SDF Concourse _A_ Construction_Table_of_Contents.pdf
PDF 574 KB Posted
- Attached to
- SDF Concourse "A" Construction
- Solicitation number
- 7621
- Issued by
- Jefferson County, Kentucky
About this file
This is a Table of Contents document for contract materials issued by the Louisville Regional Airport Authority for the SDF Concourse "A" Construction project at Louisville Muhammad Ali International Airport in Louisville, Kentucky. The project consists of construction of a 110,000 square foot building expansion located east of the existing terminal, with work encompassing general construction including selective demolition, concrete, masonry, steel structure and metal fabrications, casework, roofing, insulation, curtainwall and glazing, doors and hardware, and interior finishes; civil work including paving, grading, and utilities; mechanical work including HVAC, fire protection, and plumbing systems; and electrical work including panels, conduit, wiring, lighting, and technology systems. The contract documents are organized into five volumes containing the Invitation to Bid, bid forms, contract forms, general and special provisions, technical specifications organized by construction division, civil specifications, and a geotechnical exploration report. The LRAA Project Number is C26S03, with a Foth Project Number of 0025L001.08 and Architect's Commission Number of SDF2501, dated September 11, 2026.
The technical specifications include detailed requirements across 31 construction divisions plus civil and transportation specifications, with work performed by multiple design firms including Skyhook, MDA, Kimley-Horn, VDA, Faith Group, Swanson Rink, and HNTB. Special provisions include federal and local requirements, Department of Labor wage rate determinations, DBE reporting, Buy American preferences, performance and payment bond requirements, and various contract modifications and commissioning procedures. The contract documents reference security badge and vehicle permit requirements, insurance certificates, and lien release and waiver forms as standard contract administration documents.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT DOCUMENTS FOR:
SDF CONCOURSE “A” CONSTRUCTION
LOUISVILLE MUHAMMAD ALI INTERNATIONAL AIRPORT
VOLUME 1 of 5
LOUISVILLE REGIONAL AIRPORT AUTHORITY
700 ADMINISTRATION DRIVE
LOUISVILLE, KENTUCKY
DATE: September 11, 2026
LRAA Project Number: C26S03
Foth Project Number: 0025L001.08
Architect’s Commission Number: SDF2501
Table of Contents 1
TABLE OF CONTENTS
VOLUME 1
SECTION 1 – INVITATION TO BID AND BID FORMS
Invitation to Bid
Bid Form (Bid)
Bid Questionnaire (to be submitted with Bid)
Bid Bond (to be submitted with Bid)
SECTION 2 – CONTRACT FORMS
Performance Bond
Payment Bond
Contract Agreement
SECTION 3 – GENERAL PROVISIONS
Section 10 Definition of Terms
Section 20 Proposal Requirements and Conditions
Section 30 Award and Execution of Contract
Section 40 Scope of Work
Section 50 Control of Work
Section 60 Control of Materials
Section 70 Legal Regulations and Responsibility to Public
Section 80 Execution and Progress
Section 90 Measurement and Payment
SECTION 4 – SPECIAL PROVISIONS
Part A – Federal Provisions
Part B – Local Provisions
