Seaside_Park_BID_DRAWINGS.pdf
PDF 9 MB Posted
- Solicitation number
- CMB007278
- Issued by
- Fairfield County, Bridgeport City, Connecticut
About this file
This is a bid drawing document prepared by Friar Architecture and H.F. Lenz Company for the City of Bridgeport, Connecticut's Seaside Park Restroom Improvements project, bid number CMB007278, located at 1 Barnum Dyke, Bridgeport, Connecticut 06604. The project consists of architectural, plumbing, heating, ventilation, and air conditioning (HVAC), and electrical modifications and renovations to two restroom areas designated Diamond 1 and Diamond 15. The scope of work includes demolition of existing systems, installation of new mechanical systems including toilet exhaust fans, replacement ductwork, updated plumbing and electrical installations, and finishing work to bring the facilities into compliance with 2021 International Building Code and International Mechanical Code standards. The contract drawings indicate renovation of existing construction totaling approximately 530 square feet for Diamond 1 and 616 square feet for Diamond 15, both classified as Group U occupancy with 2B construction type. Electronic bids must be submitted through the City of Bridgeport's OpenGov Procurement Portal by 2:00 pm on Tuesday, August 25, 2026, with a question submission deadline of 4:00 pm on Thursday, August 13, 2026.
The bid drawings establish comprehensive technical requirements for all trades, including detailed mechanical specifications for HVAC ductwork construction, sealing and insulation standards, flexible connectors, and system balancing procedures in accordance with SMACNA standards. Electrical work specifications require copper conductors minimum 12 AWG, rigid steel conduit or EMT installations, and compliance with the 2020 National Electrical Code, with all materials to be new and UL-approved. The contractor is responsible for all demolition and removal of existing equipment, cutting and patching of building construction, fire-stopping of penetrations, painting of structural steel and supports, testing and adjusting of systems, and instruction of operating personnel. The project requires coordination among multiple trades, pre-bid site visits for contractor familiarization with existing conditions, and submission of shop drawings, product data, and three sets of operation and maintenance manuals in PDF format prior to equipment installation. No specific contract pricing, award timeline, or funding sources are identified in the drawing document itself; these details are to be established through the competitive bidding process.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SITE LOCATION MAP
INDEX OF DRAWINGS
RE
BMUN
TES
SEASIDE PARK RESTROOM
IMPROVEMENTS
1 BARNUM DYKE,
BRIDGEPORT, CT 06604
RENOVATION
07/28/2026
ARCHITECT
FRIAR ARCHITECTURE
21 TALCOTT NOTCH ROAD
FARMINGTON, CONNECTICUT
MAYOR
Joseph P. Ganim
REFERENCE
R1.1 REFERENCE SHEET
PLUMBING
P0.2 SPECIFICATIONS - PLUMBING
P1.1 FLOOR PLANS - DIAMOND 1 PLUMBING
P1.2 FLOOR PLANS - DIAMOND 15 PLUMBING
MECHANICAL
M0.1 LEGEND, AND GENERAL NOTES - MECHANICAL
M0.2 ABBREVIATIONS- MECHANICAL
M0.3 SPECIFICATIONS - MECHANICAL
M1.1 FLOOR PLANS - DIAMOND 1 MECHANICAL
M1.2 FLOOR PLANS - DIAMOND 15 MECHANICAL
ELECTRICAL
E0.1 LEGEND, ABBREVIATIONS, AND GENERAL NOTES - ELECTRICAL
E0.2 SPECIFICATIONS - ELECTRICAL
E1.1 FLOOR PLANS - DIAMOND 1 ELECTRICAL
E1.2 FLOOR PLANS - DIAMOND 15 ELECTRICAL
ARCHITECTURE
A1.1 FLOOR PLANS - DIAMOND 1
A1.2 FLOOR PLANS - DIAMOND 15
A12.1 FINISH PLAN
DIAMOND 15
DIAMOND 1
PLUMBING & ELECTRICAL ENGINEER
H.F. LENZ COMPANY
101 CENTERPOINT DR SUITE 237
MIDDLETOWN, CT 06457
BID # CMB007278
METAL (SMALL)
METAL LATH
MARBLE
GYSUM BOARD
GRAVEL
GLAZING
GLAZED BRICK
GLASS BLOCK
FIRE BRICK
FINISHED WOOD
FACE GRAIN
FACE BRICK
FLAT METAL PANEL
SLATE, FLAGGING,
SOAPSTONE
METAL PANEL
CORRUGATED
GLASS
CERAMIC TILE
CONCRETE BLOCK
BRICK
ELEVATIONS
TERRAZZO
TERRA-COTTA
STRUCT. GLAZED
FACING TILEEARTH
CONCRETE
C.M.U.
STRUCTURAL CLAY
STEEL
SLATE, FLAGGING,
SOAPSTONE
CERAMIC TILE
CAST STONE
CARPET
SHEATHING INSUL.
RUBBLE
ROUGH WOOD
(INTERUPTED)
BRASS OR BRONZE
BITUMINOUS
BATT INSULATION
ROUGH WOOD
(CONTINUUS)
RIGID INSULATION
PLYWOOD ( SMALL)
ACOUSTICAL TILE PLASTER
ALUMINUM
ARCHITECTURAL MATERIALS
BUILDING SECTION
ARCHITECTURAL SYMBOLS
WALL SECTION
COLUMN CENTERLINE
DETAIL DESIGNATION, PLAN DETAIL,
LARGE SCALE PLANS
INTERIOR ELEVATIONS
CASEWORK ELEVATIONS
CEILING DESIGNATION
ROOM NUMBER
DOOR NUMBER
WINDOW DESIGNATION
DEMOLATION TAG
WALL TYPES
PHOTO LOCATION
REVISION NUMBER
DATUM / ELEVATION / LEVEL LINE
EXISITING CONSTRUCTION TO REMAIN
NEW STUD CONSTRUCTION
NEW CONCRETE BLOCK
NEW FACE BRICK
SOFFITS / OVERHANG ABOVE
THIS REPRESENTS A 30"X48" ADA
WHEELCHAIR CLEARANCE. IN ADDITIONIT
REPRESENTS A 30" CLEAR WIDTH.
ACCESSIBLE ELEMENT
AREA OF REFUGE WHEELCHAIR SPACE ACCESS.
CLEAR FLOOR SPACE ASSEMBLY WHEELCHAIR
SEAT 30"x48" CLEAR FLOOR SPACE
CORNER GUARD
SECTION NUMBER
SHEET NUMBER
SECTION NUMBER
SHEET NUMBER
LETTERS (HORIZ.)
SHEET NUMBER
NUMBERS (VERT.)
DETAIL NUMBER
SHEET NUMBER
ELEVATION NUMBER
ELEVATION NUMBER
CEILING TYPE (LETTER)
CEILING HEIGHT (NUMBER)
NUMBER
NUMBER/TYPE
LETTER/TYPE
NUMBER
NUMBER
PHOTO NUMBER
NUMBER
MIN.
30" CLR
M
IN
C
LR
NOTES
CONSTRUCTION NOTES
GENERAL NOTES
ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL NATIONAL, STATE AND LOCAL CODES AND ORDINANCES.
DO NOT SCALE DRAWINGS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR OBTAINING CLARIFICATION OF DIMENSIONS FROM THE
ARCHITECT BEFORE CONTINUING WITH CONSTRUCTION.
CONTRACT DRAWINGS MAY VARY FROM ACTUAL FIELD CONDITIONS. CONTRACTOR SHALL CORRECT DIMENSIONS OF ALL
MATERIALS TO CARRY OUT OF THE INTENT OF THE CONTRACT DRAWINGS. VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS IN
FIELD BEFORE ORDERING ANY MATERIALS. CONTRACTOR SHALL NOTIFY ARCHITECT PROMPTLY OF ANY CRITICAL DISCREPANCIES
BEFORE PROCEEDING WITH WORK.
ALL NEW WORK SHALL BE IMPLEMENTED SO AS TO PROVIDE A SMOOTH AND CONTINUOUS SURFACE WITH ALL EXISTING
CONDITIONS. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL WORK NECESSARY TO ACHIEVE THIS REQUIREMENT, EVEN THROUGH
PROCEDURES ARE NOT DETAILED FOR EACH SPECIFIC CONDITION OR COMBINATION OF CONDITIONS. QUALITY OF
WORKMANSHIP, MATERIALS AND FINISHES SHALL BE EQUAL TO THE LEVEL ESTABLISHED FOR SIMILAR CONSTRUCTION, EXCEPT
WHERE EXISTING APPEARANCE IS TO BE MATCHED TO ACHIEVE CONTINUITY.
CUTTING AND PATCHING SHALL BE THE RESPONSIBILITY OF THE TRADE WHOSE WORK RESULTS IN THE NEED FOR CUTTING AND
PATCHING UNLESS A SPECIFIC CONTRACTOR IS CALLED OUT ON THE DRAWINGS. ALL HOLES LEFT BY REMOVING MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT, ETC. SHALL BE PATCHED.
