This Invitation for Bids (IFB) is issued by the City and County of San Francisco Office of Contract Administration on behalf of the San Francisco Fire Department, seeking qualified suppliers to provide Starlink Performance Kits and related accessories. The solicitation requests specific equipment items listed in Attachment 3, including Starlink Performance Kits (Model AST-01), Starlink Mini Kits (Model AST-04), Starlink Mini Cables and chargers (Model AST-99), Starlink Local Priority Pooled Data packages, Starlink Mini Mounts (Model SG-MINI-4LegMount-BK), Anker SOLIX C300 power stations, California CBE recycling fees, Anker 65W chargers, Pelican 1510 cases, and APC UPS battery backup systems. The contract includes a 36-month period of performance with a projected start date of September 1, 2024, and end date of August 31, 2027. No specific bidders' conference, site visit, or award date information is provided in the attachment; however, the solicitation incorporates the City's standard Purchase Order Terms for Commodities and references FY 2024 Homeland Security Grant Program (HSGP) funding terms as Appendix B.
The contract is funded through federal grant sources, specifically the FY 2024 HSGP administered by the U.S. Department of Homeland Security Federal Emergency Management Agency, with a total program funding allocation of $1,008,000,000 across State Homeland Security Program (SHSP), Urban Area Security Initiative (UASI), and Operation Stonegarden (OPSG) components. All contractors must comply with extensive federal and local requirements, including maintaining commercial general liability insurance of at least $1,000,000 per occurrence, commercial automobile liability insurance of at least $1,000,000, and workers' compensation insurance in statutory amounts. The City's payment obligation is limited to the certified maximum amount, with no cost overruns authorized without formal amendment and Controller certification. Pricing terms require F.O.B. destination in San Francisco with freight prepaid, articles must be new and of manufacturer's latest model, and all deliveries must be pre-scheduled during business hours of 8:00 A.M. to 5:00 P.M. No set-asides are indicated in the procurement documents provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SE_12221_Attachment_3_-_Bid_Sheet__1_.xlsx | XLSX spreadsheet | |
| OCA_FIR___Starlink_Performance_Kits___Accessories.xml | XML file | |
| SE12221_IFB_for_POs_____Commodities__1_.pdf | ||
| SE_12221_Attachment_2_-_Bidder_Questionnaire.docx | DOCX document | |
| SE_12221_Attachment_4_-_First_Source_Hiring_Form__1_.docx | DOCX document | |
| OCA_FIR___Starlink_Performance_Kits___Accessories.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sourcing Event 0000012221 P-696c (04-26): Attachment 1 1 November 3, 2026 City’s Purchase Order Terms
Sourcing Event 0000012221 Attachment 1
City’s Purchase Order Terms for
Commodities
P-250c (04-26) PO Supplemental Terms for Commodities 2
A. Commercial Terms
1. Cash Discounts - Terms of Payment. The discount period will start upon date of completion of delivery of all items on any Purchase Order or other authorization certified by the City’s Controller, or upon date of receipt of properly prepared invoices covering such deliveries, whichever is later. Payment is deemed to be made, for the purpose of earning the discount, on the date of mailing the City’s check. No additional charge shall accrue against City in the event City does not make payment within any time specified by bidder.
2. Place of Manufacture. No article furnished hereunder shall have been made in prison or by convict labor, except articles purchased for use by City’s detention facilities.
3. Electrical Products. Goods must comply with all applicable laws, ordinances and other legal requirements, including (among others) the Cal-OSHA regulations in Title 8 of the Code of Regulations and, for electrical products, Sections 110.2 and 110.3 (B) of the S.F. Electrical Code.
4. Condition of Articles. Articles offered and furnished must be new and previously unused, and of manufacturer’s latest model, unless otherwise specified herein.
5. Inspection. All articles supplied shall be subject to inspection and acceptance or rejection by Purchasing or any department official responsible for inspection. Non-conforming or rejected goods may be subject to reasonable storage fees.
6. F.O.B. Point. F.O.B. destination in San Francisco, freight prepaid and allowed, unless otherwise specified.
7. Failure to Deliver. If Contractor fails to deliver an article and/or service of the quality, in the manner or within the time called for by this Purchase Order, such article and/or service may be bought from any source by Purchasing and if a greater price than the Purchase Order price be paid, the excess price will be charged to and collected from Contractor or sureties on its bond if bond has been required; or, the City may terminate the Purchase Order for default; or, the City may return deliveries already made and receive a refund.
8. Safety Data Sheets. Where required by law, Contractor will include Safety Data Sheets (SDSs) with delivery for applicable items. Failure to include the SDSs for such items will constitute a material breach of contract and may result in refusal to accept delivery.
9. Taxes. City is exempt from federal taxes except on articles for resale. Contractor will enter state and local sales or use tax, and excise tax if applicable, on invoices.
B. General Contract Conditions
10. Budget and Fiscal Provisions. This Purchase Order is subject to the budget and fiscal provisions of the City’s Charter. Charges will accrue only after prior written authorization certified by the Controller, and the amount of City’s obligation hereunder shall not at any time exceed the amount certified for the purpose and period stated in such advance authorization. This section controls against any and all other provisions of this Purchase Order.
11. Guaranteed Maximum Costs. The City's payment obligation to Contractor cannot at any time exceed the amount certified by the Controller for the purpose and period stated in such certification. Absent an authorized Emergency per the City’s Charter or applicable Code, no City representative is authorized to offer or promise, nor is the City required to honor, any offered or promised payments to Contractor under this Purchase Order in excess of the certified maximum amount without the Controller having first certified the additional promised amount and the Contractor and City having modified this Purchase Order as authorized by amendment and approved as required by law. The Controller is not authorized to make payments on any Purchase Order for which funds have not been certified as available in the budget or by supplemental appropriation.
