Scope of Work.pdf

PDF 489 KB Posted

Attached to
Portable Latrine Waste Removal
Solicitation number
020460
Issued by

About this file

This Scope of Work details a Portable Latrine Waste Removal contract for Fort Gordon, Georgia. The contract requires weekly pump out and disposal of waste from two 1,000-gallon tanks at building 29810, with services to be performed Monday through Friday between 0900-1600 hours. The contract is firm-fixed price with a base year from 2 September 2025 to 1 September 2026 and an option year from 2 September 2026 to 1 September 2027. Contractor employees must be U.S. citizens with installation access, and the contract includes provisions for potential surge support with 30-60 days notification if additional waste removal services are required. The scope specifies that waste removal will initially be conducted weekly for 6 months, with flexibility to adjust based on usage.

View the file

Other files

File Type Posted
Layout.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work Portable Latrine Waste Removal

Scope of Work: Pump out and dispose of waste to an offsite location from two 1,000-gallon tanks weekly or as required.

Description of Services: Pump out waste from two 1,000-gallon tanks weekly or as required and dispose of waste to an offsite location. Contractor will have the waste pumped out of two 1,000-gallon tanks and disposed of to an offsite location between the hours of 0900 – 1600. Waste removal will be conducted weekly for 6 months and is subject to change due to usage.

Period of Performance: The period of performance shall be for one (1) Base period of 12 months and one (1) option period.

The Period of Performance reads as follows:

Base Year 2 September 2025 – 1 September 2026 Option Year 1 2 September 2026 – 1 September 2027

Surge: Pump out waste support capabilities is required throughout the life of this contract.

Specific surge requirements will be identified as requirements change though contract modification. Should a surge be required, the Government may purchase additional pump out waste services support. When possible, the Contractor will receive 30 to 60 calendar day notification lead time if an additional surge is utilized/executed.

Type of Contract: This is a Firm-Fixed Price contract.

Hours of Operation: Monday – Friday, 0900hrs – 1600hrs

Place of Performance: The work to be performed under this contract will be performed at Fort Gordon, Georgia, building 29810.

Security Requirements: Contractor employees performing on this contract/task order must be U.S. citizens, and have the ability to gain access to Fort Gordon, Georgia.

Installation Access. All Contractor employees, including subcontractors, shall comply with applicable installation and facility access security policies and procedures at all work locations.

Identification of Contractor Employees: In accordance with FAR 37.114

Contractor employees shall always identify themselves as a Contractor while on the job, e.g., in the workplace, when attending meetings, in email, when answering Government telephones, or when making phone calls.

Enclosures:

Building 29810 Ground Layout Bestway Septic Quote Major Contracting Service Quote

File details come from the government source that posted it. Updated .