UNLESS OTHERWISE NOTED OR DIMENSIONED, NEW PARTITIONS SHALL BE CENTERED ON BUILDING COLUMN GRID OR WINDOW
MULLIONS.
CONTRACTOR SHALL PROVIDE WOOD BLOCKING AT WALLS AS REQUIRED TO SUPPORT SHELVES, CABINETS TV BRACKETS AND
RELATED ITEMS.
WHERE REQUIRED, SEISMIC BRACING SHALL BE PROVIDED AT SUSPENDED CEILINGS. SEE A9.X.
ALL EGRESS DOORS SHALL BE NON-LOCKING IN DIRECTION OF TRAVEL.
ALL PARTITIONS ARE TO EXTEND TO UNDERSIDE OF DECK ABOVE.
1.) DIMENSION CRITERIA
A. FROM FACE TO METAL STUD TO FACE OF METAL STUD
B. FROM FACE TO METAL STUD TO FACE OF CONCRETE MASONRY UNIT
C. FROM FACE TO CONCRETE MASONRY UNIT TO FACE OF CONCRETE MASONRY UNIT
2.) SEE FLOOR PLANS A1.1-A1.9 FOR FIRE EXTINGUISHER LOCATIONS.
3.) REFER TO SHEET R1.2 FOR WALL TYPES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
1. ALL WORK SHALL BE PERFORMED IN STRICT ACCORDANCE WITH ALL NATIONAL, STATE, LOCAL
CODES & ORDINANCES.
2. THE DEMOLITION PLANS ARE DIAGRAMMATIC AND INTENDED TO HOW THE GENERAL EXTENT OF
THE WORK ONLY. THE CONTRACTOR SHALL INCLUDE ALL DEMOLITION WORK REQUIRED TO
ACCOMPLISH THE INTENT OF THE PLANS AND SPECIFICATIONS.
3. ALL DEMOLISHED ITEMS SHALL BE REMOVED FROM BUILDING / SITE UNLESS NOTED OTHERWISE.
COORDINATE WITH OWNER FOR DELIVERY OF ITEMS NOTED TO REMAIN OWNERS PROPERTY.
THE PROJECT SITE / BUILDING SHALL BE CLEANED OF DEBRIS ON A DAILY BASIS.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR SHORING AND SUPPORT (TEMPORARY OR
PERMANENT) FOR ALL PORTIONS OF CONSTRUCTION DURING DEMOLITION AND CONSTRUCTION.
5. ALL ABANDONED MECHANICAL / ELECTRICAL / PLUMBING LINES SHALL BE CAPPED OFF BEHIND
FINISHES, UNLESS NOTED OTHERWISE. REFER TO MECHANICAL / ELECTRICAL / PLUMBING
DRAWINGS FOR ADDITIONAL INFORMATION.
6. CONTRACTOR SHALL SAWCUT ALL MASONRY OR CONCRETE OPENINGS INDICATED. MASONRY
SHALL BE TOOTHED IN AND / OR RETURNED TO FINISHED OPENING.
7. ALL OPENINGS WHERE EXISTING CONSTRUCTION HAS BEEN REMOVED, AND WHICH ARE NOT
NOTED TO REMAIN, SHALL BE FILLED AND / OR PATCHED TO MATCH THE ADJACENT EXISTING OR
NEW FINISH, INCLUDING ANY FIRE RATINGS REQUIRED.
8. ALL AREAS OF FLOORS, WALLS AND CEILINGS DISTURBED BY DEMOLITION SHALL BE FILLED, PATCHED OR OTHERWISE REFINISHED TO MATCH EXISTING OR NEW FINISH AS DESIGNATED, INCLUDING ALL REQUIRED RATINGS.
9. CONTRACTOR MUST VERIFY LOCATIONS OF ALL EXISTING STRUCTURAL, MECHANICAL, PLUMBING
& ELECTRICAL ELEMENTS PRIOR TO START OF DEMOLITION.
DEMOLITION NOTES
ABBREVIATIONS
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
ACOUSTIC TILE
AIR CONDITIONING
AIR HANDLING UNIT
ALTERNATE
ALUMINUM
ANCHOR, ANCHORAGE
ANCHOR BOLTS
ANGLE
ANODIZED
APPROVED
ARCHITECTURAL / ARCHITECT
ASBESTOS
ASPHALT
ASSEMBLY
ASSISTANT
AT
AUTOMATIC
BEAM
BEARING
BETWEEN
BEVEL / BEVELED
BITUMINOUS
BLOCK
BLOCKING
BOARD
BOTTOM OF
BOTTOM
BUILDING
BUILT-UP ROOF
CABINET UNIT HEATER
CAPACITY
CEILING
CEILING HEIGHT
CEMENT
CENTER
CENTERLINE
CERAMIC
CHALKBOARD
CHANNEL
CLOSET
COLUMN
CONFERENCE
CONTROL OR
CONSTRUCTION JOINT
CONTINUOUS
CONTRACTOR
CORRIDOR
COURSE / COURSES
DAMPPROOFING
DEGREE
DEMOLITION
DEPARTMENT
DETAIL
DIAMETER
DIMENSION
DISTANCE
DOOR
DOUBLE
DOUBLE HUNG
DOWN
DOWNSPOUT
DRAWING
DRINKING FOUNTAIN
EACH
ELECTRIC / ELECTRICAL ELECTRICAL
WATER COOLER
ELEVATION
ELEVATOR
EXISTING FIRE EXTINGUISHER
EMERGENCY
EQUAL
EQUIPMENT
EXISTING
EXISTING TO REMAIN
EXPANSION JOINT
EXTERIOR INSULATION
FINISH SYSTEM
FEET, FOOT
FINISH, FINISHED
FIRE DAMPER
FIRE EXTINGUISHER/FIRE BLANKET
CABINET
FIRE EXTINGUISHER CABINET
FIRE EXTINGUISHER & BRACKET
FIRE RETARDANT
FIREPROOFING
FIXTURE
FLASHING
FLOOR DRAIN
FLOOR FINISH
FOOTING
FOUNDATION
FUME HOOD
FURNISH / FURNISHED
FURRED / FURRING
INCH OR INCHES
INCLUDE / INCLUDING
INFORMATION
INSIDE DIAMETER
INSULATION
INTERIOR
JOINT
KICK PLATE
LABORATORY
LAVATORY
LIGHTING
MACHINE
MAINTENANCE
MANUFACTURER
MARKER BOARD
MASONRY
MASONRY OPENING
MATERIAL
MAXIMUM
MECHANICAL
METAL
MEZZANINE
MINIMUM
MISCELLANEOUS
OFFICE
ON CENTER
OPPOSITE HAND
OPENING
OUTSIDE DIAMETER
PAINTED
PAIR
PAPER TOWEL DISPENSER
PERPENDICULAR
PLASTER
PLASTIC LAMINATE
PLATE
PLUMBING
PLYWOOD
PRECAST
PREFABRICATED
PRESSURE TREATED
PROJECT, PROJECTION POINT
QUANTITY
QUARRY TILE
RADIUS
RAIN WATER LEADER
RECEIVING
REFRIGERATOR
REINFORCED / REINFORCING
REQUIRED
REVISION / REVISED
RISER
ROOF DRAIN
ROOM
SANITARY NAPKIN DISPENSER
SANITARY NAPKIN
SCHEDULE
SCUPPER
SECTION
SEISMIC JOINT
SERVICE SINK
SHEET
SHOWER/EYEWASH
SIMILAR
SOAP DISPENSER
SOUND TRANSMISSION CLASS
SPECIFICATIONS
SPLASH BLOCK
SQUARE
SQUARE INCH (S)
SQUARE YARD (S)
SQUARE FEET (FOOT)
STAINLESS STEEL
STANDARD
STEEL
STORAGE
STRUCTURAL
STRUCTURAL GLAZED
FACING TILE
STRUCTURAL STEEL
SUSPEND, SUSPENSION
SURFACE
SYSTEM
TACKBOARD
TELEPHONE
TEMPERATURE / TEMPORARY
TOUNGE & GROOVE
THRESHOLD
THICK
TOILET
TOP OF
TREAD
TYPICAL
UNDERWRITER'S LABS
UNIT HEATER
UNIT VENTILATOR
UNLESS NOTED OTHERWISE
URINAL
VENT THROUGH ROOF
VERIFY IN FIELD
VERTICAL
VINYL ASBESTOS TILE
VINYL COMPOSITION TILE
WATER CLOSET
WATERPROOFING
WELDED WIRE FABRIC
WEIGHT
WHITE BOARD
WITH
WOOD
A.F.F.
A.F.G.
AC.,A.C.T.
A.C.
A.H.U.
ALT.
ALUM.
ANCH.
ABL
ANG
ANOD.
APPD.
ARCH.
ASB.
ASPH.
ASSY.
ASST
AUTO.
BM.
BRG.
BET.
BEV.
BIT.
BLK.
BLKG.
BD.
B/O
BTM.
BLDG.
B.U.R.