12. Submitting False Claims; Monetary Penalties. Pursuant to San Francisco Administrative Code §21.35, any Contractor, subcontractor or consultant who submits a false claim shall be liable to the City for the statutory penalties set forth in that section. A Contractor, subcontractor or consultant will be deemed to have submitted a false claim to the City if the Contractor, subcontractor or consultant: (a) knowingly presents or causes to be presented to an officer or employee of the City a false claim or request for payment or approval; (b) knowingly makes, uses, or causes to be made or used a false record or statement to get a false claim paid or approved by the City; (c) conspires to defraud the City by getting a false claim allowed or paid by the City; (d) knowingly makes, uses, or causes to be made or used a false record or statement to conceal, avoid, or decrease an obligation to pay or transmit money or property to the City; or (e) is a beneficiary of an inadvertent submission of a false claim to the City, subsequently discovers the falsity of the claim, and fails to disclose the false claim to the City within a reasonable time after discovery of the false claim.
13. Hold Harmless and Indemnification. Contractor shall indemnify and save harmless City and its officers, agents and employees from, and, if requested, shall defend them from and against any and all liabilities (legal, contractual, or otherwise), losses, damages, costs, expenses, or claims for injury or damages (collectively, “Claims”), arising from or in any way connected with Contractor’s performance of the Purchase Order, including but not limited to, any: (i) injury to or death of a person, including employees of City or Contractor; (ii) loss of or damage to property; (iii) violation of local, state, or federal common law, statute or regulation, including but not limited to privacy or personal identifiable information, health information, disability and labor laws or regulations; (iv) strict liability imposed by any law or regulation; or (v) losses arising from Contractor’s execution of subcontracts not in accordance with the requirements of this Purchase Order applicable to subcontractors except to the extent that such indemnity is void or otherwise unenforceable under applicable law, and except where such Claims are the result of the active negligence or willful misconduct of City and are not contributed to by any act of, or by any omission to perform some duty imposed by law or agreement on Contractor, its subcontractors or either’s agent or employee. The foregoing indemnity shall include, without limitation, reasonable fees of attorneys, consultants and experts and related costs and City’s costs of investigating any claims against the City. In addition to Contractor’s obligation to indemnify City, Contractor specifically acknowledges and agrees that it has an immediate and independent obligation to defend City from any claim which actually or potentially falls within this indemnification provision, even if the allegations are or may be groundless, false or fraudulent, which obligation arises at the time such Claim is tendered to Contractor by City and continues at all times thereafter. Contractor shall indemnify and hold City harmless from all loss and liability, including attorneys’ fees, court costs and all other litigation expenses for any infringement of the patent rights, copyright, trade secret or any other proprietary right or trademark, and all other intellectual property claims of any person or persons arising directly or indirectly from the receipt by City, or any of its officers or agents, of articles or services to be supplied in the performance of this Purchase Order. Under no circumstances will City indemnify or hold harmless Contractor.
14. Liability of City. CITY'S PAYMENT OBLIGATIONS UNDER THE PURCHASE ORDER SHALL
BE LIMITED TO THE PAYMENT OF THE COMPENSATION PROVIDED UNDER THIS PURCHASE
ORDER. NOTWITHSTANDING ANY OTHER PROVISION OF THIS PURCHASE ORDER, IN NO
EVENT SHALL CITY BE LIABLE, REGARDLESS OF WHETHER ANY CLAIM IS BASED ON CONTRACT
OR TORT, FOR ANY SPECIAL, CONSEQUENTIAL, INDIRECT OR INCIDENTAL DAMAGES,
INCLUDING, BUT NOT LIMITED TO, LOST PROFITS, ARISING OUT OF OR IN CONNECTION WITH
THIS PURCHASE ORDER OR THE SERVICES PERFORMED IN CONNECTION WITH THIS
PURCHASE ORDER.
15 Termination and Termination for Convenience. In the event Contractor fails to perform any of its obligations under this Purchase Order, in addition to any other remedies available to City, this Purchase Order may be terminated and all of Contractor's rights hereunder ended. Termination will be effective after ten days’ written notice to Contractor. No new work will be undertaken, and no new deliveries will be made, after the date of receipt of any notice of termination, or five days after the date of the notice, whichever is earlier. In the event of such termination, Contractor will be paid for those goods delivered and services performed, or deliveries made, under this Purchase Order to the satisfaction of the City, up to the date of termination. However, City may offset from any such amounts due Contractor any liquidated damages or other costs City has or will incur due to Contractor’s nonperformance. Any such offset by City will not constitute a waiver of any other remedies City may have against Contractor for financial injury or otherwise. City shall have the option, in its sole discretion, to terminate this Purchase Order, at any time during the term hereof, for convenience and without cause. City shall exercise this option by giving Contractor written notice of termination. The notice shall specify the date on which termination shall become effective. In the event of such termination, Contractor will be paid for those services performed, or deliveries made, pursuant to this Purchase Order to the satisfaction of the City up to the date of termination. In no event shall City be liable for costs incurred by Contractor or any of its subcontractors after the termination date specified by City. Such non-recoverable costs include, but are not limited to, anticipated profits on this contract, post-termination employee salaries, post-termination administrative expenses, or any other cost which is not reasonable or authorized under this section. This section shall not prevent Contractor from recovering costs necessarily incurred in discontinuing further work, or canceling further deliveries, under the Purchase Order after receipt of the termination notice.
16. Alcohol and Drug-Free Workplace Policy. City reserves the right to deny access to, or require Contractor to remove from, City facilities personnel of any Contractor or subcontractor who City has reasonable grounds to believe has engaged in alcohol abuse or illegal drug activity which in any way impairs City's ability to maintain safe work facilities or to protect the health and well-being of City employees and the general public. City shall have the right of final approval for the entry or re-entry of any such person previously denied access to, or removed from, City facilities. Illegal drug activity means possessing, furnishing, selling, offering, purchasing, using or being under the influence of illegal drugs or other controlled substances for which the individual lacks a valid prescription. Alcohol abuse means possessing, furnishing, selling, offering, or using alcoholic beverages, or being under the influence of alcohol.
