Scope of Work.docx

DOCX document 38 KB Posted

Attached to
Vault Toilet Pumping for GMUG NF
Solicitation number
1240LQ22Q0024
Issued by

View the file

Other files

File Type Posted
Sources Sought GMUG VTP BPA.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope of Work

1. Background The U.S.D.A. Forest Service, Grand Mesa, Uncompahgre and Gunnison National Forests (GMUG NFs) have a requirement for Vault Toilet Pumping. The GMUG NFs seek to streamline the acquisition process by taking advantage of strategic procurement of these services.

2. Description of Agreement Multiple Blanket Purchase Agreements (BPA) will be established to provide for Vault Toilet Pumping at USDA Forest Service managed recreation sites located in Delta, Gunnison, Hinsdale, Mesa, Montrose, Ouray, and Saguache Counties, Colorado as identified in the Schedule of Items. The contractor shall provide all personnel, equipment, tools, materials, vehicles, supervision and other incidentals necessary to perform the services listed.

The BPA will be reviewed annually.

These services are normally required before and during the operating season, which normally runs from June 1st through October 30th annually. Some locations also require services at the end of each season. Additionally, some toilets are located at winter trailheads and may require winter pumping. Emergency services will be performed on a call as needed basis. Occasional emergency pumping may be required outside the normal work day constraint. Response time for any emergency will be by mutual agreement between the Government and Contractor.

The number of sites and frequency of service may be increased or decreased throughout the life of the BPA and are subject to the changes clause.

There are several different vault toilet designs including:

• Single unit/single vault

• Double unit/double vault

• Double unit/single vault

• Septic Systems

All vaults have a maximum capacity of 1000 gallons and need pumped when they reach 80% Capacity, with 90% of the vault contents removed per standard commercial practices. All vault waste shall be disposed of at a commercial treatment facility off National Forest Lands. Applicable OSHA, State and Local laws and regulations will be followed. It shall be the responsibility of the Contractor to secure permission from local municipal plants to add such waste to their system with any cost to be at the Contractor’s expense.

3. Extent of Obligation The Government is only obligated to the extent of authorized calls actually placed against this BPA by authorized personnel, against authorized items.

4. Purchase Limitations BPA Calls should not exceed $250,000 annually.

The limitation for each individual call order under this BPA shall not exceed $50,000.

5. Individuals Authorized to Purchase Under this BPA

-Molly Donoghue – Purchasing Agent/Buyer
-Any Intermountain FPO Contracting Officer/Contracting Specialist/Purchasing Agent
-Recreation Program Manager – Supervisor’s Office*

*If the Recreation Program Manager is ordering under this BPA, they must first contact FPO CO/CS/PA and follow up with a requisition in IAS within 5 business days.

(An updated list will be attached yearly)

6. Delivery tickets All shipments under this agreement shall be accompanied by sales slips/invoices that shall contain the following minimum information:

(i) Name of supplier.

(ii) BPA number.

(iii) Date of purchase.

(iv) Purchase/Call number.

(v) Itemized list of supplies or services furnished.

(vi) Quantity, unit price and extension of each item, less applicable discounts.

(vii) Date of delivery or shipment.

Dump tickets, or other proof of proper disposal, may be requested to verify means of proper disposal. Tickets must be furnished within 48 hours via hard copy, scan/email, or fax to designated Forest Service representative. Tickets must show the location(s) from which the sewage was pumped.

7. Warranty Not Applicable

8. Invoices Invoices must be submitted every 30 days during the operating season.

An individual invoice will be required for each delivery or as specified and allowed by each call. The “Submit Invoice-to” address for all orders is the Department of Treasury’s Invoice Processing Platform (IPP). The Contractor shall register and submit all invoices via IPP unless otherwise noted in an individual call. This platform is managed by the U.S. Department of Treasury and additional information is available at this website: https://www.ipp.gov/index.htm.\

Vendors register at: https://www.ipp.gov/vendors/enrollment-vendors.htm to establish an account.

9. Placement of Calls Calls placed against this BPA may be shipped directly to the Vendor. Agency personnel authorized to place calls against this BPA MUST furnish a list of calls placed to the COR and Contracting Officer monthly.

