About this file

This Scope of Work document is a Request for Pricing issued by Bridgewater State University's Facilities Management and Planning Operations Center in Bridgewater, Massachusetts for the purchase, installation, and integration of four Variable Frequency Drives (VFDs) for Air Handler units at the Science and Mathematics Center located at 24 Park Ave, Bridgewater, MA. The project encompasses procurement of VFD equipment and enclosures, installation, wiring (both low and line voltage), conduit work, BACnet communication integration with the existing Energy Management System, and disposal of existing equipment. The VFDs will control four of five air handlers (SF-1 through SF-4) with specifications of 3-phase, 480-volt, 25 horsepower motors. Work must be completed during normal business hours with only one air handler removed from operation at a time to maintain minimum facility airflow and pressure differential. A walkthrough is strongly encouraged with availability on May 20th at 9:00 AM; interested vendors must contact the Operations Center at 508-531-1296 for confirmation at least 24 hours prior to the site visit. Site access is available at the Operations Center located at 200 Great Hill Drive.

Pricing must be itemized with separate line items for labor and materials, and vendors must provide all hardware, components, and permits required for installation. All VFDs and enclosures are to be supplied by the vendor, who is also responsible for removing and disposing of used equipment from the premises. A 50% payment bond is required, and prevailing wage rates apply to all labor. Work includes motor testing to confirm proper rotation in Bypass, Hand, and Auto modes, termination of all wiring, implementation of proper Lock Out/Tag Out procedures, and integration of BACnet points into the existing PLC, supervisor, and server systems. Acceptable VFD manufacturers include Honeywell, Danfoss, or approved equivalents with a minimum 3% AC line reactor or equivalent DC link reactor technology to meet performance and functional requirements.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bridgewater State University: Request for Pricing

May 1, 2026

Bridgewater State University Facilities Management and Planning - Operations Center 200 Great Hill Drive Bridgewater, MA 02325

RE: Science and Mathematics Center Air Handler VFD Installation - Request for Pricing 24 Park Ave, Bridgewater, MA

SCOPE OF WORK:

This is a request proposal for the purchase, demonstration, installation, wiring, and terminations of four (4) Variable Frequency Drives (VFDs). The current VFD system is integrated with and operated through our existing Energy Management System, specifically for the control of Air Handler (AHU) mechanical systems. For this project, please provide a breakdown of materials and labor as separate line items in your proposal.

The scope of work includes all necessary components related to low and line voltage wiring, conduit, MC cable, junction boxes, connectors, fasteners, and any modifications to the metal framing channel structure needed to mount the new equipment to the existing framework. At project closeout, successful completion will be determined by the installation and proper operation of VFD command, speed adjustment, status indication, existing safety interlocks, and BACnet communication to each new device as required for (AHU) operation and Energy Management System integration. This includes connecting existing BACnet 3-wire communication from each respective VFD currently connected to the local network of PLCs, IoT hardware, supervisor, and server.

Only one air handler can be removed from operation during installation. This installation does not allow for multiple air handlers being removed from operation during installation. Building must allow 4 out of 5 air handlers to run to maintain proper air flow and pressure differential. Walkthrough is strongly encouraged, dates available for walkthrough are provided below.

CLARIFICATIONS

• Pricing must be itemized – separate Labor and Materials costs.

• Graphics excluded.

• Vendor to include a 50% payment bond.

• All VFD and enclosures provided by vendor.

• Vendor to remove and dispose of used VFD drive from premise, used equipment cannot be left in mechanical space.

• Proper Lock Out/Tag out procedure to be always implemented by Vendor.

• Work to be completed during normal working hours.

• Prevailing wage rates apply.

• Vendor to provide all hardware to mount to existing frame.

• Label/cap and re-sleeve all existing control circuit wires [speed reference, communication, safety enable relays, and current transducer] per drawing.

• Terminate all low voltage and line voltage wiring.

• Test motor direction/operation of VFD, vendor must confirm Hand, Bypass and Auto operation.

• VFD point integration to server.

• Vendor to provide permits where applicable.

• Walkthrough is available upon request.

WALKTHROUGH SCHEDULE DATES

Walkthrough dates available: Please contact Operations Center 24hrs prior to site visit for confirmation.

May 20th: 9:00am

SITE ACCESS

Facilities Management Operations Center 200 Great Hill Drive, Bridgewater, MA 02325 508- 531-1296

DETAILS

I. APPLICATION - Page 3 II. DETAIL - Page 3 III. ENERGY MANAGEMENT INTEGRATION - Page 3 IV. INFRASTRUCTURE - Page 4 V. INFRASTRUCTURE DETAIL - Page 5 VI. SUPPLY FAN DETAIL - Page 6 VII. LOCAL POINT DETAIL - Page 7

DETAIL

REF UNIT TAG ENCLOSURE CONTACTOR BYPASS APPLICATION COMMUNICATION

A AHU-1 SF-1 NEMA 1 2 Contactor Bypass w/Fused Disconnect

Minimum 3% AC line reactor.

Suitable to application frame size and performance requirements, VFDs incorporating a minimum 5% non-saturating DC link reactor or a multi-pulse rectifier topology may be accepted in lieu of an external line reactor, provided it meets all requirements set forth in the RFP, including performance, and functional criteria.

Manual Bypass Bypass Assembly w/

VFD

BACnet MSTP

SF-3

SF-2

SF-4

ENERGY MANAGEMENT INTEGRATION

UNIT TAG ADDRESS DEVICE NAME NET TYPE DETAILS

AHU-1 SF-1 5 AHU_1_SFVFD1 1 BACnet MSTP BACnet points to be discoverable and integrated into localized PLC, the supervisor and server.

Address and baud to match existing.

Each motor must be tested for proper motor rotation in Bypass, Hand and Auto [per each contactor].

Wiring details included.

Max and Min motor settings remain same as existing.

HOA Status contact must be maintained.

SF-2 6 AHU_1_SFVFD2

SF-3 7 AHU_1_SFVFD3

SF-4 8 AHU_1_SFVFD4

APPLICATION

REF PHASE VOLT HP AMP DIMENSIONS MANUFACTURER APPLICATION QTY

A 3 480 25 13 ½ × 7½ × 30

½ “ Honeywell, Danfoss or approved equal

Air Handler Supply Fan VFD 4

INFRASTRUCTURE

INFRASTRUCTURE DETAIL

SUPPLY FAN DETAIL

POINT LOCALIZATION DESCRIPTION SUPERVISOR VERSION

Start Stop FX-PCA3613 CTRL 8UI, 6BI, 6AO, 6BO Jace 8000 4.2.36.34 Status Speed *HOA Status

* HOA status is a dry contact local to VFD control board. Status is required for CCT program and operation

LOCAL POINT DETAIL

DESCRIPTION POINT HISTORY ALARM INTEGRATION

FrequencySetpoint AV X Localization OutputFrequency X OperatingDays X OperatingHours X KilowattHours X TorqueReference X MotorTempRise X MotorSpeed X SpeedReference X CurrentLimit X MaxFrequency Power X KilowattHoursTotal X MotorCurrent X DCBusVoltage X MotorVoltage X UnitTemperature X MotorTorque X FaultReset BV X X FaultState X X WarningState X X AccelerationTime AV DecelerationTime MinFrequence FrequencySetpoint ActiveFaultCode HAO Status BV X X Dry Contact