C.U.H.
CAP.
CLG.
CLG.HGT.
CEM.
CTR.
CL
CT
C.BD.
CH.
CLOS.
COL
CONF.
C.J.
CONT.
CONTR.
CORR.
CRS.
DAMPR.
DEG.
DEMO.
DEPT.
DET.
DIA.
DIM.
DIST.
DR.
DBL.
D.H.
DN.
D.S.
DWG.
D.F.
EA.
ELEC.
EWC.
EL.
ELEV.
EXFE
EMG.
EQ.
EQUIP.
EXIST.
ETR.
E.J.
EXT. EIFS.
FT.
FIN.
FD.
FEB
FEC
FE
FR.
FPRFG.
FIXT.
FLASH. FL.
FD.
FLR. FIN.
FTG.
FDN.
F.H.
FURN.
FURR
IN.
INCL.
INFO.
I.D.
INSUL.
INT.
JT.
KP.
LAB.
LAV.
LTG.
MACH.
MAINT.
MFR.
MBD.
MAS.
M.O.
MATL.
MAX.
MECH.
MET.
MEZZ.
MIN.
MISC.
OFF.
O.C.
O.H.
OPG.
O.D.
PTD.
PR.
P.T.D.
PERP.
PLAS.
P.LAM.
PL.
PLBG.
PLYWD.
P.C.
PREFAB.
PROJ. PT.
P.T.
QTY.
Q.T.
RAD.
RWL.
RECV.
REF.
REINF.
REQ'D.
REV.
R
R.D.
RM.
S.N.D.
S.N.R.
SCHED.
SC.
SECT.
S.J.
S.S.
SHT.
S/E
SIM.
S.D.
S.T.C.
SPEC.
S.B.
SQ.
SQ.IN.
SQ.YD.
S.F.
ST. STL.
STD.
STL.
STOR.
STRUCT.
SGFT.
STRUCT. STL.
SUSP.
SURF.
SYS.
TBD.
TEL.
TEMP.
T & G
THLD.
THK.
TLT
T/O
T.
TYP.
U.L.
U.H.
U.V.
U.N.O.
UR.
V.T.R.
V.I.F.
VERT.
V.A.T.
V.C.T.
W.C.
W.P.
W.W.F.
WT.
WBD.
W/
WD.
PROGRESS SET
NOT FOR
CONSTRUCTION
SHEET NO.
PROFESSIONAL SEAL
21 Talcott Notch Road
Farmington, CT 06032 friar.com
860.678.1291
CONSULTANT
DATE:
SCALE
PROJ. #:
DRAWN:
CHECKED:
7/28/2026 2:35:50 PM
As indicated
R1.1
REFERENCE SHEET
SEASIDE PARK RESTROOM
IMPROVEMENTS
BID #CMB007278
1 Barnum Dyke, Bridgeport, CT 06604
BKH
RWR
2026-037A
07/28/2026
SYMBOL LEGEND
REVISIONS
NO. DATE DESCRIPTION
07/28/2026 ISSUE FOR BID
Existing Construction
Total Floor New Construction
(First)
3. BUILDING HEIGHT (Chapter 5)
4. BUILDING AREA (Chapter 5) Building Area:
Actual Height (story/feet) (Stories Above Grade)
Allowable Height (story/feet)
Date of Original Construction
1. GROUP CLASSIFICATION
2. CONSTRUCTION TYPE (Chapter 6)
(new) Actual Type Provided: (existing) Minimum Type Required:
(Primary) (Incidental)
Renovation
U
-1973
CODE INFORMATION - DIAMOND 1
N/A
2B 2B
N/A
2 STORIES / 55 FEET
1 STORY / 24 FEET
N/A s.f.
s.f.
s.f.
14. CODES TO WHICH THIS PROJECT WAS DESIGNED Dated:
13. SPRINKLER PROTECTION
Limited Area
Entire Building
2021 International Building Code *
2021 International Mechanical Code *
2021 International Plumbing Code *
2021 International Energy Conservation Code *
2019 Installation of Sprinkler Systems (NFPA 13)
2021 Life Safety Code (NFPA 101) *
2021 Fire Code (NFPA 1) *
2021 International Residential Code *
2021 International Existing Building Code *
2017 Accessible and Usable Buildings and Facilities (ICC A117.1-2017)*
2020 National Electrical Code (NFPA 70)*
2021 International Fire Code *
2021 International Swiming Pool & Spa Code *
* With Connecticut Amendments and General Statute requirements
Existing Construction
Total Floor New Construction
(First)
3. BUILDING HEIGHT (Chapter 5)
4. BUILDING AREA (Chapter 5) Building Area:
Actual Height (story/feet) (Stories Above Grade)
Allowable Height (story/feet)
Date of Original Construction
1. GROUP CLASSIFICATION
2. CONSTRUCTION TYPE (Chapter 6)
(new) Actual Type Provided: (existing) Minimum Type Required:
(Primary) (Incidental)
Renovation
U
-1973
CODE INFORMATION - DIAMOND 15
N/A
2B 2B
N/A
2 STORIES / 55 FEET
1 STORY / 24 FEET
N/A s.f.
s.f.
s.f.
14. CODES TO WHICH THIS PROJECT WAS DESIGNED Dated:
13. SPRINKLER PROTECTION
Limited Area
Entire Building
2021 International Building Code *
2021 International Mechanical Code *
2021 International Plumbing Code *
2021 International Energy Conservation Code *
2019 Installation of Sprinkler Systems (NFPA 13)
2021 Life Safety Code (NFPA 101) *
2021 Fire Code (NFPA 1) *
2021 International Residential Code *
2021 International Existing Building Code *
2017 Accessible and Usable Buildings and Facilities (ICC A117.1-2017)*
2020 National Electrical Code (NFPA 70)*
2021 International Fire Code *
2021 International Swiming Pool & Spa Code *
* With Connecticut Amendments and General Statute requirements
FLOW CONTROL DEVICE/BALANCING VALVE
INDICATES NOTES ELSEWHERE ON DRAWING1
ROUND DUCT (DIAMETER)
DUCT (SHOWN x HIDDEN)
DUCT TRANSITION
VOLUME DAMPER
VD
10Ø
RADIUS ELBOW
SUPPLY AIR DUCT SECTION
RETURN AIR DUCT SECTION
ROUND DUCT SECTION
SQUARE ELBOW WITH TURNING VANES
EXHAUST AIR DUCT SECTION
THERMOSTAT, ELECTRONIC
CONNECTION BETWEEN NEW AND EXISTING
FLEXIBLE DUCTWORK
MECHANICAL GENERAL NOTES
1. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE OTHER CONTRACTORS IN THE LOCATION OF THEIR
SCOPE OF WORK AND WITH THE OTHER CONTRACTORS' UTILITIES AND SCOPE OF WORK.
2. THE MECHANICAL CONTRACTOR SHALL VISIT AND THOROUGHLY ACQUAINT THEMSELVES WITH THE EXISTING SYSTEM AND CONDITIONS IN THE AREAS THEY WILL BE REQUIRED TO WORK BEFORE ISSUING THEIR BID.
3. THE MECHANICAL CONTRACTOR SHALL PAY FOR ALL FEES AND PERMITS AS NECESSARY TO COMPLETE THE
INSTALLATION.
4. ALL INTERRUPTIONS OF EXISTING SYSTEMS SHALL BE SCHEDULED IN A MINIMUM OF 7 DAYS IN ADVANCE WITH THE
OWNER AND APPROVED BEFORE WORK COMMENCES.
5. CONNECTIONS TO BUILDING STRUCTURE SHALL BE REVIEWED BY PROJECT STRUCTURAL ENGINEER PRIOR TO
INSTALLATION.
6. DO NOT SCALE DRAWINGS - ALL DIMENSIONS AND EXISTING CONDITIONS SHALL BE CHECKED AND VERIFIED BY THE
CONTRACTOR AT THE SITE. NOTIFY ENGINEER OF ANY DEVIATIONS FROM THE DRAWINGS.
7. THE DRAWINGS ARE DIAGRAMMATIC AND SHOW ONLY THE GENERAL ARRANGEMENTS OF ALL PIPING AND EQUIPMENT.
BECAUSE OF THE SMALL SCALE OF THE DRAWINGS, IT IS NOT POSSIBLE TO SHOW OR INDICATE ALL OFFSETS, FITTINGS, AND ACCESSORIES WHICH MAY BE REQUIRED TO INSTALL A COMPLETE SYSTEM, AND TO AVOID EXISTING PIPING OR STRUCTURAL FEATURES. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE IN THIS CONTRACT TO PROVIDE ALL
OFFSETS, FITTINGS, AND ACCESSORIES FOR A COMPLETE WORKING SYSTEM.
8. ALL WORK PERFORMED SHALL BE IN COMPLIANCE WITH ALL CURRENT APPLICABLE CODES, RULES, REGULATIONS, ORDINANCES, AND DIRECTIONS FROM THE LOCAL, STATE, AND NATIONAL GOVERNING AUTHORITIES HAVING
JURISDICTION.