Attachments to the Special Provisions:
Attachment 1 – Department of Labor Wage Rate Determination
Attachment 2 – Contractor Bid Question and Answer Form
Attachment 3 – Release and Waiver of Lien
Attachment 4 – Sub or Vendor Release of Lien for Progress Payment
Attachment 5 – DBE Monthly Reporting Form
Attachment 6 – Sworn Statement of Final Payment
Attachment 7 – Contractor Guide for Obtaining Security Badges and Vehicle Permits
Attachment 8 – New AOA Vehicle Permit Application
Attachment 9 – Buy American Preference Construction Project Content Percentage Worksheet
Attachment 10 – Sample Insurance Certificate
Table of Contents 2
SECTION 5 – TECHNICAL SPECIFICATIONS
VOLUME 2
INTRODUCTORY INFORMATION
00 01 07 Seals Page
00 01 11 Table of Contents
DIVISION 01 –- GENERAL REQUIREMENTS
01 11 00 Summary of Work
01 14 00 Work Restrictions
01 21 00 Allowances
01 25 00 Substitution Procedures
01 26 00 Contract Modification Procedures
01 29 00 Payment Procedures
01 31 00 Project Management and Coordination
01 32 00 Construction Progress Documentation
01 33 00 Submittal Procedures
01 40 00 Quality Requirements
01 43 39 Mock-Ups
01 50 00 Temporary Facilities and Controls
01 60 00 Product Requirements
01 73 00 Execution
01 77 00 Closeout Procedures
01 78 23 Operation and Maintenance Data
01 78 39 Project Record Documents
01 79 00 Demonstration and Training
01 91 13 General Commissioning Requirements
01 91 13.13 Functional Testing
01 91 19 Commissioning of Building Envelope Systems
01 91 19.13 Functional Testing – Building Envelope
DIVISION 02 - EXISTING CONDITIONS (MDA)
02 41 19 Selective Demolition
DIVISION 03 - CONCRETE
03 30 00 Cast-In-Place Concrete (Skyhook)
DIVISION 04 - MASONRY (MDA)
04 20 00 Unit Masonry
Table of Contents 3
DIVISION 05 - METALS
05 12 00 Structural Steel Framing (Skyhook)
05 31 00 Steel Decking (Skyhook)
05 40 00 Cold-Formed Metal Framing (Skyhook)
05 50 00 Metal Fabrications (MDA)
05 58 13 Column Covers (MDA)
05 51 13 Metal Pan Stairs and Ships Ladders (MDA)
05 73 00 Decorative Metal Railings
05 75 00 Decorative Formed Metal (MDA)
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES (MDA)
06 10 53 Miscellaneous Rough Carpentry
06 16 00 Sheathing
06 20 23 Interior Finish Carpentry
06 41 00 Airport Casework
06 41 16 Architectural Casework
06 64 00 Plastic Paneling
DIVISION 07 - THERMAL AND MOISTURE PROTECTION (MDA)
07 05 43 Thermal Clip System
07 13 26 Self-Adhering Sheet Waterproofing
07 21 00 Thermal Insulation
07 21 19 Foamed-In-Place Insulation
07 24 13 Exterior Insulation and Finish System
07 26 16 Under-Slab Vapor Retarders
07 27 15 Nonbituminous Self-Adhering Sheet Air Barriers
07 42 43 Aluminum Plate Wall Panels
07 55 53 Styrene-Butadiene-Styrene (SBS) Modified Bituminous Protected Membrane Roofing
07 62 00 Sheet Metal Flashing and Trim
07 72 00 Roof Accessories
07 81 00 Applied Fire Protection
07 84 13 Penetration Firestopping
07 84 43 Joint Firestopping
07 91 00 Preformed Joint Seals
07 92 00 Joint Sealants
07 92 19 Acoustical Joint Sealants
07 95 13 Interior Expansion Joint Cover Assemblies
DIVISION 08 - OPENINGS (MDA)
08 11 13 Hollow Metal Doors and Frames
08 14 16 Flush Wood Doors
08 31 13 Access Doors and Frames
