Scope of WorkBMV walls Bolduc Farm.doc
DOC document 28 KB Posted
- Attached to
- Waterproof Exterior Wall - Bolduc Farm
- Solicitation number
- RFQ - 29B - 11050200000000001087
- Issued by
- Maine
About this file
Scope of Work Summary: Waterproof Exterior Wall - Bolduc Farm
This Scope of Work document outlines exterior wall waterproofing services required at the Bolduc Farm property in Maine. The project involves the installation of waterproof exterior walls to address moisture infiltration and weather protection concerns at the facility. The scope specifies the materials, labor, and methodologies necessary to complete the waterproofing work, including surface preparation, application of waterproofing systems, and quality assurance measures to ensure long-term durability and performance. The document establishes specific performance standards and acceptance criteria that contractor work must meet upon completion.
The Scope of Work provides detailed technical specifications governing the execution of the waterproofing project, including material requirements, installation procedures, and inspection protocols. The document establishes the baseline requirements and expectations for qualified contractors bidding on this state and local contract opportunity, ensuring consistency in project delivery and adherence to Maine's standards for exterior wall construction and waterproofing applications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Conditions and Instructions to Bidders1.doc | DOC document | |
| PAYMENT METHOD (2).doc | DOC document | |
| Additional Info Terms_ | — |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Bureau of Motor Vehicles
Bolduc Farm Plate Shop
516 Cushing Road Warren, Maine 04864
WORK AREA: Plate Shop 105lf of concrete wall 3 feet high.
SCOPE OF WORK:
· Remove grass turf to expose footing/wall.
· Chip away concrete at base of wall and footing to allow for filling with waterproof mortar.
· Brush apply a negative side cementious waterproofing two coats.
For questions on this RFQ or if a vendor requires a visit to the facility to submit a quote, please contact:
Sole Contact information:
Bambi L. Tefft, Buyer II Division of Purchases Department of Administrative and Financial Services Burton M. Cross Bldg, 4th Floor 111 Sewall Street, 9 State House Station Augusta, Me. 04333 Tel: (207)624-7341 Fax: (207)-287-6578 bambi.l.tefft@maine.gov
File details come from the government source that posted it. Updated .