SEA LION SCHEDULE OF SERVICES - Attachment 1.xls

XLS spreadsheet 74 KB Posted

Attached to
USCGC SEA LION DRYDOCK REPAIRS FY22
Solicitation number
70Z08022QPBPL0070
Issued by

About this file

This document contains a solicitation for drydock repair services for the USCGC SEA LION. The solicitation is being issued by the United States Coast Guard to perform repairs including structural analysis, hull preservation, tank cleaning, deck preservation, propeller and shaft replacement, generator replacement, and renewal of various piping, insulation and decking. Pricing is requested for defined line items as well as optional line items, and offerors are required to provide their composite labor rate and estimates for direct labor hours, material and subcontracting costs. The document also includes a template for offerors to provide cost estimates breaking down labor categories and material/subcontracting costs, as well as a worksheet for offerors to calculate foreseeable costs based on distance to the vessel's homeport.

View the file

Other files

File Type Posted
COMBINED SYNOPSIS SOLICITATION SEA LION DD.docx DOCX document
SEA LION (WPB 87) DD FQ2 JEB 22R0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SEA LION DD

PRICING SCHEDULE FOR:
USCGC SEA LION (WPB-87) DRYDOCK AVAILABILITY FY2022
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Structural Analysis, 3D Laser Scan, PerformJOB1$0.00
D-002Hull Plating (Side Scan), Ultrasonic TestingJOB1$0.00
O-003Ultrasonic Thickness Measurements, PerformJOB1$0.00
D-004U/W Body, Preserve (100%)JOB1$0.00
D-005Hull Plating Freeboard, Preserve, 100 PercentJOB1$0.00
D-006Tank, Dirty Oil, Clean and InspectJOB1$0.00
D-007Tank, Oily Water, Clean and InspectJOB1$0.00
D-008Tanks, MP Fuel Service, Clean and InspectJOB1$0.00
D-009Decks, Exterior (Main Deck), PreserveJOB1$0.00
O-010Capastic Fairing, Depth Sounder, RenewJOB1$0.00
O-011Main Engine/Reduction Gear, RealignJOB1$0.00
D-012Intermediate Water-Lubricated Propulsion Shaft Bearings, RenewJOB1$0.00
D-013Aft Water-Lubricated Propulsion Shaft Bearings, RenewJOB1$0.00
O-014Intermediate Bearing Carriers, RenewJOB1$0.00
O-015Aft Bearing Carriers, RenewJOB1$0.00
D-016Stern Tube Interior Surfaces, Preserve, 100 PercentJOB1$0.00
D-017Propellers, RenewJOB1$0.00
D-018Fathometer Transducer, RenewJOB1$0.00
D-019Speed Log, Skin Valve, RenewJOB1$0.00
D-020Sea Water System, Perform MaintenanceJOB1$0.00
D-021Rudder Assemblies, RenewJOB1$0.00
D-022Stern Launch Door, Remove, Inspect and ReinstallJOB1$0.00
D-023Grey Water Holding Tanks, Clean and InspectJOB1$0.00
D-024Sewage Holding Tanks, Clean and InspectJOB1$0.00
D-025Grey Water Piping, Clean and FlushJOB1$0.00
D-026Sewage Piping, Clean and FlushJOB1$0.00
D-027Cathodic Protection/Zinc Anodes, RenewJOB1$0.00
D-028DrydockJOB1$0.00
D-029Temporary Services, Provide - CutterJOB1$0.00
D-030Sea Trial Performance, Support, ProvideJOB1$0.00
D-031Propulsion Shaft and Shaft Seals, ReplaceJOB1$0.00
D-032Ship Service Diesel Generator Sets (SSDG’s), ReplaceJOB1$0.00
D-033Stern Door Cross Connect Valves, ModifyJOB1$0.00
D-034Fire Alarm Control Panel, ReplaceJOB1$0.00
D-035Foundation, Boat Winch, ModifyJOB1$0.00
D-036Hull Plating, RenewJOB1$0.00
D-037Sewage/Grey Water Piping, RenewJOB1$0.00
D-038Interior Deck Covering System And Jointer Deck, RenewJOB1$0.00
D-039Insulation, RenewJOB1$0.00
D-00BGFP ReportNSPEANSP
O-00ZLaydaysDay1
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Composite Labor Rate (Hourly)

&C(6/29/2021) Rev-0 - Page &P of &N

Foreseeable Costs

FORESEEABLE COST WORKSHEET
SEA LION70Z08022QPBPL0070
Contractor's Name:
The contractor shall fill-in all yellow labeled boxes below to determine their foreseeable costs. Please read all notes and headers of sections for instructions in completing this worksheet.
DISTANCE FACTORS FOR: USCGC WAHOO, 1 Ebiz Hook Road, Port Angeles, WA 98362
NAUTICAL MILES BASED ON ROUND-TRIP (TO AND FROM)
NUMBER OF DAYS OF AVAILABILITY64
(1) Port Engineer Transportation: AIR TRAVEL
(Applicable if > 50 miles from 1519 Alaska Way, South Seattle, WA 98134