9. REPORT ANY DISCREPANCIES FOUND IN THE DRAWINGS AND/OR IN THE SPECIFICATIONS DURING THE BIDDING PROCESS FOR CLARIFICATION BY THE ENGINEER. WHEN A CONFLICT EXISTS BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, THE MECHANICAL CONTRACTOR SHALL CARRY THE MOST EXPENSIVE OPTION IN THEIR BID AND
BUDGET.
10. MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL ACCESS PANELS AS REQUIRED FOR ACCESS TO ANY MECHANICAL EQUIPMENT INCLUDING VALVES, TRAPS, CLEAN-OUTS, CONTROLS, DAMPERS, ETC., WHETHER INDICATED ON DRAWINGS OR NOT. THE CONTRACTOR SHALL COORDINATE INSTALLATION OF ACCESS PANELS WITH THE
ENGINEER AND ALL OTHER TRADES.
11. THE MECHANICAL CONTRACTOR SHALL FURNISH SHOP DRAWINGS OF ANY RELOCATED PIPING, DUCTWORK, EQUIPMENT, ETC. FOR APPROVAL PRIOR TO RELOCATION.
12. ALL PIPING AND DUCTWORK TO BE LOCATED AND COORDINATED WITH ENGINEERING PLANS AND ALL OTHER TRADES.
13. ALL PIPING AND DUCTWORK SHALL BE CONCEALED IN FINISHED AREA UNLESS OTHERWISE SPECIFIED.
14. ALL PIPE PENETRATIONS THROUGH FIRE-RATED CHASES, WALLS, OR FLOORS SHALL BE PROPERLY SEALED AND
FIRESTOPPED TO MAINTAIN FIRE PROTECTION. MECHANICAL CONTRACTOR SHALL SUBMIT PROPOSED UL
FIRESTOPPING SYSTEM FOR REVIEW.
15. MECHANICAL CONTRACTOR SHALL PROVIDE CODE REQUIRED LIFE SAFETY DAMPERS FOR ALL DUCT PENETRATIONS THROUGH LIFE SAFETY/FIRE RATED CHASES, WALLS, OR FLOORS WHETHER OR NOT THEY ARE SPECIFICALLY SHOWN
ON THE DRAWINGS.
16. ALL PIPING, CONDUIT, DUCTWORK, ETC., SHALL BE INSTALLED IN A MANNER WHICH WILL NOT DEFACE OR ALTER ANY AREAS. ROUTING OF THE ABOVE EQUIPMENT SHALL BE APPROVED BY THE ENGINEER PRIOR TO INSTALLATION.
17. ANY PHYSICAL INSTALLATION MODIFICATION ISSUES DUE TO FIELD CONDITIONS SHALL BE RESOLVED BY THE MECHANICAL CONTRACTOR WITH REVIEW BY THE ENGINEER AND OWNER PRIOR TO INSTALLATION. THE MECHANICAL CONTRACTOR SHALL RELOCATE EXISTING SYSTEMS TO ACCOMMODATE NEW WORK WHERE CONFLICTS WITH NEW
WORK EXIST.
18. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE LOCATION OF DUCTWORK WITH ALL EXISTING PIPING AND
NEW PIPING BEING PROVIDED.
19. ALL PIPING AND DUCTS IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN FURRED CHASES OR ABOVE CEILING. ALL DUCTWORK AND PIPING SHALL BE INSTALLED AS HIGH AS POSSIBLE ABOVE CEILING OR FLOOR, UNLESS
NOTED OTHERWISE.
20. ALL LIGHT LINEWEIGHTS SHOWN ON DRAWINGS INDICATE EXISTING EQUIPMENT, EXISTING CONSTRUCTION, OR ITEMS TO REMAIN. ALL HEAVY LINEWEIGHTS, OR CROSS-HATCHED LINES, ON DEMOLITION DRAWINGS INDICATE EXISTING EQUIPMENT OR ITEMS TO BE DEMOLISHED. ALL HEAVY LINEWEIGHTS ON NEW WORK DRAWINGS INDICATE NEW
EQUIPMENT, SYSTEMS, AND ITEMS TO BE PROVIDED BY THE MECHANICAL CONTRACTOR.
21. HVAC SYSTEMS PROVIDED BY THIS PROJECT SHALL BE COMMISSIONED IN ACCORDANCE WITH THE CURRENT
APPLICABLE ENERGY CONSERVATION CODE AND THE PROJECT MANUAL.
SYSTEM USE
EXTENT
OF DUCT
WORK
SMACNA CLASSES
UPSTREAM OF
VAV BOXES ALL +2"
DUCT CONSTRUCTION CLASSES
SUPPLY
ALL
PRESSURE
(IN WG) SEAL
EXHAUST
DOWNSTREAM
OF VAV BOXES
A
+2"
-4"
-2"
B
A
A
ALL
ALL
ALL
ALL
NOTES:
1. REFER TO CONSTRUCTION DOCUMENTS FOR ADDITIONAL
DUCT CONSTRUCTION INFORMATION.
RETURN
-2" BALLALL
OUTDOOR AIR
INTAKE
SUPPLY DIFFUSER, 4-WAY THROW
UNLESS NOTED OTHERWISE
1. DO NOT SCALE DRAWINGS.
2. ALL WORK PERFORMED ON THIS BUILDING SHALL BE IN COMPLIANCE WITH ALL CURRENT APPLICABLE CODES, RULES, ORDINANCES AND REGULATIONS OF THE LOCAL AND STATE GOVERNING AUTHORITIES.
3. ALL WORK PERFORMED AND IN CONNECTION WITH THESE DRAWINGS AND SPECIFICATIONS SHALL BE IN STRICT COMPLIANCE WITH THE LATEST OSHA SAFETY AND HEALTH STANDARDS MLS ELEC. SAFETY HANDBOOK #GS-11294.
4. THESE DRAWINGS DO NOT REVEAL ALL CONDITIONS THAT EXIST ON THE SITE. SHOULD CONDITIONS BE FOUND TO VARY SUBSTANTIALLY FROM THIS REPORT, CHANGES IN THE WORK WILL BE MADE WITH RESULTING CREDITS OR
EXPENDITURES TO THE CONTRACT SUM ACCRUING TO THE OWNER.
5. THE DRAWINGS INDICATE THE GENERAL LAYOUT AND DO NOT NECESSARILY REPRESENT A COMPLETE FIELD VERIFIED LAYOUT. THE MAJORITY OF MECHANICAL ITEMS ARE SHOWN ON THE DRAWINGS. CERTAIN ITEMS ARE SHOWN AND INDICATED TO REMAIN OR BE REMOVED. THE DETAILS OF MECHANICAL DEMOLITION MAY BE DESCRIBED BY NOTES. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS WITHIN THE DEMOLITION AREAS. REPORT ANY DISCREPANCIES FOUND TO THE CONSTRUCTION MANAGER FOR CLARIFICATION BEFORE
PROCEEDING.
6. ALL MECHANICAL AND ELECTRICAL EQUIPMENT, PIPING, DUCTWORK, CONDUIT, WIRING, ETC., INDICATED ON THE DRAWINGS DESCRIBED IN THE NOTES AND WHICH IS NOT REQUIRED TO FUNCTION AS PART OF THE FINAL SYSTEM, SHALL BE CAPPED, SEALED, AND ABANDONED IN PLACE. ANY REMOVED MATERIAL, UNLESS DESIGNATED FOR SALVAGE, SHALL BE IMMEDIATELY REMOVED FROM THE SITE AND DISPOSED OF IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL CODES AND REGULATIONS. SALVAGED ITEMS SHALL BE STORED ON SITE IN A
LOCATION DESIGNATED BY THE OWNER.
7. WHERE IT BECOMES NECESSARY TO TEMPORARILY DISTURB SYSTEMS TO PERMIT EXECUTION OF THE DEMOLITION PROCESS, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE OWNER TO SCHEDULE A SHUTDOWN. THE DEMOLITION CONTRACTOR SHALL GIVE A MINIMUM OF 7 DAYS ADVANCE NOTICE FOR ANY SUCH GIVEN SHUTDOWN. IF THE SHUTDOWN INCLUDES MAJOR SYSTEMS, SUCH AS DOMESTIC FEED, STEAM, ELECTRICAL
QMB PANELS, ETC., TWO-WEEK NOTICE SHALL BE REQUIRED.
8. ALL EXISTING EXTERIOR WALLS AND SURFACES (EXCLUSIVE OF FURRED AREAS), SHAFT WALLS, WALLS ADJACENT
TO A DEMOLITION AREA TO REMAIN, SHALL BE PROTECTED FROM DAMAGE AND UNDISTURBED.
9. THE CONTRACTOR SHALL SCHEDULE HIS WORK WITH THE CONSTRUCTION MANAGER IN ORDER TO HAVE THE JOB REPRESENTATIVE DISCONNECT AND RECONNECT ALL CIRCUITS ASSOCIATED WITH THE FIRE SUPPRESSION SYSTEM.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER OF ANY CONFLICTS WITH ANY LIFE SAFETY SYSTEM ON ELEMENTS
THAT ARE INDICATED TO BE REMOVED.
