Scoring _ SOQ Form.pdf

PDF 180 KB Posted

Attached to
Glenwood FY27 CDBG Sewer System Improvements
Solicitation number
PE-66836-NONST-2027-000000003
Issued by
Douglas County, Georgia

About this file

This document is a Statement of Qualifications (SOQ) Scoring Form used to evaluate architectural and/or engineering firms for state and local contract opportunities. The form provides a standardized evaluation template for assessing firms across five primary criteria: ability to provide necessary disciplines for the project, firm and key personnel experience with the project type, quality of reference information, experience with similar projects supported by examples, and price competitiveness. Each criterion is scored on a scale of 0 to 2 points (Poor, Good, or Excellent), with a maximum total score of 10 points. The form also includes binary verification fields requiring evaluators to confirm whether the firm can meet PER/PAR deadlines and whether the firm carries Errors and Omissions insurance coverage.

The scoring form includes space for reviewer comments, the reviewer's name and title, and the date of review. This tool is designed to provide objective, consistent evaluation of competing firms' qualifications during the proposal selection process. No specific pricing information, set-asides, contract terms, or project-specific details are contained within this generic scoring template, as it serves as a reusable instrument for multiple contract opportunities.

View the file

Other files

File Type Posted
Glenwood FY27 CDBG RFP.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF QUALIFICATIONS

SCORING

CONTACT: ________________________

NAME OF FIRM: __________________________

FIRM ADDRESS: ___________________________________

Evaluate the Architectural and/or Engineering Firm based on the points assigned to each selected criterion.

CIRCLE POINTS

CRITERION

POOR

GOOD

EXCELLENT

POINTS

ASSIGNED

1. Ability to provide the disciplines necessary for this project. 0 1 2

2. The Firm’s and Key personnel experience with this type of Project 0 1 2

3. Quality of reference information. 0 1 2

4. Has the Firm had experience with similar projects (provides examples)? 0 1 2

5. Is the price competitive? % 0 1 2

TOTAL POINTS

Firm can meet PER/PAR deadline? Yes No

Firm carries Errors and Omissions insurance? Yes No

REVIEW COMMENTS: ______________________________________________________________

NAME & TITILE: ________________________________

DATE OF REVIEW: ______________________________

File details come from the government source that posted it. Updated .