Scrubbers_JA.pdf
PDF 345 KB Posted
- Solicitation number
- N3225325C0004
About this file
This document is a Justification and Approval (J&A) for a sole source contract issued by the Department of the Navy's Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF). The contract is for repair actions involving the removal, refurbishment, and re-installation of No.1 & No.2 CO2 scrubbers onboard the 777 USS North Carolina, as identified by the 777 North Carolina project and deemed mandatory by the Engineering and Planning Department.
The total estimated dollar value is $480,000.00, funded from FY25 O&MN with a performance period from 01 APR 2025 to 30 APR 2026 or until work is completed. Cepeda is identified as the Original Equipment Manufacturer (OEM) of the CO2 scrubber system, with proprietary procedures, drawings, and equipment. A sources sought notice was posted on Sam.gov, but no other companies demonstrated capability to perform the requirement. The contract will be awarded on a sole source basis under 10 U.S.C. 3402(a)(1), with Cepeda being the only responsible source capable of satisfying the agency's specific technical requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .