Scope of Work Fuller Kitchen Equipment PM Contract~3.pdf
PDF 1 MB Posted
- Attached to
- Fuller PM Food Equipment Services
- Solicitation number
- BD-22-1022-DMH06-6410A-72399
- Issued by
- Suffolk County, Massachusetts
About this file
This document is a Scope of Work for a state and local contract opportunity issued by the Department of Mental Health (DMH) for the Dr. Solomon Carter Fuller Mental Health Center in Boston, Massachusetts. The contractor shall provide monthly Preventative Maintenance (PM) services to all of the Center's main kitchen equipment. The term of the contract shall be 2 years 3 months starting April 1, 2022 to June 30, 2024, with an option to renew for two consecutive years. A mandatory pre-bid conference walkthrough is scheduled for March 24, 2022 at 9:00 AM, and bids are due by March 29, 2022 at 10:00 AM.
The total estimated contract value is $6,000 for FY22, $25,000 for FY23, and $26,000 for FY24, with 100% labor costs. The contractor shall bill monthly after service is completed, and parts will be billed at the contractor's cost plus no more than a 15% markup. The Facility Engineer will review and approve any needed parts replacements prior to work being performed.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PW Fuller Kitchen PM.pdf | ||
| Appendix B- Fuller Food Service Equipment.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK Fuller PM Food Equipment Services
Scope of Work Statement Page 1 of 3
Scope of Work Statement
MGL Chapter 149 Projects: With Labor Costs of $10,000 to $49,999
AWARDING ENTITY
Awarding Entity: DMH Agency Name and Address: Dr. Solomon Carter Fuller MHC; 85 East Newton St. Boston, MA 02118 Project Number:
Estimated Total Cost:
$6000 4/1/22-6/30/22 (FY22)
$25,000 7/1/22-6/30/23 (FY23)
$26,000 7/1/23-6/30/24 (FY24)
Labor = 100% Materials & Equipment = $ 0
CONTACT INFORMATION
Name and Title: Mark Smith Mechanical Engineer Phone: 617-626-8850 Email Address: mark.f.smith@mass.gov
CONTRACT AND BIDDING INFORMATION
Project Name: Fuller PM Food Equipment Services
Project Description (brief overview): The contractor shall provide monthly Preventative Maintenance (PM) services to all of the Dr. Solomon Carter Fuller Mental Health Center's main kitchen equipment.
Bid Sets Available (place, date and time): N/A
Mandatory Pre-Bid Conference Walk-Thru (place, date and time): Dr. Solomon Carter Fuller MHC; 85 East Newton St. Boston, MA 02118; Thursday 3/24/22 at 9:00am; Note: A site visit to the Solomon Carter Fuller Mental Health Center by the prospective bidders is a prerequisite for submitting a bid. Bidders may contact Mark Smith at (617) 626-8850 with any questions.
Bid Deadline: Tuesday 3/29/22 at 10:00 AM
OSD Trade Category: GRO40
Additional Information: The term of the contract shall be 2 years 3 month starting April 1st, 2022 to June 30, 2024, with the option to renew for two (2) consecutive years. Funding is subject to the appropriation of funds by the Legislature, in each fiscal year, for the purposes of this Contract. Contract to be billed monthly after service is complete.
Scope of Work Statement Page 2 of 3
DETAILED SCOPE OF WORK
Provide detailed scope of work of sufficient detail to bid on the project. Provide additional drawings, sketches, notes or specifications as needed and check he appropriate boxes below.
Drawings or sketches attached Notes or specification attached X Other attachment, if so, indicate: See Appendix A (Detailed Scope of Work) & Appendix B (List of Equipment – subject to modifications – final list to be provided at pre-bid walk-thru)
PROJECT SCHEDULE
Planned Start Date: April 1st, 2022
Contract Duration Until Substantial Completion: N/A
Contract Duration Until Final Completion: N/A
ATTACHMENTS
The following sections are included in the appendices and are part of this contract:
Instruction to Bidders Owner-Contractor Agreement General Conditions of the Contract Supplemental Conditions of the Contract X Prevailing Wage Rate Requirements
FORMS
It is the responsibility of the awarding entity to ensure that they obtain the required licenses/certifications from all workers who will be assisting with the work. The following forms are to be completed and submitted by the awarded bidder:
Form for General Bid Required Licenses /Certificates X Certificate of Insurance Certificate of Non-Collusion Contractor Authorized Signatory Form Payment Bond and Performance Bond
50% payment bond if total contract is >$25,000 OSHA Certificates for all employees
Scope of Work Statement Page 3 of 3
APPENDIX A: Detailed Scope of Work
1. Preventive maintenance (PM) is defined as the testing, lubricating, tightening, filter cleaning, coil cleaning and Freon charging (if needed) on a monthly basis in accordance with the equipment manufacturer's maintenance specifications. The Contractor shall clean up all dust & debris from the PM service prior to leaving Facility.
2. The contractor shall provide preventive maintenance for the listed equipment in appendix B and as updated during the pre-bid walk-thru.
3. PM contract includes all labor to replace defective parts. Parts charges can be seen in #6.
4. Equipment requiring replacement parts at the time of the monthly inspection shall be brought to the attention of the Facility Engineer prior to review and approval.
5. The Facility Engineer will review the need for parts replacement with contractor. Prior to parts replacement, the contractor will submit to the Facility Engineer a written cost proposal to replace the needed part. The Facility Engineer will forward the cost proposal to the Business Office for the issuance of a purchase order. If the replacement is approved, there will be no additional charge for labor.
6. The Contractor shall bill for parts at their cost, plus a percentage no greater than 15%. Facility Engineer can request verification of Contractors cost if a part cost needs to be verified.
7. The contractor shall assure that maximum response time to emergency service request is not more than 48 hours after call is received.
8. Facilities Engineer shall be notified when contractor is onsite, prior to starting PM services each month. Upon completion of service, a copy of service receipt bearing the technician's signature & date shall be prepared and emailed to the Facility Engineer within a reasonable amount of time.
9. Contractor must meet with Facility Engineer prior to start date of this contract to schedule PM visits at a time convenient to facilities. Contractor is required to service the equipment the same day each month for continuity and scheduling ease. The equipment can be serviced best early morning.
Parking is available on the premises.
10. During the duration of this contract if new equipment is added to Equipment List there will be no additional monthly PM charge. If equipment is taken “out of service” there is no change in contract monthly costs.
11. Payment shall be remitted in accordance with Commonwealth of Mass. rules and regulations. A copy of signed receipt of service is required to be submitted with invoice.
File details come from the government source that posted it. Updated .