10. ALL BUILDING AUTOMATION SYSTEM CONTROL PANELS, RISERS, AND ACCESSORIES, ETC., AND ALL PNEUMATIC AND/OR ELECTRIC CONTROL PANELS, RISERS, ACCESSORIES, ETC., ARE TO REMAIN INTACT, AND IN PROPER OPERATING CONDITION DURING THE ENTIRE DEMOLITION PROCESS, UNLESS NOTED OTHERWISE ON THE
DRAWINGS.
11. THE CONTRACTOR SHALL INCLUDE IN HIS BID THE COST OF DISCONNECTING AND REMOVING ALL MECHANICAL EQUIPMENT, BOILERS, PIPING, LOUVERS, DUCTWORK, GRILLES, CONTROLS, ETC., IDENTIFIED FRO DEMOLITION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REMOVAL AND CLEANUP OF ALL DEBRIS ASSOCIATED WITH THE DEMOLITION OF MECHANICAL ITEMS. HE SHALL REFER TO THE ENGINEER'S PHASING PLAN FOR THE SCHEDULING
OF HIS WORK.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND PAINTING ALL REMAINING OPENINGS IN THE INTERIOR WALLS, FLOORS, AND CEILING. THE GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING, ETC., OF ALL REMAINING OPENINGS THROUGH EXTERIOR WALLS AND ROOF. WHERE DEMOLITION OF EXISTING CONSTRUCTION AND/OR EQUIPMENT OCCURS, PATCH AND REPAIR FLOOR, WALL AND CEILING CONSTRUCTION
AND/OR FINISHES TO MATCH ADJACENT CONSTRUCTION AND/OR FINISHES.
13. IF DURING THE COURSE OF DEMOLITION, EXISTING UTILITIES ARE ENCOUNTERED, WORK IN THAT AREA IS TO BE HALTED UNTIL THE STATUS OF THE UTILITIES HAS BEEN ASCERTAINED BY THE OWNER AND/OR ENGINEER AND
AUTHORITY TO PROCEED GIVEN BY THE OWNER.
14. ALL CUTTING, DEMOLITION AND PATCHING OF EXISTING AND/OR NEW CONSTRUCTION OR EQUIPMENT IS TO BE PERFORMED BY THE CONTRACTOR WHO IS TO SUPPLY AND INSTALL THE NEW CONSTRUCTION AND/OR EQUIPMENT.
MECHANICAL DEMOLITION GENERAL NOTES
ECCENTRIC REDUCER
TEE, BRANCH DOWN
DROP IN PIPE
12x8
VALVE, SEE SPECIFICATIONS FOR TYPE
RISE IN PIPE
ELBOW DOWN
ELBOW UP
TEE, BRANCH UP
PRESSURE TEMPERATURE TAP
UNION
WYE STRAINER
3-WAY CONTROL VALVE, ELECTRIC
AIR VENT WITH COCK
DIRECTION OF FLOW
SYMBOLS:
T
UNION OR FLANGE
3-WAY CONTROL VALVE, ELECTRIC
AIR VENT WITH COCK
2-WAY CONTROL VALVE, ELECTRIC
B
M
M
ISOLATION VALVE (SEE SPEC FOR TYPE)
SYMBOLS AND NOTES FORM A STANDARD SCHEDULE OF SYMBOLS AND NOTES. CERTAIN SYMBOLS INDICATED MAY NOT APPEAR ON THE DRAWINGS. CERTAIN NOTES MAY NOT APPLY BASED ON SCOPE OF PROJECT.1.
SYMBOLS & GENERAL NOTES
NOTES:
PROGRESS SET
NOT FOR
CONSTRUCTION
SHEET NO.
PROFESSIONAL SEAL
21 Talcott Notch Road Farmington, CT 06032 friar.com 860.678.1291
CONSULTANT
DATE:
SCALE
PROJ. #:
DRAWN:
CHECKED:
As indicated
SEASIDE PAR< RESTROOD
IDPROsEDENTS
1 Barnum Dyke, Bridgeport, CT 06604
2026-037A
07/13/2026
REVISIONS
NO. DATE DESCRIPTION
H.F. Lenz Company 101 Centerpoint Drive, Suite 237 Middletown, CT 06457
P: 203.316.2124 www.hflenz.com
LEGEND, AND
GENERAL NOTES -
MECHANICAL
M0.1
BID #MNX007278
REVISIONS
NO. DATE DESCRIPTION
07/28/2026 ISSUE FOR BID
BID #CMB007278
AAV AUTOMATIC AIR VENT
ABV ABOVE
ACC AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
AFF ABOVE FINISHED FLOOR
AFM AIR FLOW MONITOR
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AL ACOUSTIC LINING
ALUM ALUMINUM
AO ANALOG OUTPUT
AP ACCESS PANEL
APPROX APPROXIMATELY
AS AIR SEPARATOR
ASSOC ASSOCIATED
AUTO AUTOMATIC
AUX AUXILIARY
AVG AVERAGE
AWT AVERAGE WATER TEMPERATURE
B BOILER
BAL BALANCING VALVE
BAS BUILDING AUTOMATION SYSTEM
BASC BUILDING AUTOMATION SYSTEM CONTRACTOR
BB BASEBOARD
BC BALANCING COCK
BD BLOW DOWN
BDD BACKDRAFT DAMPER
BFV BUTTERFLY VALVE
BHP BRAKE HORSEPOWER/BOILER HORSEPOWER
BI BINARY INPUT
BJ BALL JOINT
BMS BUILDING MANAGEMENT SYSTEM
BLDG BUILDING
BLR BOILER
BLW BELOW
BO BLOW OFF/BINARY OUTPUT
BT BUFFER TANK
BTM BOTTOM
BTUH BRITISH THERMAL UNIT PER HOUR
BTWN BETWEEN
BV BALL VALVE
C CONVECTOR
CA COMPRESSED AIR
CAP CAPACITY
CB CIRCUIT BREAKER
CC COOLING COIL
CCW COUNTER CLOCKWISE
CDL CONDENSATE DRAIN LINE
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CH CHILLER
CH4 METHANE
CHAR CHARACTERISTIC
CHKV CHECK VALVE
CHWR CHILLED & HOT WATER RETURN
CHWS CHILLED & HOT WATER SUPPLY
CHWS&R CHILLED & HOT WATER SUPPLY AND RETURN
CIRC CIRCULATING
CI CAST IRON
CKT CIRCUIT
CLG CEILING
CLK TIME CLOCK
C/L CENTER LINE
CMU CONCRETE MASONRY UNIT
CNTR CONTROLLER
CO CLEAN OUT/CARBON MONOXIDE
COL COLUMN
COMB COMBINATION
COMP COMPRESSOR
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION
CONTR CONTRACTOR
CONV CONVECTOR/CONVERTOR
CONST CONSTRUCTION
COP COEFFICIENT OF PERFORMANCE
CORR CORRIDOR
CPA CONTROL POINT ADJUSTMENT
CRT CATHODE RAY TUBE
CS CURRENT SENSOR
CT COOLING TOWER
CU COMPUTER ROOM AIR CONDITIONER
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
Cv VALVE COEFFICIENT
CVB CONSTANT VOLUME BOX
CW COLD WATER/CLOCKWISE
CWR CONDENSER WATER RETURN
CWS CONDENSE WATER SUPPLY
CWS&R CONDENSER WATER SUPPLY AND RETURN
D DEEP, DEPTH
DA DAMPER ACTUATOR
DAT DISCHARGE AIR TEMPERATURE
DB DRY BULB TEMPERATURE, °F
DC DIRECT CURRENT
DDC DIRECT DIGITAL CONTROL
DEMO DEMOLITION
DIA DIAMETER
DIFF DIFFUSER
DISCH DISCHARGE
DHW DOMESTIC HOT WATER
DG DUCT DISPERSION GRID
DN DOWN
DP DIFFERENTIAL PRESSURE
DPC DIFFERENTIAL PRESSURE CONTROLLER
DPI DIFFERENTIAL PRESSURE INDICATOR (GAUGE)
DPR DAMPER
DPS DIFFERENTIAL PRESSURE SWITCH
DPT DEW POINT TEMPERATURE, °F
DR DRAIN
DWH DOMESTIC WATER HEATER
DX DIRECT EXPANSION
EA EXHAUST AIR
EA. EACH
EAT ENTERING AIR TEMPERATURE, °F
EC ELECTRICAL CONTRACTOR
ECC ENGINEERING CONTROL CENTER
ECON ECONOMIZER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
EL EXPANSION LOOP
ELECT ELECTRIC
ELEV ELEVATION
EMS ENERGY MANAGEMENT SYSTEM
ENCL ENCLOSURE
ENT ENTERING
EQUIP EQUIPMENT
ER ECCENTRIC REDUCER (BOTTOMS FLAT)
ERC EXHAUST REGISTER CEILING
ERW EXHAUST REGISTER WALL
ES END SWITCH
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
ETR EXISTING TO REMAIN
EWT ENTERING WATER TEMPERATURE, °F
°F, DEG F DEGREES FAHRENHEIT
FA FREE AREA
FB FREE BLOW
F&T FLOAT AND THERMOSTATIC TRAP
FAT FINAL AIR TEMPERATURE, °F
FC FLEXIBLE CONNECTION
FCD FLOW CONTROL DEVICE
FCU FAN COIL UNIT
FD FIRE DAMPER/FLOOR DRAIN
FDN FOUNDATION
FF FOULING FACTOR
FIN FINISHED
FLA FULL LOAD AMPS
FLG FLANGE
FLR FLOOR
FNL FUNNEL
FO FLAT OVAL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOS&R FUEL OIL SUPPLY AND RETURN
FOV FUEL OIL VENT
FPB FAN POWERED BOX
FPM FEET PER MINUTE
FPS FEET PER SECOND
FR FROM
FS FLOW SWITCH
FSD FIRE SMOKE DAMPER
FSP FINAL STATIC PRESSURE