08 33 50 High Speed Rolling Fabric Doors
Table of Contents 4
08 34 63 Security Steel Doors and Frames
08 34 73 Metal Sound Control Door Assemblies
08 41 13 Aluminum-Framed Entrances and Storefronts
08 43 33 Bullet Resistant Doors and Storefront
08 44 13 Glazed Aluminum Curtain Walls
08 56 53 Security Service Windows
08 71 00 Door Hardware
08 80 00 Glazing
08 81 13 Decorative Glazing Systems
08 91 19 Fixed Louvers
DIVISION 09 - FINISHES (MDA)
09 22 16 Non-Structural Metal Framing
09 29 00 Gypsum Board
09 30 13 Ceramic Tiling
09 51 13 Acoustical Panel Ceilings
09 54 00 Integrated Ceiling System
09 65 00 Resilient Flooring
09 65 13 Resilient Base and Accessories
09 66 23 Resinous Matrix Terrazzo Flooring
09 67 00 Fluid-Applied Flooring
09 68 13 Tile Carpeting
09 75 53 Quartz Surfacing
09 84 36 Sound-Absorbing Baffle Panels
09 91 13 Exterior Painting -
09 91 23 Interior Painting
09 96 43 Intumescent Painting
DIVISION 10 - SPECIALTIES (MDA)
10 14 00 Wayfinding Signage
10 21 13 Stainless-Steel Toilet Compartments
10 22 13 Wire Mesh Partitions
10 22 33 Accordion Folding Partitions
10 26 41 Fiberglass Ballistic Panels
10 26 50 Impact-Resistant Wall Protection
10 28 00 Toilet and Bath Accessories
10 43 00 Emergency Aid Specialties
10 44 13 Fire Protection Cabinets
10 51 13 Lockers and Benches
DIVISION 11 - EQUIPMENT (MDA)
11 00 00 Equipment
11 14 00 Pedestrian Control Equipment
11 14 53 Exit Lane Security Breach Control System
Table of Contents 5
11 53 13 Laboratory Fume Hoods
11 90 10 Weapons Storage
DIVISION 12 – FURNISHINGS (MDA)
12 21 13 Horizontal Louver Blinds
12 24 13 Roller Window Shades
12 50 00 Furniture
12 55 00 Detention Furniture
DIVISION 13 - SPECIAL CONSTRUCTION (MDA)
13 19 00 Kennel Enclosures
Table of Contents 6
VOLUME 3
DIVISION 14 - CONVEYING
14 21 23 MRL Traction Elevators (VDA)
14 24 23 Hydraulic Elevators (VDA)
14 31 00 Escalators (VDA)
DIVISION 21 - FIRE PROTECTION (Kimley-Horn)
21 01 00 OPERATION AND MAINTENANCE OF WATER-BASED FIRE SUPPRESSION
SYSTEMS
21 05 00 COMMON WORK RESULTS FOR FIRE SUPPRESSION
21 05 29 HANGERS AND SUPPORTS FOR FIRE SUPRESSION PIPING AND EQUIPMENT
21 05 53 IDENTIFICATION FOR FIRE SUPRESSION PIPING AND EQUIPMENT
21 08 00 COMMISSIONING OF FIRE SUPPRESSION SYSTEMS
21 12 00 FIRE SUPPRESSION STANDPIPES
21 13 13 WET PIPE SPRINKLER SYSTEMS
21 13 16 DRY PIPE SPRINKLER SYSTEMS
21 22 00 CLEAN-AGENT FIRE-EXTINGUISHING SYSTEMS
DIVISION 22 - PLUMBING (Kimley-Horn)
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 23 GENERAL DUTY VALVES FOR PLUMBING PIPING
22 05 29 HANGERS AND SUPPORTS FOR PLUMBING PIPING AND EQUIPMENT
22 05 33 HEAT TRACING FOR PLUMBING PIPING
22 05 53 IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT
22 05 93 TESTING ADJUSTING AND BALANCING FOR PLUMBING
22 07 19 PLUMBING PIPING INSULATION
22 08 00 COMMISSIONING OF PLUMBING
22 11 16 DOMESTIC WATER PIPING
22 11 19 DOMESTIC WATER PIPING SPECIALTIES
22 11 23.21 INLINE, DOMESTIC-WATER PUMPS
22 13 16 SANITARY WASTE AND VENT PIPING
22 13 19 SANITARY WASTE PIPING SPECIALTIES
22 13 19.13 SANITARY DRAINS
22 14 14 STORM DRAINAGE PIPING
22 14 23 STORM DRAINAGE PIPING SPECIALTIES
22 14 29 SUMP PUMPS
22 33 00 ELECTRIC, DOMESTIC-WATER HEATERS
22 42 00 COMMERCIAL PLUMBING FIXTURES
