SECTION B – BID SCHEDULE
This requirement is for one (1) Firm Fixed Price Construction contract for drilling and installing casing for one (1) new water well and testing it; installation of the pump will not be necessary. Work under this Contract is to be performed in Lake County, Oregon. The work location is shown on the drawings at T25S R16E Sec. 6 NE/SE.
ITEM NO.
ITEM DESCRIPTION
(PAY ITEM)
ESTIMATED
QUANTITY*
UNIT OF
MEASURE UNIT PRICE
TOTAL
0001 01 71 13-1 Mobilization
LS $
0002 33 21 00-1 Drill Well 300 LF $ 0003 33 21 00-2 Well
Grout/Bentonite Seal/Permit to State
LS $
0004 33 21 00-3 Supply & Install ‘6-Inch Steel Casing
280’ LF $
0005 33 21 00-4 Supply & Install 6-Inch Slotted Steel Casing
20’ LF $
0006 33 22 00-1 Well Development
LS $
0007 33 22 00-2 Furnish/Install/Remove Test Pump
LS $
0008 33 22 00-3 Pump Test LS $ 0009 33 22 00-4 Standby Time LS $
GRAND TOTAL:
ADDITIVE AND/OR DEDUCTIVE ITEMS:
ITEM NO.
ITEM DESCRIPTION
(PAY ITEM)
ESTIMATED
QUANTITY*
UNIT OF
MEASURE UNIT PRICE
TOTAL
1-Additive
Additional Drill Well, 20% Variation
360* LF $
2-Additive
Additional Drill Well, 30% Variation
390* LF $
*Estimated Quantity LS = Lump Sum LF = Linear Feet