FT FEET
FTG FITTING
FTR FINNED TUBE RADIATION
FURN FURNISH
FV FACE VELOCITY
FW FEED WATER
FZ FREEZE STAT
G GAS
GA GAUGE, GAGE
GALV GALVANIZED
GC GENERAL CONTRACTOR
GLV GLOBE VALVE
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GR GRILLE
GRAV GRAVITY
GRV GRAVITY ROOF VENTILATOR
GV GATE VALVE
H HEIGHT/HEATER
HC HEATING CONTRACTOR/HEATING COIL
HD HEAD
HG MERCURY
HGR HANGER
HL HIGH LIMIT
HOA HANDS-OFF-AUTOMATIC
HORIZ HORIZONTAL
HP HORSEPOWER/HEAT PUMP
HPD HIGH PRESSURE DRIP
HPR HIGH PRESSURE RETURN
HPS HIGH PRESSURE STEAM
HR HOUR
HS MANUAL SWITCH
HTR HEATER
HTG HEATING
HUH HORIZONTAL UNIT HEATER
HUM HUMIDIFIER
HV HIGH VELOCITY
HVAC HEATING, VENTILATING, AND AIR CONDITIONING
HW HOT WATER
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY AND RETURN
HZ HERTZ
ID INSIDE DIAMETER
IE INVERT ELEVATION
IER INVERTED ECCENTRIC REDUCER (TOPS FLAT)
ILF IN LINE FAN
IN INCHES
IN WG INCHES OF WATER GAGE PRESSURE (EQUIVALENT IN WC)
IN WC INCHES OF WATER COLUMN PRESSURE (EQUIVALENT IN WG)
INV INVERT
INSUL INSULATION
IPS IRON PIPE SIZE
IRI INDUSTRIAL RISK INSURANCE
ISP INITIAL STATIC PRESSURE
IVS ISOLATION VALVE STATION
JB JUNCTION BOX
JT JOINT
KEM KITCHEN EQUIPMENT MANUFACTURER
KHE KITCHEN HOOD EXHAUST
KHS KITCHEN HOOD SUPPLY
KW KILOWATT
KWH KILOWATT HOUR
L LENGTH
L1, L2, N POWER LINES AND NEUTRAL
L&I LABOR AND INDUSTRY
LAT LEAVING AIR TEMPERATURE, °F
LBS POUNDS
LBS/HR POUNDS PER HOUR
LF LINEAR FEET
LI LEVEL INDICATOR
LL LOW LIMIT
LP LOW PRESSURE
LPD LOW PRESSURE DRIP
LPG LIQUID PETROLEUM GAS
LPR LOW PRESSURE RETURN
LPS LOW PRESSURE STEAM
LRA LOCK ROTOR AMPS
LS LEVEL SWITCH
LTG LIGHTING
LTU LOCAL TERMINAL UNIT
LV LOW VELOCITY
LVG LEAVING
LWCO LOW WATER CUTOFF
LWT LEAVING WATER TEMPERATURE, °F
M MOTORIZED ACTUATOR
MA MILLIAMP
MAN MANUAL
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH THOUSAND BTUH
MC MECHANICAL CONTRACTOR
MCC MOTOR CONTROL CENTER
MECH MECHANICAL
MER MECHANICAL EQUIPMENT ROOM
MFG MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MOD MOTOR OPERATED DAMPER
MOI MAGNETIC STARTER HOLDING COIL
MPD MEDIUM PRESSURE DRIP
MPR MEDIUM PRESSURE RETURN
MPS MEDIUM PRESSURE STEAM/MINIMUM POSITION SWITCH
MS MOTOR STARTER
MTD MOUNTED
MTG MOUNTING
MTL METAL
MTR MOTOR
MWT MEAN WATER TEMPERATURE, °F
N/A NOT APPLICABLE
NC NORMALLY CLOSED/NOISE CRITERIA
NEG NEGATIVE
NIC NOT IN CONTRACT
NO NORMALLY OPEN
No NUMBER
NOM NOMINAL
NTS NOT TO SCALE
NWL NORMAL WATER LEVEL
OA OUTDOOR AIR
OAT OUTDOOR AIR TEMPERATURE
OC ON CENTER
OCC OCCUPIED
OD OUTER DIAMETER
ODS OXYGEN DEPRIVATION SENSOR
OL OVERLOAD
OPER OPERATED
OPNG OPENING
OPP OPPOSITE
OSV OIL SAFETY VALVE
OUT OUTPUT
OVF OVERFLOW
OZ OUNCE
P PUMP
PCHWP PRIMARY CHILLED WATER PUMP
PCHWR PRIMARY CHILLED WATER RETURN
PCHWS PRIMARY CHILLED WATER SUPPLY
PD PRESSURE DROP/PUMP DISCHARGE
PE PNEUMATIC - ELECTRIC
PG PRESSURE GAUGE WITH COCK
PH PHASE
PHWP PRIMARY HOT WATER PUMP
PHWR PRIMARY HOT WATER RETURN
PHWS PRIMARY HOT WATER SUPPLY
PI PRESSURE INDICATOR (GAUGE)
PL PILOT LIGHT
PNEU PNEUMATIC
PNL PANEL
POP PILOT OPERATED POSITIONER
PP POSITIVE POSITIONER
PPD PERFORATED PLATE DAMPER
PR PANEL RADIATOR
PRESS PRESSURE
PRV POWER ROOF VENTILATOR/PRESSURE REDUCING VALVE
PS PIPE SUPPORT
PSIG POUNDS PER SQUARE INCH GAGE
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PT PRESSURE/TEMPERATURE TAP
PTAC PACKAGED TERMINAL AIR CONDITIONER
PV PROCESS VARIABLE
QTY QUANTITY
R RELAY
RA RETURN AIR
RE, ReA RELIEF AIR
RAD RADIATOR
RAF RETURN AIR FIXTURES
RC RECEIVER-CONTROLLER
RCP RADIANT CEILING PANEL
REC RECESSED
REFRIG REFRIGERANT
REG REGISTER
REINF REINFORCED
REQD REQUIRED
RET RETURN
REV REVISION/REVERSE ACTING
RF RETURN/RELIEF FAN
RGC RELIEF/RETURN GRILLE CEILING
RGCP RELIEF/RETURN GRILLE CEILING PERFORATED
RGW RELIEF/RETURN GRILLE WALL
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID
RLA RUNNING LOAD AMPS
RM ROOM
RPM REVOLUTIONS PER MINUTE
RRC RETURN REGISTER CEILING
RRCP RETURN REGISTER CEILING PERFORATED
RRW RETURN REGISTER WALL
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
RV RELIEF VALVE
RWC RAIN WATER CONDUCTOR
S&B SINK AND BUBBLER
S/S START/STOP
SA SUPPLY AIR
SB SOOT BLOWER
SBD SURFACE BLOW DOWN
SCHWP SECONDARY CHILLED WATER PUMP
SCHWR SECONDARY CHILLED WATER RETURN
SCHWS SECONDARY CHILLED WATER SUPPLY
SD SMOKE DETECTOR
SDCL SUPPLY DIFFUSER CEILING LINEAR
SDC-( ) SUPPLY DIFFUSER CEILING - (THROWS)
SDCP-( ) SUPPLY DIFFUSER CEILING PERFORATED - (THROWS)
SDCR SUPPLY DIFFUSER CEILING ROUND
SDPR SMOKE DAMPER
SENS SENSIBLE
SEP SEPARATOR
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHLD SUNSHIELD
SHP STRIP HEATING PANEL
SHT SHEET
SHWP SECONDARY HOT WATER PUMP
SHWR SECONDARY HOT WATER RETURN
SHWS SECONDARY HOT WATER SUPPLY
SP STATIC PRESSURE (INCHES OF WATER)
SPEC SPECIFICATION
SPGR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ SQUARE
SQFT SQUARE FEET
SRW SUPPLY REGISTER WALL
SS STAINLESS STEEL
ST SPACE TEMPERATURE
STD STANDARD
STL STEEL
STR STRAINER
STRUCT STRUCTURAL
SUP SUPPLY
SV SAFETY VALVE
SW SWITCH
T THERMOSTAT
TA THROW AWAY
TBD TO BE DETERMINED
TC TEMPERATURE CONTROLLER
TCV TEMPERATURE CONTROL VALVE
TD TEMPERATURE DIFFERENCE
TDV TRIPLE DUTY VALVE
TEMP TEMPERATURE
TGC TRANSFER GRILLE CEILING
TGCP TRANSFER GRILLE CEILING PERFORATED
TGW TRANSFER GRILLE WALL
TH THERMOMETER
THK THICK
TI TEMPERATURE INDICATOR
TK TANK
TOT TOTAL
TRANS TRANSITION
TS TIP SPEED, TEMPERATURE SENSOR (SPACE)
TSL LOW TEMPERATURE PROTECTION
TSP TOTAL STATIC PRESSURE/TEMPERATURE-SETPOINT DEVICE
TSTAT THERMOSTAT
TT THERMOSTATIC TRAP/TEMPERATURE SENSOR
TV TURNING VANES
TYP TYPICAL
UC UNDERCUT
UG UNDERGROUND
UH UNIT HEATER
UNOCC UNOCCUPIED
UV UNIT VENTILATOR
V VOLTAGE, VALVE
VA VENTILATION AIR
VAC VACUUM
VAV VARIABLE AIR VOLUME
VCD VOLUME CONTROL DAMPER (MANUAL)
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VFS VENTURI FLOW STATION
VTR VENT THROUGH ROOF
VUH VERTICAL UNIT HEATER
VVB VARIABLE VOLUME BOX
W WIDTH
W/ WITH
W/O WITHOUT
Wb WET BULB TEMPERATURE, °F
WC WATER COLUMN
WCCU WATER COOLED CONDENSING UNIT
WG WATER GAUGE
WH WALL HEATER
WL WATER LEVEL
WP WEATHERPROOF
WT WEIGHT
WTD WATER TEMPERATURE DROP, °F
X1, X2 TRANSFORMER SECONDARY TERMINALS
XT EXPANSION TANK
Z ZONE
ZCV ZONE CONTROL VALVE
HVAC ABBREVIATIONS
PROGRESS SET
NOT FOR
CONSTRUCTION
SHEET NO.
