The document is a Scope of Work for a project to repair, replace, and stain the cedar siding at the Sunray Crest IRA facility located in Victor, New York. The work is to be completed within 90 days of award and includes removing and replacing rotted siding, re-securing loose siding, pressure washing and staining the entire exterior. This is a New York State Public Works project, and prevailing wages must be paid. A mandatory site visit is scheduled for May 15, 2024 at 10:00 AM, and bids are due by May 23, 2024 at 8:00 PM.

The bid price is to include all materials, labor, disposal of materials, and site cleanup. The residence will be occupied during the work, and the contractor must take reasonable care to safeguard the residents and staff. Smoking is prohibited, and the contractor must coordinate all work with the House Director and Plant Superintendent. This project is not a Service-Disabled Veteran-Owned Set Aside, and the contract term is 30 days after completion of the project.

View the file

Other files

File Type Posted
Request for Quote.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT SCOPE

DESCRIPTION:

Repair, replace and stain cedar siding . The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Stain/Paint will be a Sherwin Williams product and the colors will be the same as the existing. Repairs up to100 linear feet of siding/trim/soffit are included in this contract. Work is to be completed within 90 days of award, unless modified below. This is a NYS Public Works project and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned and all materials secured at the end of each workday. Absolutely no scraps, especially fasteners, are to be left unsecured. Upon completion of (project item), before removal of equipment and scaffolding, contractor is to schedule a quality control and quality assurance inspection with the point of contact.

SCOPE OF WORK includes, but is not necessarily limited to the following:

1. Remove and replace rotted cedar siding

2. Resecure siding that is loose / nails have pulled through

3. Resecure soffit unless rotted or broken, then replace.

4. Pressure wash – prep for new stain

5. Caulk gaps and penetrations in the siding assembly with Formula 230 paintable caulking

6. Stain the entire exterior of the house

GENERAL REQUIREMENTS:

1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up.

Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.

2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.

3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.

4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.

5. Smoking is prohibited by contractors at all residential and program sites owned by

OPWDD.

Facility: Sunray Crest IRA

Facility Address: 6469 Sunray Crest Dr, Victor NY 14564

Point of Contact:

Geoffrey Miller

Contact Phone Number:

315 604 1430

Project Title:

Sunray Crest Exterior Paint

Summary of Work: Repair, Replace and Stain siding

6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.

7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.

8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.

SITE VISIT

The site visit is mandatory. The site visit date is scheduled for Wednesday, May 15 @ 10:00am at the project site. All prospective bidders are encouraged to attend.

A. Lawn Damage/Property Damage

• If the delivery of materials or any other work necessitates the contractor, his suppliers, or sub-contractors to drive on the lawn for ANY reason, the contractor shall be held responsible for the repair of the lawn.

• Personal vehicles are not to be parked on the grass.

• Any property damage caused by work performed is to be corrected to the condition existing prior to start of the job.

B. Continuity of Work/Communication/Scheduling

• Once the job has begun, it is to be worked on continuously until completed.

• If there are any delays, even if due to inclement weather, a Work Control Representative

MUST be contacted.

• Work must be completed within 90 days of receiving the purchase order.

C. House Safety

• The residence will be occupied during the job.

• The contractor must take all reasonable care to safeguard the residents and the staff.

• The contractor shall ensure all tools, materials and other items are picked up, removed or stored and are safely secured at the end of each workday.

• Any ladders, scaffolding or lifts used in conjunction with this job are to be stored to the satisfaction of the House Director at the end of the day.

• The work as indicated above shall be scheduled as not to interfered with other functions of the residence. All work performed as part of this job is to be coordinated with the House Director and Plant Superintendent listed above.

SCOPE OF WORK includes, but is not necessarily limited to the following:
1. Remove and replace rotted cedar siding
2. Resecure siding that is loose / nails have pulled through
3. Resecure soffit unless rotted or broken, then replace.
4. Pressure wash – prep for new stain
5. Caulk gaps and penetrations in the siding assembly with Formula 230 paintable caulking
6. Stain the entire exterior of the house
1. Bid price is to include all materials, labor, disposal of materials fees and site clean-up. Final acceptance of completed job will be provided by the appropriate Maintenance Supervisor.
2. Work is to be done between the hours of TBD, Monday through Friday. Contractor is advised that this is an occupied home and may be occupied during these times.
3. All tools must be controlled at all times and debris, tools and materials secured and stored at the end of each workday.
4. Any unforeseen conditions that may alter the established price are to be reported to the Plant Superintendent listed above immediately upon discovery.
5. Smoking is prohibited by contractors at all residential and program sites owned by OPWDD.
6. Prior to the commencement of the work, there shall be a meeting with FLDDSO Operations and Maintenance staff to discuss specific safety requirements needed to be adhered to during the work period.
7. Safety Data Sheets as applicable will be provided to the Plant Superintendent prior to the start of work and a copy maintained at the property.
8. All applicable environmental testing associated with this work will be provided to the contractor prior to start of work.