Contractor agrees in the performance of this Agreement to maintain a drug-free worksplace by notifying employees that unlawful drug use is prohibited and specifying what actions will be taken against employees for violations; establishing an on-going drug-free awareness program that includes employee notification and, as appropriate, rehabilitation. Contractor can comply with this requirement by implementing a drug-free worksplace program that complies with the Federal Drug-Free Worksplace Act of 1988 (41 U.S.C. § 701).
17. Compliance with Americans with Disabilities Act. Contractor acknowledges that, pursuant to the Americans with Disabilities Act (ADA), programs, services and other activities provided by a public entity to the public, whether directly or through a contractor, must be accessible to the disabled public. Contractor shall provide the Services in a manner that complies with the Americans with Disabilities Act (ADA), including but not limited to Title II's
P-250c (04-26) PO Supplemental Terms for Commodities 3 program access requirements, and all other applicable federal, state and local disability rights legislation.
18. Use of City Opinion. Contractor shall not quote, paraphrase, or otherwise refer to or use any opinion of City, its officers of agents, regarding Contractor or Contractor’s performance under this Purchase Order without prior written permission of Purchasing.
19. Contract/Purchase Order Interpretation; Choice of Law/Venue; Assignment. Should any questions arise as to the meaning and intent of the Purchase Order, the matter shall be referred to Purchasing, who shall decide the true meaning and intent of the contract. The formation, interpretation and performance of this Purchase Order shall be governed by the laws of the State of California. Venue for all litigation relative to the formation, interpretation and performance of this Purchase Order shall be in San Francisco. This Purchase Order may be assigned only with the written approval of Purchasing by written instrument executed and approved in the same manner as this Agreement.
20. Proposal, Quotation and Attachments. This Purchase Order incorporates by reference the provisions of any related bid request issued by City, any bid submitted by Contractor, or both. This Purchase Order incorporates by reference the provision of any attachments.
21. Provisions Controlling. Contractor agrees that in the event of conflicting language between this Purchase Order and Contractor's printed form, the provisions of this Purchase Order shall take precedence. This section shall supersede any language in the Contractor’s terms and conditions attempting to nullify City terms and conditions or to resolve language conflicts in favor of the Contractor’s terms and conditions.
22. No Auto-renewal. In no event shall the obligations of the City auto renew, even if other terms state so. Any renewal must be duly and legally authorized.
C. Non-Commercial Terms
23. Nondisclosure of Private, Proprietary or Confidential Information. If this Purchase Order requires City to disclose "Private Information" to Contractor within the meaning of San Francisco Administrative Code Chapter 12M, Contractor and subcontractor shall use such information only in accordance with the restrictions stated in Chapter 12M and in this Purchase Order and only as necessary in performing the services. Contractor is subject to the enforcement and penalty provisions in Chapter 12M. In the performance of services, Contractor may have access to City's proprietary or confidential information, the disclosure of which to third parties may damage City. If City discloses proprietary or confidential information to Contractor, such information must be held by Contractor in confidence and used only in performing the Purchase Order. Contractor shall exercise the same standard of care to protect such information as a reasonably prudent contractor would use to protect its own proprietary or confidential information.
24. Reserved (LBE).
25. Non Discrimination in Contracts and in the Provision of Employee Benefits.
If this Purchase Order is greater than the Minimum Competitive Amount (currently $230,000), Contractor shall comply with the provisions of Article 131 of the San Francisco Labor & Employment Code. Contractor shall not discriminate in the performance of their agreement against any employee, City employee working with such Contractor or Subcontractor, or applicant for employment with such Contractor or Subcontractor, on the basis of the fact or perception of that person’s race, color, creed, religion, national origin, ancestry, Age, Sex, Sexual orientation, Gender Identity, Gender Expression, domestic partner status, marital status, Disability, Acquired Immune Deficiency Syndrome, AIDS/HIV status, weight, or height, nor discriminate in the provision of employee benefits. Further, Contractor shall incorporate by reference in all subcontracts the provisions of § 131.4-1 of the San Francisco Labor & Employment Code and shall require all subcontractors to comply with such provisions. Contractor is subject to the enforcement and penalty provisions in Articles 131.
26. Tropical Hardwood and Virgin Redwood Ban. Pursuant to San Francisco Environment Code Section 804(b), the City urges Contractor not to import, purchase, obtain, or use for any purpose, any tropical hardwood, tropical hardwood wood product, virgin redwood or virgin redwood wood product.
27. Resource Conservation. Contractor agrees to comply fully with the provisions of Chapter 5 of the San Francisco Environment Code, as amended from time to time. Said provisions are incorporated herein by reference.
28. Sunshine Ordinance. Contractor acknowledges that this Purchase Order and all records related to its formation, Contractor's performance under this Agreement, and City's payment are subject to the California Public Records Act, (California Government Code §6250
et. seq.), and the San Francisco Sunshine Ordinance, (San Francisco Administrative Code Chapter 67). Such records are subject to public inspection and copying unless exempt from disclosure under federal, state or local law.
