Scope of Work Statement New Steamer Lindeman 101819.docx
DOCX document 33 KB Posted
- Attached to
- GRO35- Install Steamer at Lindemann, 2020-003
- Solicitation number
- BD-20-1022-DMH06-6420A-45132
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Scope of Work statement for a project to install a new steamer at the Erich Lindemann Mental Health Center in Boston, Massachusetts. The project is being managed by the Massachusetts Department of Mental Health (DMH) and has an estimated total cost of $13,000, with $3,000 in labor costs and $10,000 in materials and equipment. The current steamer is old and no longer functioning properly, so a new Crown Model SX-5G3 Convection Steamer with a gas-fired stainless steel steam generator is to be installed, along with a table to hold the steamer. The electrical and gas connections will be completed by the contractor, while the plumbing connection will be handled by the DMH. A pre-bid conference walk-through is scheduled for October 24, 2019, and bids are due by October 31, 2019.
The project is classified under the OSD Trade Category of Food Service & Equipment: GRO35. Required forms to be submitted with the bid include the Form for General Bid, Required Licenses/Certificates, Certificate of Insurance, Certificate of Non-Collusion, Contractor Authorized Signatory Form, Payment Bond and Performance Bond (for contracts over $25,000), and OSHA Certificates for all employees. The planned start date for the project is November 20, 2019, and the contract duration is until final completion on the same date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK Project #
Scope of Work Statement MGL Chapter 149 Projects: With Labor Costs of $10,000 to $49,999
AWARDING ENTITY
Awarding Entity: DMH
Agency Name and Address: Dr. Solomon Carter Fuller MHC; 85 East Newton St. Boston, MA 02118
Project Number:
Estimated Total Cost: $13,000
· Estimated Labor = $3,000
· Estimated Materials & Equipment = $10,000
CONTACT INFORMATION
Name and Title: Mark Smith - Mechanical Engineer Phone: 617-626-8850 Email Address: mark.f.smith@state.ma.us
CONTRACT AND BIDDING INFORMATION
Project Name: Install Steamer at the Erich Lindemann MHC
Project Description (brief overview): The current steamer is operating sporadically to sufficiently prepare meals. The steamer is very old and repairs are no longer an option so it is recommended that a new one be installed and a table to hold the steamer (see attached specifications). Electrical and gas connections to be completed by contractor. Plumbing connection to be completed by DMH.
Bid Sets Available (place, date and time): N/A Pre-Bid Conference Walk-Thru (place, date and time): Erich Lindemann MHC, 25 Staniford St. Boston, MA 02114 Thursday 10/24/19 at 10am Bid Deadline: Thursday 10/31/19 at 10am OSD Trade Category: Food Service & Equipment: GRO35
Additional Information: Crown Model SX-5G3 Convection Steamer with gas fired stainless steel steam generator.
DETAILED SCOPE OF WORK
Provide detailed scope of work of sufficient detail to bid on the project. Provide additional drawings, sketches, notes or specifications as needed and check he appropriate boxes below.
· Drawings or sketches attached X Notes or specification attached
· Other attachment, if so, indicate:
PROJECT SCHEDULE
Planned Start Date: 11/20/19
Contract Duration until Substantial Completion: 11/20/19
Contract Duration until Final Completion: 11/20/19
ATTACHMENTS
The following sections are included in the appendices and are part of this contract:
· Instruction to Bidders
· Owner-Contractor Agreement
· General Conditions of the Contract
· Supplemental Conditions of the Contract
· Prevailing Wage Rate Requirements
FORMS
It is the responsibility of the awarding entity to ensure that they obtain the required licenses/certifications from all workers who will be assisting with the work. The following forms are to be completed and submitted with the bid:
· Form for General Bid
· Required Licenses /Certificates
· Certificate of Insurance
· Certificate of Non-Collusion
· Contractor Authorized Signatory Form
· Payment Bond and Performance Bond
· 50% payment bond if total contract is >$25,000
· OSHA Certificates for all employees
Scope of Work Statement Page 1 of 2
File details come from the government source that posted it. Updated .