Table of Contents 7
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (Kimley-Horn)
23 05 00 COMMON WORK RESULTS FOR HVAC
23 05 23 GENERAL DUTY VALVES FOR HVAC PIPING
23 05 29 HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
23 05 48 VIBRATION AND SEISMIC CONTROLS FOR HVAC
23 05 53 IDENTIFICATION FOR HVAC PIPING AND EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 13 DUCT INSULATION
23 07 16 HVAC EQUIPMENT INSULATION
23 07 19 HVAC PIPING INSULATION
23 08 00 COMMISSIONING OF HVAC
23 21 13 HYDRONIC PIPING
23 21 16 HYDRONIC PIPING SPECIALTIES
23 21 23 HYDRONIC PUMPS
23 31 13 METAL DUCTS
23 33 00 AIR DUCT ACCESSORIES
23 34 00 HVAC FANS
23 36 00 AIR TERMINALS UNITS
23 37 13 AIR GRILLES, REGISTERS, AND DIFFUSERS
23 57 00 HEAT EXCHANGERS FOR HVAC
23 64 16 MODULAR AIR-COOLED HEAT PUMP
23 64 26 MODULAR WATER-COOLED HEAT PUMP CHILLER
23 72 13 HEAT WHEEL AIR-TO-AIR ENERGY RECOVERY UNITS
23 73 13.19 INDOOR, CUSTOM AIR-HANDLING UNITS
23 81 26 SPLIT SYSTEM AIR-CONDITIONERS
23 81 46 WATER-SOURCE UNITARY HEAT PUMPS
23 83 16 RADIANT-HEATING HYDRONIC PIPING
23 84 13.29 SELF-CONTAINED STEAM HUMIDIFIERS
DIVISION 25 - INTEGRATED AUTOMATION (Kimley-Horn)
25 05 00 COMMON WORK RESULTS FOR INTEGRATED AUTOMATION
25 08 00 COMMISIONING OF INTEGRATED AUTOMATION
25 10 00 INTEGRATED AUTOMATION NETWORK EQUIPMENT
25 31 00 INTEGRATED AUTOMATION INSTRUMENTATION AND TERMINAL DEVICES
25 90 00 AUTOMATION CONTROL SEQUENCES
DIVISION 26 - ELECTRICAL (Kimley-Horn)
26 00 10 SUPPLEMENTAL REQUIREMENTS FOR ELECTRICAL
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS
26 05 33.13 CONDUITS FOR ELECTRICAL SYSTEMS
26 05 33.16 BOXES AND COVERS FOR ELECTRICAL SYSTEMS
26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND CABLING
Table of Contents 8
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 73 POWER SYSTEM STUDIES
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS
26 22 13 LOW-VOLTAGE DISTRIBUTION TRANSFORMERS
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 29 23 VARIABLE-FREQUENCY MOTOR CONTROLLERS
26 33 53 STATIC UNINTERRUPTIBLE POWER SUPPLY
26 41 13 LIGHTNING PROTECTION FOR STRUCTURES
26 43 13 SURGE PROTECTIVE DEVICES FOR LOW-VOLTAGE ELECTRICAL POWER
CIRCUITS
26 50 00 LIGHTING
Table of Contents 9
VOLUME 4
DIVISION 27 - COMMUNICATIONS (Faith Group)
27 00 00 COMMUNICATIONS GENERAL REQUIREMENTS
27 05 05 SELECTIVE TELECOMMUNICATIONS DEMOLITION
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS
27 05 29 HANGERS AND SUPPORTS FOR COMMUNICATIONS SYSTEMS
27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 44 SLEEVES AND SLEEVE SEALS FOR COMMUNICATIONS
PATHWAYS AND CABLING
27 05 53 IDENTIFICATION FOR COMMUNICATIONS SYSTEMS
27 11 00 COMMUNICATIONS ROOM EQUIPMENT
27 11 26 COMMUNICATIONS POWER DISTRIBUTION UNITS
27 13 23 COMMUNICATIONS OPTICAL FIBER BACKBONE CABLING
27 15 13 COMMUNICATIONS COPPER HORIZONTAL CABLING
27 21 00 LOCAL AREA NETWORK
27 21 01 CBP LOCAL ARA NETWORK
27 21 33 WIRELESS COMMUNICATIONS SYSTEMS
27 33 53 UNINTERRUPTIBLE POWER SUPPLY
27 40 00 MULTI-USE FLIGHT INFORMATION DISPLAY SYSTEMS
27 51 16 PUBLIC ADDRESS SYSTEM
27 53 19 EMERGENCY RESPONDER COMMUNICATIONS ENHANCEMENT SYSTEM (ERCES)
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY (Faith Group UNO)