29. Limitations on Contributions. By executing this Purchase Order, Contractor acknowledges its obligations under Section 1.126 of the City’s Campaign and Governmental Conduct Code, which prohibits any person who contracts with, or is seeking a contract with, any department of City for the rendition of personal services, for the furnishing of any material, supplies or equipment, for the sale or lease of any land or building, for a grant, loan or loan guarantee, or for a development agreement, from making any campaign contribution to (i) a City elected official if the contract must be approved by that official, a board on which that official serves, or the board of a state agency on which an appointee of that official serves; (ii) a candidate for that City elective office; or (iii) a committee controlled by such elected official or a candidate for that office, at any time from the submission of a proposal for the contract until the later of either the termination of negotiations for such contract or twelve months after the date City approves the contract. The prohibition on contributions applies to each prospective party to the contract; each member of Contractor’s board of directors; Contractor’s chairperson, chief executive officer, chief financial officer and chief operating officer; any person with an ownership interest of more than ten percent (10%) in Contractor; any subcontractor listed in the bid or contract; and any committee that is sponsored or controlled by Contractor. Contractor certifies that it has informed each such person of the limitation on contributions imposed by Section 1.126 by the time it submitted a proposal for the contract and has provided the names of the persons required to be informed to the City department with whom it is contracting.
30. Health Care Accountability Ordinance -- Service Contracts only. If Purchaser Order is greater than $25,000, Contractor shall comply with San Francisco Labor & Employment Code Article 121. Contractor shall choose and perform one of the Health Care Accountability options set forth in San Francisco Labor & Employment Code §121.3. Contractor is subject to the enforcement and penalty provisions in Article 121.
31. First Source Hiring Program. If Purchase Order is greater than $50,000 and if Contractor has an office in Alameda, San Francisco or San Mateo counties, Contractor must comply with all of the provisions of the First Source Hiring Program, Chapter 83 of the San Francisco Administrative Code, that apply to this Purchase Order, and Contractor is subject to the enforcement and penalty provisions in Chapter 83.
32. Prohibition on Use of Public Funds for Political Activity. In performing the services, Contractor shall comply with San Francisco Administrative Code Chapter 12G, which prohibits funds appropriated by the City for this Purchase Order from being expended to participate in, support, or attempt to influence any political campaign for a candidate or for a ballot measure. Contractor is subject to the enforcement and penalty provisions in Chapter 12G.
33. Reserved (Preservative Treated Wood Products).
34. Food Service Waste Reduction Requirements. Contractor shall comply with the Food Service Waste Reduction Ordinance, as set forth in San Francisco Environment Code Chapter 16, including but not limited to the remedies for noncompliance provided therein.
35. Reserved (Slavery Era Disclosures).
36. Reserved (Sugar Sweetened Beverage Prohibition).
37. Minimum Compensation Ordinance -- Service Contracts only. Contractor shall pay covered employees no less than the minimum compensation required by San Francisco Labor & Employment Code Article 111. Contractor is subject to the enforcement and penalty provisions in Article 111. By signing and executing this Purchase Order, Contractor certifies that it complies with Article 111.
38. Gas Powered Landscaping Equipment. Contractor shall not sell to the City, nor use in the performance of services under this Purchase Order, any Gas-Powered Landscaping Equipment, pursuant to San Francisco Administrative Code Chapter 12E. “Gas-Powered Landscaping Equipment” means any Small Off-Road Equipment (as defined in Title 13, Division 3, Chapter 9, Article 1 of the California Code of Regulations) that is powered by an internal combustion or rotary engine using gasoline, alcohol, or other liquid or gaseous fluid.
39. MacBride Principles--Northern Ireland. If this Purchase Order is greater than the Minimum Competitive Amount (currently $230,000), Chapter 12F applies. The provisions of San Francisco Administrative Code §12F are incorporated herein by this reference and made part of this Purchase Order. By accepting this Purchase Order, Contractor confirms that Contractor has read and understood that the City urges companies doing business in Northern Ireland to resolve employment inequities and to abide by the MacBride Principles, and urges San Francisco companies to do business with corporations that abide by the MacBride Principles.
P-250c (01-26) PO Supplemental Terms for Commodities 4
City and County of San Francisco P-250 Purchase Order Supplemental Terms for Commodities
1. Additional Goods.
If, in the satisfaction of governmental interests it is necessary to purchase additional Goods from Contractor, additional Goods may be added to this Agreement by mutual agreement of the Parties in accordance with Chapter 21 of the San Francisco Administrative Code.
2. Delivery
Contractor must comply with the following delivery requirements.
A. Notice of Delivery: Prior to all deliveries, Contractor shall provide scheduled delivery dates to the ordering department. Any deliveries made without prior scheduling will be rejected by the department with no additional costs incurred.
B. Hours of Delivery All deliveries shall be made and accepted at the City location indicated by the ordering department between the hours of 8:00 A.M. and 5:00 P.M.
C. Substitutions: No substitutions will be allowed unless approved in advance in writing by City.
D. Emergency Deliveries: Emergency deliveries shall be delivered by best means possible. Should the emergency delivery cause City to incur additional costs not contemplated by this Agreement, Contractor shall obtain City’s prior approval. Contractor shall notify City of the estimated time of delivery.
E. Back Orders: Contractor shall notify the ordering department immediately if it is unable to deliver the items and/or quantity ordered. Contractor must notify and obtain approval from the ordering department prior to delivery of any back-ordered items.
Department may reject back-ordered items at no additional costs incurred to City. In the event that back-ordered items are delayed in excess of five (5) working days, City reserves the right to reject partial shipment or cancel the item(s) ordered from the Agreement, at no additional cost incurred to City.
F. Packing Slips: All deliveries must include a packing slip and must provide the following information:
1. Complete description including manufacturer’s name and part number
2. Quantity ordered
3. Purchase Order ID
4. Back-ordered items and amount back-ordered
5. Date back-ordered items will be delivered
3. Reserved.
4. Other Requirements.
A. Hours of Operation: Contractor must maintain normal business hours of at least 8:00 A.M. to 5:00 P.M., Monday through Friday throughout the term of the Agreement, and be open at all times during that period.
B. Reserved.
C. Federal and/or State Funded Contracts
a. Disallowance. If Contractor requests or receives payment from City for Goods, reimbursement for which is later disallowed by the State of California or United States Government, Contractor shall promptly refund the disallowed amount to City upon City’s request. At its option, City may offset the amount disallowed from any payment due or to become due to Contractor under this Purchase Order or any other agreement between Contractor and City. This section survives the termination of the Purchase Order.
b. Grant Terms. The funding for this Purchase Order is provided in full or in part by a Federal or State Grant to the City, as part of the terms of receiving the funds, the City is required to incorporate some of the Federal or State Grant terms (“Grant Terms”) into this Purchase Order as Appendix B. The incorporated terms, if any, shall be found as part of this Purchase Order. To the extent that any Grant Term is inconsistent with any other provisions of this Purchase Order such that Contractor is unable to comply with both the Grant Term and the other provision(s), the Grant Term shall apply. Contractor shall insert each Grant Term into each lower tier subcontract. Contractor is responsible for compliance with the Grant Terms by any subcontractor, lower-tier subcontractor or service provider. This section survives the termination of the Purchase Order.
D. Reserved (Liquidated Damages).
E. Liability for Incidental and Consequential Damages. Contractor shall be responsible for incidental and consequential damages resulting in whole or in part from Contractor’s acts or omission. This section survives the termination of the Purchase Order.
PO Supplemental Terms for Commodities 5
F. Reserved (Performance Bond).
G. Reserved (Fidelity Bond).
H. Insurance
a. Required Coverages. Without in any way limiting Contractor’s liability pursuant to the “Indemnification” section of this Purchase Order, Contractor must maintain in force, during the full term of the Purchase Order, insurance in the following amounts and coverages. This section shall survive termination of the Purchase Order.
i. Commercial General Liability Insurance with limits not less than $1,000,000 each occurrence for Bodily Injury and Property Damage, including Contractual Liability, Personal Injury, Products and Completed Operations.
ii. Commercial Automobile Liability Insurance with limits not less than $1,000,000 each occurrence, “Combined Single Limit” for Bodily Injury and Property Damage, including Owned, Non-Owned and Hired auto coverage, as applicable.
iii. Workers’ Compensation, in statutory amounts, with Employers’ Liability Limits not less than $1,000,000 each accident, injury, or illness.
iv. Reserved (Professional Liability Insurance).
v. Reserved (Technology Errors and Omissions Liability Insurance)
vi. Reserved (Cyber and Privacy Coverage).
vii. Reserved (Pollution Liability Insurance).
b. Additional Insured Endorsements
i. The Commercial General Liability policy must be endorsed to name as Additional Insured the City and County of San Francisco, its Officers, Agents, and Employees.
ii. The Commercial Automobile Liability Insurance policy must be endorsed to name as Additional Insured the City and County of San Francisco, its Officers, Agents, and Employees.
iii. Reserved (Pollution Auto Liability Insurance Additional Insured Endorsement).
c. Waiver of Subrogation Endorsements
i. The Workers’ Compensation policy(ies) shall be endorsed with a waiver of subrogation in favor of the City for all work performed by the Contractor, its employees, agents and subcontractors.
d. Primary Insurance Endorsements
i. The Commercial General Liability policy shall provide that such policies are primary insurance to any other insurance available to the Additional Insureds, with respect to any claims arising out of this Purchase Order, and that the insurance applies separately to each insured against whom claim is made or suit is brought.
ii. The Commercial Automobile Liability Insurance policy shall provide that such policies are primary insurance to any other insurance available to the Additional Insureds, with respect to any claims arising out of this Purchase Order, and that the insurance applies separately to each insured against whom claim is made or suit is brought.
iii. Reserved (Pollution Liability Insurance Primary Insurance Endorsement).
e. Other Insurance Requirements
i. Thirty (30) days’ advance written notice shall be provided to the City of cancellation, intended non-renewal, or reduction in coverages, except for non-payment for which no less than ten (10) days’ notice shall be provided to City. Notices shall be sent to the City address set forth in Section 11.1 entitled “Notices to the Parties.”
ii. Should any of the required insurance be provided under a claims-made form, Contractor shall maintain such coverage continuously throughout the term of this Purchase Order and, without lapse, for a period of three years beyond the expiration of this Purchase Order, to the effect that, should occurrences during the Purchase Order term give rise to claims made after expiration of the Purchase Order, such claims shall be covered by such claims-made policies.
iii. Should any of the required insurance be provided under a form of coverage that includes a general annual aggregate limit or provides that claims investigation or legal defense costs be included in such general annual aggregate limit, such general annual aggregate limit shall be double the occurrence or claims limits specified above.
iv. Should any required insurance lapse during the term of this Purchase Order, requests for payments originating after such lapse shall not be processed until the City receives satisfactory evidence of reinstated coverage as required by this Purchase Order, effective as of the lapse date. If insurance is not reinstated, the City may, at its sole option, terminate this Purchase Order effective on the date of such lapse of insurance.
PO Supplemental Terms for Commodities 6
v. Before commencing any Services, Contractor shall furnish to City certificates of insurance and additional insured policy endorsements with insurers with ratings comparable to A-, VIII or higher, that are authorized to do business in the State of California, and that are satisfactory to City, in form evidencing all coverages set forth above.
Approval of the insurance by City shall not relieve or decrease Contractor’s liability hereunder.
vi. If Contractor will use any subcontractor(s) to provide Services, Contractor shall require the subcontractor(s) to provide all necessary insurance and to name the City and County of San Francisco, its officers, agents and employees and the Contractor as additional insureds.
