Scope of Work SSD Windows Project.pdf
PDF 570 KB Posted
- Attached to
- Removal & Installation of Windows at USCG Shore Side Detachment Main Building in Demopolis, AL
- Solicitation number
- 70Z02926QNEWO004
About this file
This is a Scope of Work for window replacement services at the U.S. Coast Guard Shore Side Detachment in Demopolis, Alabama. The Coast Guard is seeking qualified contractors to provide complete removal and installation of windows in 14 rooms of the main building, including all labor, materials, and equipment necessary for the work. The contractor must furnish all installation materials, perform functionality testing and checks on all windows with sliding functions, and conduct field measurements and site evaluations prior to submission. Work must be completed within 30 calendar days after notice to proceed is issued. The contractor shall submit a written safety plan within 7 calendar days of contract award, along with a detailed work schedule including milestones, and removal and application procedures for all building surfaces.
The work location is U.S. Coast Guard Shore Side Detachment, 1900 Coast Guard Road, Demopolis, AL 36732, with coordination through the government Point of Contact, MKC Zachary Mason at (251)214-5671 or Zachary.S.Mason@uscg.mil. Reasonable amounts of electricity, potable water, and restroom facilities will be provided at no charge, though the contractor pays all connection and conversion costs. The contractor is responsible for site security, material storage and protection, daily cleanup, waste disposal at permitted facilities, and compliance with all federal, state, and local safety regulations including OSHA requirements and the U.S. Army Corps of Engineers Safety and Health Requirements Manual (EM 385-1-1). All warranties on furnished equipment shall be endorsed to the Government. The contractor must provide a personnel list for site access, ensure all workers carry proper identification, and coordinate work to minimize interference with Coast Guard operations. Final inspection requires submission of a written request with at least two weeks' notice and approval of all submittals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 30 Amendment 1 - Replace Windows - s.pdf | ||
| Questions and Answers 2-13-2026.docx | DOCX document | |
| Questions and Answers 2-12-2026.docx | DOCX document | |
| Construction Terms and Conditions.pdf | ||
| SF 1442 - Replace Windows.pdf | ||
| Construction Wage Rates for Marengo County AL.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Homeland Security
United States Coast Guard
Scope of Work
For
Window Replacement
RPUID: 00000
At
U.S. Coast Guard
SHORE SIDE DETATCHMENT DEMOPOLIS
18 February 2024
Commanding Officer
United States Coast Guard
Cutter WEDGE (WLR-75307
Demopolis, AL 36732
Submitted: MKC Zachary Mason
Engineer Petty Officer
SCOPE OF WORK FOR REPLACEMENT OF WINDOWS
TABLE OF CONTENTS
Section Title Page
1 Description of Work 3
2 Submittals and Outcome 3
3 Project Performance Timeline 3
4 Location 3
5 Point of Contact 3
6 Drawings and Reference Files 4
7 Work Phasing 6
8 Availability of Utilities 6
9 Coordination 7
10 Contractor Use of Premises 7
11 Laydown Area 7
12 Storm Protection 7
13 Environmental Protection 7
14 Delivery and Storage 7
15 Receipt of Materials 8
16 Cleanup 8
17 Utility Outages 8
18 Security 8
19 Quality 8
20 Warranties 8
21 Final Inspection and Acceptance 8
22 Safety 9
1 DESCRIPTION OF WORK
U.S. Coast Guard Cutter WEDGE (WLR-75307) is accepting proposals for qualified individuals or firms to provide services for the complete removal and installation of all windows in 14 rooms of the Shore Side Detachment (SSD) main building. Contractor will furnish all installation materials to install windows. Contractor will also perform functionality test and checks of all windows installed with sliding functions. We request contractors furnish labor, materials, and equipment to replace above noted items. Prior to submitting a quote, it is mandatory to examine the SOW and it is highly recommended to conduct a site visit to the facility to take field measurements, evaluations, etc, and become familiar with existing conditions under which the work will be performed.
2 SUBMITTALS AND OUTCOMES
2.1 Safety Plan (see 22.3)
2.2 The Contractor shall submit a work schedule including all milestones within seven (7) calendar days following contract award.
2.3 Submit removal and application procedures for all building surfaces.
3 PROJECT PERFORMANCE TIME
The contractor must complete all work, deliverables, and outcomes within Thirty (30) calendar days after notice to proceed is given by the Government.
4 LOCATION
All work shall take place at:
U.S. Coast Guard Shore Side Detachment
1900 Coast Guard Road
Demopolis, AL 36732
5 POINT OF CONTACT
The Government Point of Contact (POC) for this work is MKC Zachary Mason, (251)214-5671, Zachary.S.Mason@uscg.mil. All work shall be coordinated through the POC to minimize operational impacts to the unit during the execution of the work.
6 DRAWINGS AND REFERENCE FILES
Photo 1 – UPH Room with cracked pane bottom right.
Photo 2 – UPH Room
Photo 3 – UPH Room
Photo 4 – UPH Room
Photo 5 – Patio
Photo 6 – Office
Photo 7 – Log Office
Photo 8 – Head
Photo 9 - Galley
Photo 10 – Mess Deck
Photo 11 – Garage
SSD Building Layout
7 WORK PHASING
Work shall be completed as expeditiously as possible; Contractor shall coordinate with the POC to coordinate phasing and job sequencing. Contractor shall submit construction schedule for Government review and approval prior to commencing in any work to be performed.
