Section 130 Bid Schedule.xlsx
XLSX spreadsheet 25 KB Posted
- Attached to
- 95th AVENUE CACHE LA POUDRE BRIDGE BID
- Solicitation number
- F25-04-025
- Issued by
- Weld County, Colorado
About this file
The file is a Bid Schedule for the 95th Avenue - Cache La Poudre Bridge Rehabilitation project issued by the City of Greeley, Colorado. The bid document (F25-04-025) outlines a comprehensive bridge rehabilitation project with 26 detailed line items, including mobilization, traffic control, bridge superstructure removal, excavation, backfill, concrete work, pavement patching, waterproofing, and bridge deck finishing. The project involves significant structural improvements, including erosion control, wildlife biologist oversight, bridge expansion device installation, reinforcing steel work, and bridge rail replacement. Quantities range from small amounts like 0.1 acres of seeding to substantial quantities such as 20,967 pounds of epoxy-coated reinforcing steel.
The bid schedule is structured with blank pricing fields, indicating that vendors are expected to complete the unit pricing and total bid amount. No specific budget or funding source is directly revealed in the document. The project appears to be a public infrastructure improvement initiative, with potential environmental considerations evidenced by native seeding, erosion control measures, and wildlife biologist involvement. Vendors are instructed to email purchasing at purchasing@greeleygov.com for bid submission, suggesting a formal electronic bidding process. The comprehensive nature of the bid schedule indicates a complex bridge rehabilitation project requiring specialized construction and engineering expertise.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| F25-04-025 - 95th Avenue - Cache La Poudre Bridge - BID.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
00130 Bid Schedule 95th Avenue – Cache La Poudre Bridge Rehabilitation
SECTION 00130
Bid Schedule
BID F25-04-025
| ITEM | DESCRIPTION | QUANTITY | UNITS | UNIT PRICE | AMOUNT |
| 1 | Mobilization | 1 | LS | $ - 0 | |
| 2 | Traffic Control | 1 | LS | $ - 0 | |
| 3 | Portable Variable Message Sign Panel | 10 | DAY | $ - 0 | |
| 4 | Removal of Bridge Superstructure | 1 | LS | $ - 0 | |
| 5 | Erosion Log | 225 | LF | $ - 0 | |
| 6 | Silt Fence | 200 | LF | $ - 0 | |
| 7 | Structure Excavation | 35 | CY | $ - 0 | |
| 8 | Structure Backfill (Class 1) | 35 | CY | $ - 0 | |
| 9 | Concrete Washout Structure | 1 | EACH | $ - 0 | |
| 10 | Vehicle Tracking Pad | 2 | EACH | $ - 0 | |
| 11 | Seeding (Native) | 0.1 | ACRE | $ - 0 | |
| 12 | Mulching | 0.1 | ACRE | $ - 0 | |
| 13 | Soil Retention Blanket | 250 | SY | $ - 0 | |
| 14 | Wildlife Biologist | 20 | HOUR | $ - 0 | |
| 15 | Hot Bituminous Pavement (Patching) 7" Thick | 75 | SY | $ - 0 | |
| 16 | PBFTG, Fabricate and Furnish | 1 | LS | $ - 0 | |
| 17 | PBFTG, Erect | 1 | LS | $ - 0 | |
| 18 | End Anchorage (Flared) | 3 | Each | $ - 0 | |
| 19 | Transition Type 3G | 3 | Each | $ - 0 | |
| 20 | Transition Type 3G (Special) | 1 | Each | $ - 0 | |
| 21 | Waterproofing (Asphalt) | 12 | SY | $ - 0 | |
| 22 | Bridge Expansion Device (2 Inch) | 34 | LF | $ - 0 | |
| 23 | Bridge Deck Finish (Sawed Grooves) | 383 | SY | $ - 0 | |
| 24 | Concrete, Class D (Bridge) | 116 | CY | $ - 0 | |
| 25 | Reinforcing Steel (Epoxy Coated) | 20,967 | LB | $ - 0 | |
| 26 | Bridge Rail Type 10 MASH | 202 | LF | $ - 0 | |
| $ - 0 | |||||
| TOTAL BID | $ - 0 |
Total Bid Written Out:
Vendor Name:
Authorized Signature: Date:
Print Name:
Phone Number: Fax Number:
Email Address:
&"Arial,Bold"SECTION 00130
BID SCHEDULE
File details come from the government source that posted it. Updated .