I. Reserved (LBE Payment and Utilization Tracking System).
J. Reserved (Payment of Prevailing Wages).
K. Reserved (Displaced Worker Protection Act).
L. Reserved (Working with Minors).
M. Reserved (Nonprofit Contractor Requirements & Public Access to Nonprofit Records and Meetings).
N. Reserved. (Packaged Water Prohibition).
O. Reserved. (Sweat Free Procurement).
P. Reserved (Prop J Approval).
Q. Reserved (Payment Card Industry (“PCI”) Requirements).
R. Reserved (BAA).
PO Supplemental Terms for Commodities 7
Appendix A
Specifications
Line Description Manufacturer Model/SKU 1 Starlink Performance Kit Starlink AST-01 2 SL-MiniKit, Starlink Mini Kit (1) Starlink with
Integrated Wi-Fi (1) Kickstand (1) Mini Pipe Adapter and Flat Mount (1) DC Power Cable
(15m) (1) Power Supply (1) Starlink Plug
Starlink AST-04
3 Starlink Mini Cable, 3 in 1 Starlink Mini Car Charger DC Power Cable+ Cigarette Lighter
Adapter 12V-48V with Digital Display, Durable USB C PD 40W and USB A 35W Ports for Trucks and Cars (10FT)
Starlink AST-99
4 Starlink Local Priority Pooled Data 1TB Starlink AST-POOL-LOC 5 Starlink Mini Mount, Magnetic with 200lbs
Heavy Duty Magnet Bases, Starlink Mini Accessories Lockable Starlink Mount for RV, Car, Boat, Truck Aluminum Alloy
Starlink SG-MINI- 4LegMount-BK
6 Anker SOLIX C300 DC Power Bank Station, Outdoor 288Wh Portable Power Station, LiFePO4 Battery, 300W Solar Generator, for Camping, Traveling, and Emergencies (No Wall
Charger Included)
Anker A1726
7 California CBE Recycling Fee N/A N/A 8 Anker Charger, 65W 3-Port Fast Compact
Foldable USB C Charger Block for MacBook Pro/Air, iPad Pro, Galaxy S20, Dell XPS 13, Note
20/10+, iPhone 17 Series, Steam Deck, and More
Anker A2667
9 Pelican 1510 Case with Foam (Black) Pelican B0002SKHIK 10 APC UPS 600VA / 330W UPS Battery Backup &
Surge Protector, 7 Outlets (NEMA 5-15R), USB Charging Port, BE600M1 Uninterruptible Power Supply for Computers, Wi-Fi Routers, and Home
Office Electronics
APC by Schneider Electric BE600M1
11 California CBE Recycling Fee N/A N/A
PO Supplemental Terms for Commodities 8
Appendix B Grant Terms
FY 2024 HSGP NOFO
The U. S. Department of Homeland Security (DHS) Notice of Funding Opportunity (NOFO)
Fiscal Year 2024 Homeland Security Grant Program
All entities wishing to do business with the federal government must have a unique entity identifier (UEI). The UEI number is issued by the system. Requesting a UEI using System for Award Management (SAM.gov) can be found at: https://sam.gov/content/entity-registration.
Updates in Grant Application Forms:
The Data Universal Numbering System (DUNS) Number was replaced by a new, non-proprietary identifier requested in, and assigned by SAM.gov. This new identifier is the Unique Entity Identifier.
Additional Information can be found on Grants.gov: https://www.grants.gov/forms/forms-development/planned-uei-updates https://sam.gov/content/entity-%20%20registration https://sam.gov/content/entity-%20%20registration https://www.grants.gov/forms/forms-development/planned-uei-updates https://www.grants.gov/forms/forms-development/planned-uei-updates
Table of Contents Updates in Grant Application Forms:
A. Program Description
1. Issued By
2. Assistance Listings Number
3. Assistance Listings Title
4. Funding Opportunity Title
5. Funding Opportunity Number
6. Authorizing Authority for Program
7. Appropriation Authority for Program
8. Announcement Type
9. Program Category
10. Program Overview, Objectives, and Priorities
11. Performance Measures
B. Federal Award Information
1. Available Funding for the NOFO: $1,008,000,000
2. Projected Number of Awards 56
3. Period of Performance: 36 months
4. Projected Period of Performance Start Date(s): 09/01/2024
5. Projected Period of Performance End Date(s): 08/31/2027
6. Projected Budget Period(s)
7. Funding Instrument Type: Grant
C. Eligibility Information
1. Eligible Applicants
2. Applicant Eligibility Criteria
3. Subawards and Beneficiaries
a. Subaward Allowability
b. Subrecipient Eligibility
c. Other Subaward Information
d. Beneficiaries or Participants
4. Other Eligibility Criteria/Restrictions
a. National Incident Management System (NIMS) Implementation
b. Emergency Management Assistance Compact (EMAC) Membership
c. Law Enforcement Terrorism Prevention Activities (LETPA)
5. Cost Share or Match D. Application and Submission Information
1. Key Dates and Times
a. Application Start Date: 04/16/2024
b. Application Submission Deadline: 06/24/2024 at 5 p.m. ET
c. Anticipated Funding Selection Date: No later than August 23, 2024
d. Anticipated Award Date: No later than September 30, 2024
e. Other Key Dates:
2. Agreeing to Terms and Conditions of the Award
3. Address to Request Application Package
4. Requirements: Obtain a Unique Entity Identifier (UEI) and Register in the System for
Award Management (SAM.gov)
5. Steps Required to Obtain a Unique Entity Identifier, Register in the System for Award Management (SAM), and Submit an Application
6. Electronic Delivery
7. How to Register to Apply
a. General Instructions:
b. Obtain an UEI Number:
c. Obtain Employer Identification Number
d. Create a login.gov account:
e. Register with SAM:
f. Register in FEMA GO, Add the Organization to the System, and Establish the AOR:
8. Submitting the Application
9. Timely Receipt Requirements and Proof of Timely Submission
10. Content and Form of Application Submission
a. Standard Required Application Forms and Information
b. Program-Specific Required Forms and Information
11. Other Submission Requirements
a. Fusion Center Investments
b. Emergency Communications Investments
12. Intergovernmental Review
13. Funding Restrictions and Allowable Costs
a. Prohibitions on Expending FEMA Award Funds for Covered Telecommunications Equipment or Services
b. Pre-Award Costs
c. Management and Administration (M&A) Costs
d. Indirect Facilities & Administrative (F&A) Costs
e. Funds Transfer Restrictions
f. Evaluation Costs
g. Allowable Cost Matrix for SHSP, UASI, and OPSG
h. SHSP and UASI Other Direct Costs
i. OPSG Other Direct Costs
j. Unallowable Costs for SHSP, UASI, and OPSG
E. Application Review Information
1. Application Evaluation Criteria
a. Programmatic Criteria
b. Financial Integrity Criteria
c. Supplemental Financial Integrity Criteria and Review
2. Review and Selection Process
a. SHSP and UASI
b. OPSG
F. Federal Award Administration Information
1. Notice of Award
2. Pass-Through Requirements
3. Administrative and National Policy Requirements
a. DHS Standard Terms and Conditions
b. Ensuring the Protection of Civil Rights
c. Environmental Planning and Historic Preservation (EHP) Compliance
d. National Incident Management System (NIMS) Implementation
e. Emergency Communication Investments
f. Mandatory Disclosures
4. Reporting
5. Monitoring and Oversight
G. DHS Awarding Agency Contact Information
1. Contact and Resource Information
a. Program Office Contact
b. FEMA Grants News
c. Grant Programs Directorate (GPD) Award Administration Division
d. FEMA Regional Offices
e. Equal Rights
f. Environmental Planning and Historic Preservation
2. Systems Information
a. FEMA GO
b. FEMA Preparedness Toolkit
H. Additional Information
1. Termination Provisions
a. Noncompliance
b. With the Consent of the Recipient
c. Notification by the Recipient
2. Program Evaluation
3. Financial Assistance Programs for Infrastructure
a. Build America, Buy America Act
b. Waivers
c. Definitions
4. Report issues of fraud, waste, abuse
5. National Threat Evaluation and Reporting (NTER) Program Office
a. Behavioral Threat Assessment Integration
b. Nationwide Suspicious Activity Reporting Initiative
A. Program Description
1. Issued By
U.S. Department of Homeland Security (DHS)/Federal Emergency Management Agency (FEMA)/Grant Programs Directorate (GPD)
2. Assistance Listings Number
97.067
3. Assistance Listings Title Homeland Security Grant Program
4. Funding Opportunity Title Fiscal Year 2024 Homeland Security Grant Program (HSGP) State Homeland Security Grant Program (SHSP) Urban Area Security Initiative (UASI) Operation Stonegarden (OPSG)
5. Funding Opportunity Number
DHS-24-GPD-067-00-98
6. Authorizing Authority for Program Section 2002 of the Homeland Security Act of 2002 (Pub. L. No. 107-296, as amended) (6 U.S.C. § 603)
7. Appropriation Authority for Program
Department of Homeland Security Appropriations Act, 2024, Pub. L. No. 118-47, Title III, Protection, Preparedness, Response, and Recovery (2024 DHS Appropriations Act)
8. Announcement Type Initial
9. Program Category
Preparedness: Community Security
10. Program Overview, Objectives, and Priorities
a. Overview
The Fiscal Year (FY) 2024 Homeland Security Grant Program (HSGP) is one of the three grant programs that constitute the DHS/FEMA focus on enhancing the ability of state, local, tribal, and territorial governments, as well as nonprofits, to prevent, protect against, and respond to terrorist attacks. These grant programs are part of a comprehensive set of measures authorized by Congress and implemented by DHS to help strengthen the Nation’s communities against potential terrorist attacks.
In FY 2024, there are three components of the HSGP:
1) State Homeland Security Program (SHSP): SHSP assists state, local, tribal, and territorial (SLTT) efforts to build, sustain, and deliver the capabilities necessary to prevent, prepare for, protect against, and respond to acts of terrorism.
2) Urban Area Security Initiative (UASI): UASI assists high-threat, high-density
Urban Area efforts to build, sustain, and deliver the capabilities necessary to prevent, prepare for, protect against, and respond to acts of terrorism.
3) Operation Stonegarden (OPSG): OPSG supports enhanced cooperation and coordination among Customs and Border Protection (CBP), United States Border Patrol (USBP), and federal, state, local, tribal, and territorial law enforcement agencies to improve overall border security. OPSG provides funding to support joint efforts to secure the United States’ borders along routes of ingress/egress to and from international borders, to include travel corridors in states bordering Mexico and Canada, as well as states and territories with international water borders. SLTT law enforcement agencies utilize their inherent law enforcement authorities to support the border security mission and do not receive any additional authority by participating in OPSG.
Finally, for FY 2024, DHS is focused on the criticality of information sharing and collaboration to building a national culture of preparedness and protecting against terrorism and other threats to our national security. The threats to our nation have evolved during the past two decades. We now face continuous cyber threats by sophisticated actors, threats to soft targets and crowded places, and threats from domestic violent extremists, who represent one of the most persistent threats to the nation1. Therefore, for FY 2024, DHS has identified six priority areas (see Section A.10.b) related to the most serious threats to the nation, as well as required minimum funding allocations.
For a full list of SHSP and UASI recipients and a breakdown of OPSG funding by state for FY 2023, please refer to Information Bulletin (IB) 490a.
b. Goals, Objectives, and Priorities
Goal: The HSGP will fund SLTT efforts and strengthen capabilities of SLTT governments to prevent, prepare for, protect against, and respond to terrorist attacks and other threats and hazards that pose the greatest risk to the security of the United States.
Objectives: HSGP provides resources that support eligible SLTT governments; high-density urban areas, and SLTT law enforcement along international land/water borders and travel corridors in meeting the following objectives:
• Build and sustain core capabilities, including Law Enforcement and Terrorism Prevention Activities and the National Priority Areas (see priorities below);
1Strategic Intelligence Assessment and Data on Domestic Terrorism, Federal Bureau of Investigation and Department of Homeland Security, June 2023.
https://www.fema.gov/sites/default/files/documents/fema_ib_2023_award_announcement_thgsp_update_signed_508c.pdf
• Address capability gaps identified in their Threat and Hazard Identification and Risk Assessment (THIRA) and Stakeholder Preparedness Review (SPR) process; and
• Implement a comprehensive and coordinated approach to address enduring security needs of communities that includes planning, training and awareness campaigns, equipment and capital projects, and exercises.
SHSP and UASI Funding Priorities: Given the evolving national security threat landscape, DHS/FEMA has evaluated the national risk profile and set priorities that help inform appropriate allocation of scarce security dollars. In assessing the national risk profile for FY 2024, six National Priority Areas pose the most concern. Due to the unique threats that the nation faces in 2024, DHS/FEMA has determined that recipients should allocate a total of 30% of their SHSP and UASI award funds across these six priority areas. As indicated below, one of the priorities has a minimum spend requirement totaling 3% of SHSP and UASI awards. Recipients will have the flexibility to allocate the remaining 27% across the priorities. The following are the six priority areas for FY 2024, along with the minimum corresponding percentage of SHSP and UASI funds that each recipient will be required to allocate:
1) Enhancing the protection of soft targets/crowded places – no minimum percent
2) Enhancing information and intelligence sharing and analysis – no minimum percent
3) Combating domestic violent extremism – no minimum percent
4) Enhancing cybersecurity – no minimum percent
5) Enhancing community preparedness and resilience – no minimum percent
6) Enhancing election security – 3%
Additional information about these priority areas and how they relate to achieving anti-terrorism capabilities is included in Section D of this NOFO. Failure by a recipient to propose investments and projects that align with the priority areas and spending requirements will result in a recipient having a portion of their SHSP and UASI funds (up to 30%) placed on hold until they provide projects that sufficiently align to the National Priority Areas, and total at least the minimum percentages per National Priority Area (as applicable) and overall 30% of total SHSP and UASI funds.
A state or high-risk urban area must allocate the remaining 70% of their funding to addressing capability gaps (e.g., building/sustaining capability and/or closing capability gaps) identified through their THIRA/SPR process.
Likewise, there are several enduring security needs that crosscut the homeland security enterprise to which recipients should consider allocating funding across core capability gaps and national priorities. The following are enduring needs that help recipients implement a comprehensive approach to securing communities:
1) Effective planning2;
2) Training and awareness campaigns;
3) Equipment and capital projects; and
4) Exercises.
The table below provides a breakdown of the FY 2024 SHSP and UASI priorities (the focus of OPSG remains unique to border security), showing the core capabilities enhanced and lifelines supported, as well as examples of eligible project types for each area. More information on allowable investments can be found in the Section D.13 “Funding Restrictions and Allowable Costs” below and in the Preparedness Grants Manual (FM-207-23-001). DHS/FEMA anticipates that in future years, national priorities will continue to be included and will be updated as the threats evolve and as capability gaps are closed. Applicants are strongly encouraged to begin planning to sustain existing capabilities through funding mechanisms other than DHS preparedness grants. The example project types in the table below are allowable to prepare for disasters unrelated to acts of terrorism as long as they also help achieve target capabilities related to preventing, preparing for, protecting against, or responding to acts of terrorism.
FY 2024 SHSP and UASI Funding Priorities All priorities in this table concern the Safety and Security Lifelines.
Priority Areas Core Capabilities Example Project Types National Priorities Enhancing Cybersecurity
• Cybersecurity
• Intelligence and information sharing
• Planning
• Public information and warning
• Operational coordination
• Screening, search, and detection
• Access control and identity verification
• Supply chain integrity and security
• Risk management for protection programs and activities
• Long-term vulnerability reduction
• Situational assessment
• Infrastructure systems
• Operational communications
• Cybersecurity risk assessments
• Migrating online services to the “.gov” internet domain
• Projects that address vulnerabilities identified in cybersecurity risk assessments o Improving cybersecurity of critical infrastructure to meet minimum levels identified by the Cybersecurity and Infrastructure Security Agency and the National Institute of Standards and Technology Cybersecurity Framework (Version 1.1) o Adoption of cybersecurity performance goals (CISA's Cross-Sector Cybersecurity Performance Goals)
• Cybersecurity training and planning
Enhancing the Protection of Soft Targets/ Crowded Places
• Operational coordination
• Public information and warning
• Intelligence and information sharing
• Interdiction and disruption
• Operational overtime. For more information on operational overtime, see Section D of this NOFO.
• Physical security enhancements o Security cameras (closed-circuit television [CCTV]) o Security screening equipment for people and baggage
2Including assessment of critical infrastructure system vulnerabilities and plans to reduce consequences of disruptions, using the Infrastructure Resilience Planning Framework and Regional Resiliency Assessment Methodology produced by the Cybersecurity and Infrastructure Security Agency.
https://www.fema.gov/grants/preparedness/manual https://www.fema.gov/grants/preparedness/manual https://www.cisa.gov/cybersecurity https://www.cisa.gov/cybersecurity https://www.nist.gov/cyberframework https://www.nist.gov/cyberframework https://www.nist.gov/cyberframework https://www.cisa.gov/cpg https://www.cisa.gov/cpg
Priority Areas Core Capabilities Example Project Types
• Screening, search,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .