner and Contractor. Payment under this Contract shall be made as provided in the General Conditions.

St. Clair Brooks Park Skatepark Construction C-5

Article 7

OTHER REQUIREMENTS

7.1 The Contractor shall submit the Performance Bond, Labor and Material Payment Bond and

Certification of Insurance as required by the Contract Documents.

7.2 The Owner shall furnish two complete copies of all electronic drawings, specifications, and addenda to the Contractor for use in executing the work

7.3 The Contractor shall perform at least thirty percent (30%) of the total Work with forces that are in the direct employment of the Contractor's organization.

Witness the following signatures:

OWNER:

Board of Supervisors of Stafford County, Virginia

CONTRACTOR:

By: By:

Printed Name:

Printed Name:

Title:

Title:

Date:

Date: