This Scope of Work document is for the City of Meriden, Connecticut's Station 5 Basement Water Remediation Project, detailing comprehensive waterproofing and moisture control services for a basement space. The project specifications include installing a sub-floor drainage system, XL TrenchDrain, feed lines, underground discharge lines, and a TripleSafe pump system with primary and backup pumping capabilities. Additional elements include installing an Ice cop to prevent discharge line flooding, a discharge grate, electrical outlets, a SaniDry Sedona system to control humidity, and a CleanSpace Wall System.

The contractor will be responsible for all permit costs and is required to provide a dry floor warranty for the entire basement. The City of Meriden will prepare the workspace by moving items 4 feet from the perimeter and removing belongings, including appliances and storage items. The project involves working with a block wall with a plain finish and a concrete floor, with a discharge line extending 30 feet away from the building. The scope of work emphasizes a comprehensive approach to basement water management and moisture control, ensuring a dry and functional basement environment.

View the file

Other files

File Type Posted
B026-08_Station_5_Water_Remediation_Bid_Package.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

Specifications

1) Install sub-floor drainage system as indicated in job drawing.

2) Install XL TrenchDrain as shown on drawing.

3) Install feed line as shown on drawing.

4) Install Interior Underground Discharge Line as shown in drawing.

5) Install TripleSafe pump system with twin liner, 1/3 hp cast iron primary AC pump, 1/2 hp cast iron AC back-up pump, and battery back-up pumping system with charging/control box with alarm, and 120 amp sealed maintenance free battery. Includes 3 Clean Pump stands, an airtight lid with airtight floor drain, and an audible alarm system.

6) Install battery back-up pumping system with charging/control box with alarm and 120 amp sealed maintenance-free battery.

7) Install lce cop to prevent floods from clogged or frozen discharge line.

8) Install discharge grate at end of discharge line.

9) Install discharge line as shown.

10) Install electrical outlet for TripleSafe as shown.

11) Install SaniDry Sedona with SaniDry Stand to keep humidity low.

12) Install electrical outlet for SaniDry as shown.

13) Install CleanSpace Wall System on walls as shown on drawing.

All permit costs shall be the sole responsibility of the awarded contractor.

The City of Meriden will move all impeding items 4 feet away from perimeter and remove all belongings from the workspace including washer and dryer, shelving/cabinets/sink/workbench, and electrical/data box where discharge line needs to exit.

Additional Notes.

Type of Wall - Block Existing Wall Finish - Plain Existing Floor Finish - Concrete Discharge line length away from building – 30 Feet.

Contractor shalll provide a dry floor warranty for the entire basement