8 AVAILABILITY OF UTILITIES
Reasonable amounts of the following utilities will be made available to the Contractor without charge.
+ Electricity
+ Potable Water
+ Restroom facilities/showers
The Contractor shall pay all costs incurred in connecting, converting, and transferring the utilities to the work. The Contractor shall be responsible for making connections including providing back flow preventer devices on connections to domestic water lines, providing transformers, and for disconnections. The POC shall designate the outlets available to the Contractor.
9 COORDINATION
The Contractor shall coordinate with the POC to minimize interference with Coast
Guard operations or personnel. All work shall be coordinated with other trades involved in the project and carefully laid out in advance.
10 CONTRACTOR USE OF PREMESES
The Contractor will be working on a Coast Guard operational military installation.
Become familiar with and obey installations’ fire, traffic, and security regulations.
Personnel shall not stray from the immediate area of work nor direct avenues of ingress and egress unless authorized in advance by the Government.
11 LAYDOWN AREA
The Contractor will be provided with an uncovered lay-down area in the immediate vicinity of the work. The Contractor shall be responsible for restoring the area to its original condition at the completion of the work. The Contractor shall be responsible for repair of any damage incurred to buildings, vehicles, boats, equipment, or pavement as a result of storage activities.
12 STORM PROTECTION
Should warnings of extreme weather (such as high waves, storm surge, wind of gale force) be issued, the Contractor shall take every practicable precaution to minimize danger to personnel, the work and adjacent property. Precautions shall include, but not be limited to, relocating barges, closing all openings, removing all loose materials, tools and equipment from exposed locations, and removing or securing fencing, scaffolding and other temporary work.
13 ENVIRONMENTAL PROTECTION
All Federal, State and local laws must be strictly adhered to. Demolition and construction debris shall be disposed of at a permitted facility.
14 DELIVERY AND STORAGE
Equipment and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer's recommendations. Damaged or defective items shall be replaced.
Location of storage and staging area shall be designated by the POC. The contractor will be responsible for security of all materials and equipment.
15 RECEIPT OF MATERIALS
Shipment of equipment, materials, and supplies shall be addressed to the Contractor -not the Government. The Contractor must be on hand to accept shipments; the
Government will not accept shipments.
16 CLEANUP
The Contractor shall keep the work area, including storage areas, free from accumulations of waste materials daily and comply with all federal, state and local regulations pertaining to the storage, transport and disposal of wastes. The Contractor shall not use Coast Guard waste disposal facilities including garbage cans, trash piles or dumpsters.
17 UTILITY OUTAGES
Before interrupting or shutting down any utility, make a request for the interruption to the POC at least two (2) working days before the anticipated interruption. Identify the utility, reason for interruption, proposed time of interruption, and duration of interruption. Do not interrupt utilities until authorized by the POC.
18 SECURITY
18.1 Working Personnel List.
The Contractor shall provide the COR with a list of names of all personnel who will be working on the site. The Contractor may submit a revised list at any time during the project. Only personnel on the approved listing will be allowed on the site.
18.2 Personnel Identification
All personnel shall carry proper identification (ID) when on site. Proper ID is defined as either the individual’s driver’s license, or a company issued ID. The identification must be laminated and show facial picture of the individual. Individuals without proper ID will be escorted off the Coast Guard premises.
19 QUALITY
Quality of Contractor Furnished Material. Materials supplied by the Contractor shall be of a quality conforming to applicable Federal specifications.
20 WARRANTIES
All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government.
21 FINAL INSPECTION AND ACCEPTANCE
When the work is complete and ready for final inspection, submit a written request to schedule final inspection to the Government. Prior to such requests, all submittals must be complete and approved. Such requests shall allow a minimum of two (2) weeks notice prior to final inspection date.
22 SAFETY
22.1 General
The Contractor is wholly responsible for work site safety. The Contractor shall implement a safety program that protects the lives and health of personnel in the construction area, prevents damage to property and avoids work interruptions. The
Contractor shall provide appropriate safety measures including, but not limited to barricades, signs and signal lights as well as complying with the requirements of all applicable Federal, State and Local safety laws, rules and regulations.
22.2 Compliance
The Contractor is specifically required to comply with the requirements of the U. S.
Army Corps of Engineers "Safety and Health Requirements Manual" (EM 385-1-1, latest version available) and the “Accident Prevention” clause (FAR 52.236-13).
Once accepted, this safety plan shall become part of the contract requirements. Note:
This review/acceptance does not in any way relinquish the Contractor from responsibility for work site safety nor the obligation to comply with the OSHA regulations found in 29 CFR 1910 & 1926 or any other State or Local safety law, rule or regulation applicable to the contract work. The Coast Guard will cooperate fully with the Department of Labor (Occupational Safety and Health Administration) in their enforcement of OSHA regulations.
22.3 Safety Plan
The Contractor shall submit a written safety plan within seven (7) calendar days following contract award. At a minimum, this plan shall describe the Contractor's general safety program and identify specific safety provisions for hazards incidental to the contract work such as elevated working surfaces, working over water, working from floating work platforms, overhead crane operations or similar conditions of the work. This Safety Plan shall be approved prior to commencing any work on site.