(PE's desk location)

A. Number of CG Representatives from NESU:A=1
B. The number of round trips between the contractor's facility and NESUB=1
C. A multiplied by B:AxB=C=1
D. Travel cost per trip:D=$300.00
E. C multiplied by D =E, if >50 miles from NESU otherwise N/A.E=$300.00
(2) Port Engineer Transportation: CAR TRAVEL
A. Number of CG Representatives from NESU:A=1
B. Number of Driving miles Round-trip between the COR office and contractors facility:B=
C. Travel cost per driving mile (rate at $0.58 per mile)$0.580$0.00
(3) PER DIEM: (Applicable >50 miles CREW + PE)
A. Number of Ship's Crew & Port EngineerA=13
B. Total number of day(s) in drydock.B=64
C. Per diem cost at place of performance, per day: (if < 50 miles, enter "0" for all below)C=
C.1.1. Enter Lodging Daily Per Diem Rate for Nov-Jan$96.00
C.2.1. Enter Meals & Incidentals Total Daily Rate for Nov-Jan$55.00
C.2.1.1. Enter Meals & Incidentals First Day of Travel Daily Rate for Nov-Jan$55.00
D. Ax B= C: (if >50 miles from NESU)AxB=C=$0.00
(4) PER DIEM: (Applicable >50 miles Contracting Officer Travel & Per Diem. KO location is Norfolk, VA 23510)
A. Number of KO authorized travel:A=1
B. Total number of KO travel days:B=3
C. Transportation cost for KO travelC=$531.00
D. Per diem cost at place of performance, per dayD=$329.50
D.1.1. Enter Lodging Per Diem Rate for Nov$96.00
D.2.1. Enter Meals & Incidentals Total Daily Rate for Nov$55.00
D.2.1.1. Enter Meals & Incidentals First & Last Day of Travel Daily Rate for Nov$41.25
E. A [(B*D) + C] =E=$1,519.50
(5) CUTTER COST Operation Factors:
A. Round Trip Nautical Miles from the vessels pier to the contractors facility:A=0
B. Cutter Cost Factor Per Nautical Mile:B=$31.35
C. A multiplied by B= CC=$0.00
(6) FAMILY SEPARATION ALLOWANCES (FSA) Applicable if > 50 miles from Homeport - for crew with dependents only (Daily Rate $8.33). If less than 50 miles enter 0 for A below.
A. Number of Personnel entitled to Family Separation Allowance:A=8
B. Number of Days for Availability minus 30 days if availability is greather than 30 days:B=34
C. A multiplied by B = C (Daily FSA rate of $8.33)C=$2,265.76
(7) CREW TRANSPORTATION FOR HOME VISIT (Applicable after 31 consecutive days if > 50 miles from Homeport - for crew with dependents only
A. Number of Personnel (with dependents) entitled to HOME visit:A=8
B. Number of Homeport Visits:B=1
C Mileage to homeport = (Roundtrip Ticket Cost)C=
D. A multiplied by B, multiplied by C = D:C=$0.00
GRAND TOTAL
1. PE/COR Transportation (AIRFARE)$300.00
2. PE/COR Transportation (CAR)$0.00
3. Per Diem for Crew and PE/COR$0.00
4. Cutter Cost Operations Factors$0.00
5. Family Separation Allowance$2,265.76
6. Crew Transportation Home Visit$0.00
Total Cost of Distance Factors:$2,565.76
Total Contractor Quoted/Proposal Price:$0.00
TOTAL EVALUATED QUOTE/PRICE$2,565.76

Contractor enters name here Contractor shall utilize: https://nauticalcharts.noaa.gov/publications/docs/distances.pdf http://ports.com/sea-route/ Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do.

Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 driving miles from the PE's homeport OR (2) Enter "0" if their dry dock is less than 150 driving miles from the PE's homeport.

Contractor will enter either (1) "0" if their dry dock is located less than 50 miles or more than 150 miles from the PE's homeport or (2) the total number of round trip driving miles if the contractor is located between 51 to 149 miles from PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates based on the location of their facility.

Contractor shall utilize: https://cpsearch.fas.gsa.gov/cpsearch/search.do. Contractor shall utilize either (1) the total dollar amount for commercial round-trip airfare if their dry dock is greater than 150 miles from the KO's location in Norfolk, VA 23510 or (2) Enter "0" if their dry dock is less than 150 miles from the PE's homeport.

Contractors shall utilize https://www.gsa.gov/travel/plan-book/per-diem-rates/per-diem-rates-lookup to estimate per diem rates Do Not Change this cell unless Drydock is less than 50 driving miles from Homeport. Then enter 0.

If contractor's facility is:

- located < 50 miles from the ship's homeport, enter $0.

- located > 51 miles but less than 149 miles from the ship's homeport, multiply round trip vehicle mileage by $0.58

- located > 150 miles from ship's homeport, utilize https://cpsearch.fas.gsa.gov/cpsearch/search.do.

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .