Scope of Work revised.pdf

PDF 425 KB Posted

Attached to
BETHUNE EXTERIOR LIGHTING SOLICITATION
Solicitation number
5400028080
Issued by
Lancaster County, South Carolina

About this file

This is a Scope of Work document from the South Carolina Department of Transportation (SCDOT) for an exterior lighting upgrade project at the SCDOT Bethune Section Shed in Kershaw Maintenance, located at 600 North Main Street, Bethune SC. The project involves installing four new 30' wood poles with Lithonia Lighting RSXF2 fixtures and aerial wiring at facility corners, one new Lithonia Lighting TWX3 LED wall pack on the salt shed front, and two new Lithonia Lighting CPRB high bay fixtures in the salt shed rear. The work must be completed within 14 calendar days from the Notice to Proceed, with working hours of 7:30 a.m. to 5:00 p.m. Monday through Friday, excluding state holidays.

The project will be paid as a single lump sum payment upon completion and acceptance, covering all materials, labor, and expenses. The contractor must be licensed electricians and is responsible for site visits to assess conditions, employee safety, and any property damage. Building exits must remain accessible during construction except when work is being performed directly overhead. The document includes both an aerial map showing the facility location and a sketch depicting the lighting upgrade plan with marked fixture locations.

View the file

Other files

File Type Posted
Request For Bid Revised.pdf PDF
Notice to Bidders.pdf PDF
Request For Bid.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCDOT Bethune Section Shed February 2025 Exterior Lighting Upgrade

Project Name:

Building Number:

Drawings:

Proposed Work:

Project Location:

Directions:

Owner:

SCOPE OF WORK

SCDOT Bethune Section Shed, Kershaw Maintenance Exterior Lighting Upgrade

1280200

Sketch attached

Replace/Install polls and exterior lights

600 North Main Street, Bethune SC, 29009

From I-20, take exit 116 toward Bishopville approximately 3.3 miles then turn right on to Church Street approximately .75 mile, facility is on the left

South Carolina Department of Transportation

SCOPE OF WORK

1. Proposed Work:

• Furnish and install four (4) new 30’ wood poles, Lithonia Lighting RSXF2 fixtures, and arial wiring to the new poles at each of the four corners of the facility. Tie the new wiring to the near-est existing lighting circuits located at the salt shed and office building and provide photocells to operate the fixtures.

• Furnish and install one (1) new Lithonia Lighting TWX3 LED wall pack on the front of the salt shed, remove the existing nonfunctioning fixture, and provide a photocell to operate the new fix-ture.

• Furnish and install two (2) new Lithonia Lighting CPRB high bay fixtures in the rear of the salt shed, remove the two (2) old existing fixtures, and provide a photocell to operate the fixtures.

2. Performance:

The work shall be done by skilled, experienced and licensed electricians in accordance with the best practices of the trade in modern construction.

3. Cleanup:

Upon completion of the work all surfaces shall be left clean and free from defects. Any defective work shall be replaced or otherwise made good as directed by the SCDOT Project Manager, and without cost to the Owner.

4. Workmanship:

All bidders are expected to visit the site of the work and to inform themselves as to all existing conditions.

Failure to do so in no way relieves the successful bidder from the necessity of furnishing all equipment and materials and performing all work required for the completion of the contract in conformity with all specifications.

No allowance will be made for the failure of the bidder to correctly estimate the difficulties attending the execution of the work.

5. Protection of Building Exits:

The contractor shall protect building egress (exits) at all times during working hours. Exits shall remain open except when work is being performed directly over the exit. The exit shall then be barricaded off by temporary means. Temporary barricades shall be removed as soon as work is completed or immediately in case of emergency.

6. Responsibility for Employees:

The Contractor shall be responsible for the safety of his employees and materials and for any injury or damage to or by them from any source or cause. He shall save and hold SCDOT free from all claims for damages to any and all persons and/or property arising from the execution of the work covered by these specifications.

The Contractor shall make good at his own expense all damage to any property of the SCDOT arising from his operations under these specifications, or from the fault or neglect of any of his employees.

7. Payment:

A single lump sum payment will be made when the work has been completed and accepted, which shall comprise of full payment for all materials, labor, and expenses necessary to produce the finished job complying with these specifications.

Working Hours: 7:30 a.m. to 5:00 p.m.

Monday – Friday, except state holidays

Construction Time: Fourteen (14) calendar days from the date of the “Notice to Proceed.”

SKETCH

SCOPE OF WORK
Project Name: SCDOT Bethune Section Shed, Kershaw Maintenance
Exterior Lighting Upgrade
Building Number: 1280200
Drawings: Sketch attached
Project Location: 600 North Main Street, Bethune SC, 29009
Owner: South Carolina Department of Transportation
SCOPE OF WORK

File details come from the government source that posted it. Updated .