SCOPE OF WORK ECSC ROOF REPLACEMENT.pdf

PDF 167 KB Posted

Attached to
RFP Complete Roof Replacement
Solicitation number
5/12/2026-RFP
Issued by
Erie County, Ohio

About this file

This is a Scope of Work document for the Erie County Senior Center in Sandusky, Ohio, detailing a complete roof replacement project utilizing a Duro-Last roofing system. The project involves the removal of the existing roofing system down to the structural deck, inspection and replacement of any damaged decking, substrate preparation, and installation of a 60-mil reinforced PVC membrane in white with polyiso insulation meeting Ohio Energy Code R-value requirements. The scope includes installation of prefabricated Duro-Last flashings for all penetrations, brown Duro-Last perimeter edge metal, reworking or replacement of roof drains to ensure positive drainage, and daily cleanup and debris removal throughout the project duration.

The contractor is responsible for furnishing all labor, materials, equipment, supervision, permits, and disposal services in accordance with HUD standards, local building codes, and Duro-Last manufacturer specifications. The project requires compliance with OSHA 29 CFR 1926 construction safety standards while maintaining safe access for Senior Center occupants and preventing dust and debris from entering occupied areas. A Duro-Last 25-year NDL warranty and contractor workmanship warranty are required, along with submission of warranty documents, as-built roof plans, maintenance recommendations, material certifications, and final inspection reports at project closeout. Bid and Performance Bonds are required, and Davis Bacon Prevailing Wage requirements with weekly certified payroll reports apply to this project.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK

Complete Roof Replacement – Erie County Senior Center 620 E. Water Street Sandusky, Ohio

Duro-Last Roofing System

1. General Requirements

The Contractor shall furnish all labor, materials, equipment, supervision, permits, and disposal necessary to complete the roof replacement in accordance with HUD standards, local building codes, and Duro-Last manufacturer specifications. The Contractor shall verify all field dimensions and existing conditions prior to starting work and maintain a safe, clean worksite throughout the project.

2. Demolition & Removal

• Remove the existing roofing system down to the structural deck, including membrane, insulation, flashings, fasteners, and perimeter metal.

• Inspect the roof deck for rot, corrosion, or structural damage.

• Replace damaged decking on a unit-price basis approved by the Owner.

• Provide daily weather protection to prevent water intrusion.

• Remove abandoned penetrations and patch the deck as required.

• Dispose of all debris at an approved facility.

3. Substrate Preparation

• Clean and prepare the deck per Duro-Last specifications.

• Ensure substrate is smooth, dry, and free of debris.

• Install cover board where required by manufacturer or code.

• Verify slopes and identify areas requiring tapered insulation.

4. Roofing System Installation

4.1 Duro-Last PVC Membrane

• Install reinforced PVC membrane 60-Mil color white.

• Fully adhered or mechanically fastened per manufacturer design.

• Heat-weld all seams to ensure watertight integrity.

4.2 Insulation

• Install polyiso insulation to meet or exceed current Ohio Energy Code R-value.

• Stagger joints and mechanically secure.

• Install tapered insulation where needed to improve drainage.

4.3 Flashings & Penetrations

• Install prefabricated Duro-Last flashings for all curbs, vents, pipes, skylight and HVAC units.

• Install new pitch pans where required.

• Heat-weld all flashing seams.

4.4 Perimeter Metal

• Install Duro-Last Edge Metal or approved equal. Color Brown

• Include fascia, coping, termination bars, and fasteners.

4.5 Drainage

• Rework or replace roof drains as needed.

• Install new clamping rings and strainers.

• Ensure positive drainage across the entire roof.

5. Safety & Environmental Requirements

• Comply with OSHA 29 CFR 1926 construction safety standards.

• Provide fall protection, barricades, and signage.

• Maintain safe access for Senior Center occupants.

• Prevent dust, odors, and debris from entering occupied areas.

• Dispose of debris at an approved facility; recycling encouraged.

6. Quality Control & Inspections

• Work must comply with HUD Housing Quality Standards where applicable.

• Coordinate inspections with the Owner, local building department, and Duro-Last technical representative.

• Correct all deficiencies at no additional cost.

7. Warranty Requirements

• Provide Duro-Last 25-year NDL Warranty.

• Provide Contractor workmanship warranty per the Duro-Last 25 year warranty

• Submit all warranty documents at project closeout.

8. Cleanup & Site Restoration

• Remove debris daily.

• Protect landscaping, sidewalks, and building surfaces.

• Restore any damaged areas to original condition.

• Leave the site clean and free of construction waste.

9. Project Closeout/Wages Bonds

• Conduct final walkthrough with the Owner and Duro-Last representative.

• Provide warranty documents, as-built roof plan, maintenance recommendations, material certifications, and final inspection reports.

• Bid & Performance Bonds Required

• Davis Bacon Prevailing Wage, Weekly Certified Payroll Reports Required