PROFESSIONAL SEAL
21 Talcott Notch Road Farmington, CT 06032 friar.com 860.678.1291
CONSULTANT
DATE:
SCALE
PROJ. #:
DRAWN:
CHECKED:
As indicated
SEASIDE PAR< RESTROOD
IDPROsEDENTS
1 Barnum Dyke, Bridgeport, CT 06604
2026-037A
07/13/2026
REVISIONS
NO. DATE DESCRIPTION
H.F. Lenz Company 101 Centerpoint Drive, Suite 237 Middletown, CT 06457
P: 203.316.2124 www.hflenz.com
ABBREVIATIONS -
MECHANICAL
M0.2
BID #MNX007278
REVISIONS
NO. DATE DESCRIPTION
HVAC SPECIFICATIONS
GENERAL
Furnish labor, materials, tools, scaffolding and equipment necessary for the work included under this Contract. Work shall be completed and equipment installed in strict accordance with applicable local, state and federal laws, ordinances and regulations. Fees, permits and certificates shall be obtained and satisfied by this Contractor. Work shall comply with the 2021 International Building Code and International Mechanical Code. Equipment efficiency, insulation thickness, and duct joint and seam sealing shall meet the requirements of the 2021 International Energy Conservation Code and ASHRAE 90.1- 2019.
INTENT AND REQUIRED INTERPRETATION OF THE CONSTRUCTION DOCUMENTS
Drawings and Specifications are intended to be complementary to each other, and contract required work only may be indicated in one of these two sources. Inclusion of a scope element in either alone, or both, obligates the Contractor to provide the indicated work.
Do not scale the Drawings. Because of the scale of the Drawings, it is not possible to indicate offsets, fittings, valves, piping and duct accessories and appurtenances, or similar items which may be required to provide complete operating systems. Carefully investigate conditions affecting the work associated with this project. Check and verify dimensions and existing conditions at the site. Install systems in such a manner that interferences between pipes, conduit, ducts, equipment, architectural and structural features are avoided. Provide items required to meet the project conditions without additional cost to the Owner.
Unless there are explicit notes to the contrary on piping system flow diagrams, piping system flow diagrams are generally not intended to establish the quantity, type, and orientation of pipe elbows, tees, and caps, as the diagrams are schematic in nature and are not drawn to scale. In the event of a conflict between the graphical depictions on piping floor plans and flow diagram(s) with respect to pipe elbows, tees, and caps, the piping floor plan(s) shall take precedence.
Many of the required piping appurtenances, valves, small or minor piping, control devices, sensors, and similar items are omitted from floor plans and sections for clarity purposes only. Refer to piping system flow diagrams, control diagrams, details, and specifications for additional required work (appurtenances) not shown on the floor plans and/or sections. The Contractor shall include in his bid price all devices shown on any one (or more) portion of the documents, as if they were shown in all locations (e.g. section, diagram, and floor plan).
Where a code or standard is referenced, unless explicitly indicated otherwise, it shall be taken to refer to the most recent published version / edition at the time of bidding.
COORDINATION
Coordinate and furnish in writing to the Architect/Engineer information necessary to permit the work to be installed satisfactorily and with the least possible interference or delay. When work is installed without proper coordination, changes to this work deemed necessary by the Architect shall be made to correct the conditions without additional cost to the Owner .
The Contractor is advised to furnish complete contract documents to all suppliers , sub- contractors ,and other agents .Information required by those entities for the proper completion of their work in a coordinated fashion with the work of others will typically appear in multiple places in the contract documents.
PRE-BID SITE VISIT
Bidders shall visit the site and become completely familiar with existing conditions prior to submitting their bid. No additional cost to the Owner shall be allowed as a result of existing conditions.
SUBMITTALS
Submit to the Architect for approval, manufacturer's product data for all equipment and components furnished under this Contract. Provide 1/4-inch scale shop drawings of all ductwork and piping systems. Provide Owner with three (3) sets of operation and maintenance manuals for all equipment furnished under this Contract. Submittals shall be in PDF form, transmitted electronically.
BASIS OF DESIGN PRODUCTS AND SUBSTITUTIONS
Throughout the project specifications and drawings, materials and equipment may be indicated as the "basis of design" material or equipment. If the bidding Contractor desires to furnish equipment of a manufacturer other than that which is indicated to be the "basis of design", even if that alternative manufacturer and/or product name are also listed, it is the full burden of the bidding Contractor to verify, prior to submitting a bid price, that the proposed product meets all of the project requirements and specifications. The cost of any additional changes to the work, including changes to the work of other trades, that are associated with the Contractor's use of a product other than the "basis of design" product, shall be borne by the Contractor at no additional cost to the Owner, and the proposed additional changes shall be subject to the approval of the Architect / Engineer.
SCHEDULE OF WORK AND CONTINUITY OF SERVICES
Arrange work so as not to interfere with the normal operation of the existing building.
Existing building systems serving the occupied areas shall be maintained and remain functional during the renovation process to the greatest extent possible. If it becomes necessary to temporarily interrupt service to any portion of the building, the Owner shall be notified sufficiently in advance to enable necessary arrangements to be made.
The HVAC Contractor shall be responsible for maintaining the integrity of HVAC air and water distribution systems outside the area of work where such HVAC air and water distribution systems may be compromised by demolition or renovation processes . Therefore ,this Contractor shall be responsible to provide on a temporary or permanent basis whatever HVAC equipment ,components ,piping ,ductwork ,controls control wiring , accessories ,etc ,.required to maintain the integrity of HVAC air and water distribution systems outside the renovation area ,where such systems may be compromised by demolition ,the renovation processes ,or connections to existing systems.
DEMOLITION
Disconnect and remove existing systems and equipment no longer required. The disposal of all demolished materials shall be in accordance with all applicable laws, and all costs shall be borne by the Contractor. The Contractor shall clean up the areas as the work progresses and remove waste and debris daily or when directed. The Contractor shall utilize the salvage value of all demolished materials as a means of reducing his/her bid price, except for items specifically noted otherwise.
Where work is to be performed above existing ceilings, the Contractor will be responsible for removing ceiling tiles, storing tiles and reinstalling tiles after work is complete. The Contractor shall also be responsible for restoring the existing ceilings to their present condition where they are damaged or where the surfaces are dirtied or marred by the work included under this Contract. New matching ceiling tiles and supports shall be furnished and installed under this Contract where necessary. Existing ceiling tiles shall be kept as clean as possible.
Recover refrigerant in demolished systems in accordance with all applicable laws.