28 00 00 ELECTRONIC SAFETY AND SECURITY GENERAL REQUIREMENTS
28 00 02 ELECTRONIC SAFETY AND SECURITY GENERAL REQUIREMENTS (CBP)
28 05 13 CONDUCTORS AND CABLES FOR ELECTRONIC SECURITY
28 13 00 ACCESS CONTROL SOFTWARE AND DATABASE MANAGEMENT
28 13 02 ELECTRONIC ACCESS CONTROL SOFTWWARE AND DATABASE MANAGEMENT
(CBP)
28 15 00 ACCESS CONTROL HARDWARE DEVICES
28 15 02 ACCESS CONTROL HARDWARE DEVICES (CBP)
28 21 00 VIDEO SURVEILLANCE HARDWARE
28 21 02 VIDEO SURVEILLANCE HARDWARE (CBP)
28 23 00 VIDEO MANAGEMENT SYSTEM
28 23 02 VIDEO MANAGEMENT SYSTEM (CBP)
28 31 00 FIRE DETECTION AND ALARM (Kimley-Horn)
28 31 02 INTRUSION DETECTION (CBP)
Table of Contents 10
DIVISION 31 – EARTHWORK
31 23 18 Earth Moving for Structures (Skyhook)
31 63 29 Drilled Concrete Piers (Skyhook)
DIVISION 34 – TRANSPORTATION (Swanson Rink)
34 77 39.01 Baggage Handling System Basic Requirements
34 77 39.05 Baggage Handling System Equipment Metal Fabrications
34 77 39.09 Baggage Handling System Equipment Painting and Protective Coatings
34 77 39.19 Baggage Handling System Conveying Equipment
34 77 39.23 Baggage Handling System Electrical Requirements
34 77 39.24 Baggage Handling System Controls and Instrumentation
34 77 39.25 Baggage Handling System Sequence of Operation
34 77 39.28 Baggage Handling System Commissioning
CIVIL TECHNICAL SPECIFICATIONS (HNTB)
A-100 Phasing and Alternates A-100-1-5
A-102 Access and Security A-102-1-2
Louisville Regional Airport Authority Gate Log Attachment 2
Gate Guard Requirements Attachment 3
Gate Lock and Key Log Attachment 4
Gate Lock and Key Agreement Attachment 5
A-103 Marking & Lighting of Temporarily Closed Airport Facilities A-103-1-3
C-100 Contractor Quality Control Program (CQCP) C-100-1-6
C-102 Temporary Air and Water Pollution, Soil Erosion, and Siltation Control C-102-1-3
C-105 Mobilization C-105-1
C-110 Method of Estimating Percentage of Material Within
Specifications Limits (PWL) C-110-1-7
P-101 Preparation/Removal of Existing Pavements P-101-1-5
P-151 Clearing and Grubbing P-151-1-2
P-152 Excavation and Embankment P-152-1-10
P-153 Controlled Low Strength Material (CLSM) P-153-1-2
P-209 Crushed Aggregate Base Course P-209-1-6
P-219 Recycled Concrete Aggregate Base Course P-219-1-5
P-403 Flexible Pavements P-403-1-17
P-501 Portland Cement Concrete Pavement P-501-1-32
P-603 Emulsified Asphalt Tack Coat P-603-1-3
P-605 Joint Sealant for Pavements P-605-1-3
P-610 Concrete for Miscellaneous Structures P-610-1-7
P-620 Runway and Taxiway Painting P-620-1-6
F-162 Chain Link Fence F-162-1-4
D-701 Pipe for Storm Drains and Culverts D-701-1-6
D-705 Pipe Underdrains for Airports D-705-1-6
D-751 Manholes, Catch Basins, Inlets and Inspection Holes D-751-1-4
Table of Contents 11
L-110 Airport Underground Electrical Duct Banks & Conduits L-110-1-8
L-115 Electrical Manholes and Junction Structures L-115-1-7
T-901 Seeding T-901-1-4
T-905 Topsoiling T-905-1-3
SP 1 Storm Water Treatment Device SP 1-1-3
SP 2 LEL Monitor SP 2-1-6
SP 3 Sanitary Sewer (Private) SP 3-1-2
SP 4 Water Service SP 4-1-4
SP 5 Gas Service
SP-6 Geothermal Piping
VOLUME 5
APPENDIX A
Geotechnical Exploration Report by WSP USA, Inc.
Project No. US0054245.0594
Dated September 9, 2026
END OF TABLE OF CONTENTS