SCOPE OF WORK.pdf

PDF 378 KB Posted

Attached to
220025 CBJTC 3600 Area Avenues Paving Invitation To Bid
Solicitation number
ITB-16521
Issued by
St. Johns County, Florida

About this file

This Scope of Work document is issued by the Directorate of Public Works at Camp Blanding Joint Training Center under the Florida Army National Guard to solicit bids for repaving three avenues (Bartow, Miramar, and Sarasota) at the facility located in Starke, Florida. The project requires contractors to remove grass from roadway edges and driveways, mill existing asphalt to remove deficient areas, apply FDOT-approved tack product at 0.10 gallons per square yard, and install two lifts of hot mix asphalt consisting of a leveling course of approximately 1.5 inches of SP-12.5 mix (maximum 30% RAP) followed by a final 1.5-inch layer of 12.5 mix per FDOT standards. The scope mandates replacement of all culverts crossed by new paving on a like-for-like basis with concrete mitered ends, cleaning of roadside ditches to maintain proper drainage, and installation of new sod in all areas where grass is stripped or damaged. All inspections, testing, and contractor-caused repairs to concrete ditch linings are included in the contractor's responsibility and bid costs. A mandatory pre-bid site visit is required for all prospective bidders, with the solicitation dated July 22, 2026, and an estimated construction cost of $580,000.

The project includes compaction testing requirements of 98% or higher for base and sub-base materials in areas with existing utility cuts prior to paving, with all testing costs included in the bid. All millings, dirt, and other recyclable materials must remain on Camp Blanding and be managed according to project specifications. Contractors must obtain and pay for all required building permits from local authorities, with the exception of Fire Marshal jurisdiction which remains with the State Fire Marshal for compliance with uniform fire safety standards. Contractors governing fields under Florida Statutes Chapters 399, 455, 489, and 633 must submit qualification data including Form FNG 5085 Contractor's Experience Questionnaire and Financial Statements at bid opening. The contractor is responsible for determining all permits, fees, and impact fees required by entities having jurisdiction over the project and must include these costs in the bid proposal.

View the file

Other files

File Type Posted
Part 1 Cover Supplemental Conditions.pdf PDF
Part 2 General Terms and Conditions.pdf PDF
Invitation To Bid.pdf PDF
Qualifications Requirement Instructions.pdf PDF
MAP.pdf PDF
Proposal and Subcontractors List.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DIRECTORATE OF PUBLIC WORKS

CAMP BLANDING JOINT TRAINING CENTER

FLORIDA ARMY NATIONAL GUARD

5629 STATE ROAD 16 WEST, BUILDING 2300

STARKE, FLORIDA 32091-9703

29 April 2026CBJTC-DPW

MEMORANDUM FOR: Bidders Pre-Bid SITE VISIT IS MANDATORY.

SUBJECT: 220025 CBJTC 3600 Paving_Bartow, Miramar and Sarasota AVENUES.

Scope of Work

Repave the Streets identified in the attached map, at the Camp Blanding Joint Training Center.

Prior to paving, remove all grass from roadway edges and driveways.

All Streets will be milled of existing asphalt to remove all deficient areas.

All inspections and testing are the responsibility of the contractor and cost must be included in your bid.

Following clean-up an FDOT approved tack product will be applied by use of a heated distributor truck at a rate of 0.10 gallons per square yard.

Following the application of the FDOT approved tack product, a leveling course (1st lift, approximately 1 ½ inches) of SP-12.5 hot mix asphalt (maximum 30% RAP) will be placed by spreader and compacted prior to further work. 2nd lift, final paving to consist of 1 1/2" of 12.5 mix per FDOT Standards. There shall be a 2% fall from the centerline of the road to each edge of road.

Anywhere the new paving crosses a culvert, the culvert is to be replaced (with like for like), and concrete mitered ends added. (See Project Notes (2.) below)

Project Notes:

All new culverts shall be concrete. The shape and size must remain as original. All culverts must be replaced to their original inverts and maintain a positive flow from culvert to culvert.

All roadside ditches along newly paved roads must be cleaned from culvert to culvert and maintain a natural flow from culvert to culvert. Some ditches are concrete lined. The contractor shall repair any of the concrete lining which is damaged by their equipment.

All Avenues that have existing utility cuts will require testing for densities of base and sub-base compaction. All testing must reach 98% compaction or higher prior to paving.

Any areas that have grass stripped or damaged will require new sod. No seeding allowed. Contractor must water until sod is established.

ALL millings, dirt or other recyclable materials shall remain on Camp Blanding and will be

220024 - 3600 Paving _ Ludlow, Bristol, Greenwich, Winter Haven Streets_7JUL26_Procurement Request.pdf
220024 - 3600 Paving - Ludlow, Bristol, Greenwich, Winterhaven Streets_SOW and Bidding Sheet.pdf
12220024_420 3600 Paved Streets.pdf

File details come from the government source that posted it. Updated .