CUTTING AND PATCHING
Include cutting and patching required for the installation of ductwork, piping, wiring and equipment. Any damage incident to cutting or other causes in the performance of the contract work shall be made good by replacement or repairs in a manner satisfactory to the Architect / Engineer. Cut, channel, chase, and drill floors, walls, partitions, ceilings, and other surfaces necessary for mechanical installations. Perform cutting by skilled mechanics of trades involved. Repair cut surfaces to match adjacent surfaces.
Where piping or ducts pass through fire or smoke rated construction, furnish and install sleeves and thoroughly seal openings around sleeves, pipes, ducts, etc. with fire and smoke resistant materials. Materials shall be provided to maintain the fire rating of the adjacent construction in accordance with the requirements of NFPA and other applicable codes.
No structural members shall be cut without prior approval of the Architect.
WARRANTY
Warrant material, equipment and workmanship and provide materials, equipment and labor to make good any defects in same which become apparent within one year from date of final acceptance of completed work.
INSTRUCTIONS
Complete the systems so that they are functional and operating to the satisfaction of the Engineer.
Instruct permanent operating personnel in the proper operation, maintenance and adjustment of the systems. Turn over equipment manufacturers' brochures to the Owner.
MISCELLANEOUS STRUCTURAL STEEL
Furnish and install miscellaneous structural steel members as required to support the piping, ductwork and equipment without excessive stress or strain on the existing building construction.
Structural steel members shall conform to ASTM A36. Structural members shall be galvanized.
Structural members exposed to weather shall be hot-dipped galvanized.
ACCESS PANELS
Provide factory-fabricated access panels for access to concealed dampers, valves and other equipment where no other means of access is available. Access panels shall be of appropriate size but not less than 24 inches, flush type, hinged to drop down and out, screwdriver-operated, stainless steel in tile work and prime coated sheet steel in drywall, plaster or acoustical tile. Exact locations and sizes of panels shall be determined by the Contractor, but panels shall be located for a symmetrical appearance. Locations for access panels in finished areas must be approved by the Architect. Access panels are not required at lift-out removable tile ceilings.
At locations where access panels are installed in fire-rated construction, access panels shall contain the 1-1/2-hour fire-rated "B" label; and in addition, shall also be provided with layers of gypsum wall board in a thickness which will supply an additional one and two-hour fire rating equal to the fire rating of adjacent construction.
FIRESTOPPING AND SMOKESTOPPING
General Requirements for Fire-and Smoke Stopping Materials: Provide-fire-stopping and smoke-stopping systems and assemblies for filling openings around duct, conduit, low-voltage cable, and piping penetrations of HVAC work through walls, partitions, slabs, and floors as required by the Building Code. Comply with the provisions in the Architectural Documents.
During bidding, the HVAC Contractor shall thoroughly review the architectural documents to determine the location and hour rating of fire resistance rated construction, and shall include in his bid the costs of providing all fire and smoke stopping of Division 23 work required by the 2018 International Building Code and Mechanical Code.
Pre-Installation Inspection: The Division 23 Contractor, with the assistance and technical support of a fire- and smoke-stopping product manufacturer, shall inspect all fire and smoke barriers (floors, walls, partitions, and slabs) for penetrations of Division 23 work, and shall mark or otherwise identify all penetrations indicating action required: 1) repair; 2) firestopping; and/or 3) smokestopping.
Conduct inspection prior to covering up or enclosing walls or ceilings. Conduct inspection jointly with authorized representative of authority having jurisdiction. Submit a report detailing findings of inspection to the Architect/ Engineer.
Fire-Stop Pipe Sleeves: At the option of the Contractor, and if approved by local codes, prefabricated fire-stop pipe sleeves also may be utilized. Pipe sleeves shall be UL 1479 or UL 263 Listed, and tested in accordance with ASTM E 814 or ASTM E 119. Sleeves shall be adjustable and shall be filled with ceramic fiber material to provide insulation and fire stopping. Sleeves shall provide a 2-hour fire rating.
PAINTING
Paint supports and iron and steel work installed under this Contract. Paint with two coats of Rust-Oleum rust preventative paint. First coat shall be X-60 red primer and second coat shall be satin enamel of colors selected by the Engineer. At locations where it is necessary to cut and patch existing construction, painting at each location shall be performed under this Contract. New finishes shall match existing finishes. Repair marred and damaged factory-painted finishes with materials and procedures to match original factory finish.
HVAC IDENTIFICATION
Pipe Markers: Pipe name abbreviations and flow arrows shall be marked on straight runs of piping at 15 foot intervals and at branch connections, "T's" and changes in directions on exposed insulated and uninsulated piping installed under this Contract in equipment rooms, equipment spaces, above removable tile ceilings and access panels and in vertical chases. Marking shall be applied after finish painting is applied. Markers shall be the B-946 Penna-Code Thin Film Pipe Markers as manufactured by W.H. Brady Company, or approved equal. Markers shall be pressure-sensitive, self-sticking, approximately .0035" thick and suitable for a temperature range of -40 degrees F. to +250 degrees F. Type and style of markers and abbreviations shall match existing.
Equipment Labels: Engraved Plastic. Letters shall be minimum 1/4” high.
Duct Markers: Provide color-coded ductwork labels with factory lettering indicating fan system identification, service, and direction of flow. Duct labels for indoor ductwork shall be flexible vinyl film with acrylic pressure-sensitive adhesive suitable for duct surface temperatures of -40 F to 220 F.
Ceiling Labels: Adheared to ceiling grid denoting the location of equipment. Also provide labels indicating the tile to be removed for filter access / changeout.
HVAC CONTROLS
A. HVAC equipment shall be controlled as indicated on the drawings for each specific application and as specified. All packaged control components shipped loose with the equipment, interconnecting wiring, conduit and accessories will be provided by the Contractor. Provide room thermostats, time clocks, hydrogen sensors, control transformers, all required auxiliary contacts, relays and interface wiring for electrical interlocks and controls indicated on the drawings.
B. Room thermostats for exhaust and ventilation systems shall be 120 volt, reversing-acting type furnished with enclosure and lockable "Lexan" plastic cover, as manufactured by Siebe Environmental Controls, or approved equal.
C. Time Clocks: Provide solid-state time clocks of 7-day, 24-hour type, with weekend or skip-a-day features. Equip time clocks with 10-hour spring carryover to maintain clock movement in case of power failure. Time clocks shall be as manufactured by Paragon, or approved equal.
CONTROL WIRING
HVAC equipment shall be controlled as indicated on the drawings for each specific application and as specified. All packaged control components shipped loose with the equipment, interconnecting wiring, conduit and accessories will be provided by this Contractor.
Electric control wiring shall be in accordance with the National Electrical Code and the Electrical Specifications. All control wiring, including low voltage wiring, outside of control panels shall be run in rigid conduit or EMT, and installed in strict accordance with the requirements of NEC. Wiring for controls, except the low voltage conductors, shall be single conductor solid or stranded copper not less than No. 12 AWG, 90 degrees C., with 600-volt Type THHN/THWN insulation. Wiring in panel construction may be No. 16 or No. 18 AWG copper provided same is properly protected and/or is in accordance with the NEC. No temperature control wiring installed under this contract shall be installed in the building lighting and power circuit system.
Low voltage two conductor and three conductor wire shall be twisted (six turns per foot) 16 AWG or 18 AWG wire, 1/32, 90 degrees C., 600 volt THHN/THWN insulation. Cable shall be as manufactured by Alpha Wire Company, Belden Wire Company, Standard Wire and Cable or approved equal.
All conduit, fittings, hangers and accessories for control wiring installed by this Contractor shall conform to the levels of quality specified under the Electrical Specifications.
BALANCING OF AIR DISTRIBUTION SYSTEMS
Air distribution systems installed or revised under this contract shall be balanced under this contract. Balancing and supervision of balancing shall be performed by qualified and skilled personnel employed by an approved independent balancing firm functioning as a subcontractor to the Heating Contractor. Balancing firms shall be AABC or NEBB certified and shall have had experience on similar sized projects. Past performances and qualifications of the proposed balancing firm shall be submitted to the Architect for review and approval.
Supply air, return air and exhaust air systems shall be accurately balanced by means of a velometer to the CFM noted on the drawings and the dampers and registers securely locked into position. Duct system accessories shall be adjusted and set for the proper air flow quantities and conditions and the Contractor shall adjust and set fans, sheaves, dampers and adjustment mechanisms. Existing fans and air distribution systems affected by the work under this Contract shall be rebalanced under this Contract. Volume control dampers shall be set for proper air distribution and for comfortable conditions.
The Contractor and the Balancing Firm shall furnish services for a minimum of two (2) complete adjustments of the air distribution systems, one for the first cooling season and one for the first heating season. Also provide one inspection per month during the first cooling season and the first heating season.
The Contractor shall submit three copies of a chart to the Architect indicating the CFM at outlet or inlet of each grille, diffuser and register.
Set HVAC system airflow rates within the following tolerances:
A. Supply, Return, and Exhaust Fans: Plus 5 to plus 10 percent.
B. Air Outlets…