10. Completion Date of Calls The completion date for calls shall be established when each call is placed.

11. Payment and Acceptance Will be stated and defined on a call-by-call basis. Payments will be made through (Electronic Funds Transfer (EFT) via IPP (see Paragraph 8 above) unless otherwise noted on a specific call.

12. Cancellation of BPA The United States Government reserves the unilateral right to cancel this BPA by providing written notification to the Contractor.

The Contractor may withdraw from this BPA upon written request to the Contracting Officer. Withdrawal from the BPA does not affect awarded calls.

13. Points of Contact and Mailing Address Molly Donoghue, Purchasing Agent USDA Forest Service 1617 Cole Blvd. Building 17 Lakewood, CO 80401 molly.donoghue@usda.gov

14. Period of Performance The agreement shall be reviewed annually before the anniversary of its effective date and revised as necessary to conform to the requirements of the Federal Acquisition Regulation.

15. Modifying the BPA This Blanket Purchase Agreement shall be changed only by modifying the agreement itself and not by individual orders issued under it. Only the Contracting Officer, or their designated successor, may modify this BPA.

16. Technical Specifications Pumping Procedures when an outside Manhole is Available As long as the outside pump-out access is in excess of 20 inches in diameter (or 20 inches square) the Contractor shall not be allowed to remove the vault contents through the toilet riser.

After removing the manhole cover, use the clam rakes or long handles grabber to remove as much of the debris as possible before trying to pump out the waste. This procedure will help stir up the contents of the vault and breakup the dense concentration of waste typically located just under the toilet riser (the impact zone).

By removing most or all of the debris before pumping, the Contractor will find that the hose will not clog so often and the liquid portion of the contents will not be removed before the thicker solids are removed.

All Debris Removed From The Vault Shall Be Placed Into A Leak Proof Container So That No Contamination To The Surrounding Ground Will Result.

If the bottom of the vault is flat, then the waste shall be removed down to within 4-5 inches of the bottom. At this point the hose will begin to suck air (vortexing) and further removal will be slow. At this time remove any further debris that was not removed during the initial raking and removal. Using a high pressure jet washer system, wash down the interior walls of the vault before the clinging debris has a chance to dry. If at this time there is a heavy concentration of solids on the bottom of the vault, use the high pressure jet washer system to break up and dilute the solids and then pump this diluted waste, down again until the suction hose begins to suck too much air to make further pumping practical. The flat bottomed vault shall now be pre-charged with enough clean, fresh water to bring the depth of water up to 10 inches.

If the bottom of the vault is sloped (all vaults should be sloped a minimum of 1 inch per ft.), then pump the waste down (at the deep end) to where the hose begins to suck air. Remove any remaining debris and then go inside the building with the high pressure jet washer system and wash the remaining waste down the sloped bottom. Wash down the vault walls from inside the building or from the outside manhole, whichever is easier. Now pump out the remaining waste and the water that was just added by the high pressure jet washer until the suction hose begins to suck too much air to make further pumping impractical.

Pre-charge the vault with clean, fresh water so that there is 10 inches of water covering the bottom under the toilet riser. Add the recommended amount of Citrus deodorizer (or equivalent) to deodorize the remaining vault contents.

Thoroughly clean and disinfect all contaminated areas resulting from the pumping process. Either sweep or wash all waste that is deposited on the concrete surrounding the manhole cover, back into the vault if possible. The waste that runs off the edge of the concrete, onto the dirt or into the gravel edge, will be an attractant for flies, a potential health risk and an odor problem. This problem should be avoided. Clean thoroughly around the manhole cover gasket area and replace the cover. The manhole cover MUST fit with an airtight seal so that the venting process of the vault toilet is not interfered with. If there is not an airtight seal, the Contractor shall notify the COR and District Representative.

Pumping Through the Toilet Riser When There Is No outside Manhole The Contractor shall remove the toilet riser prior to pumping or removing debris. The Contractor shall not remove debris through or pump through the toilet riser without removing the riser. Remove the debris and pump in accordance with 4-1.

Extra care shall be taken to prevent waste spillage onto the interior floor and wall surface while removing debris and while pumping. The toilet paper dispenser and toilet riser shall be protected from damage and the toilet paper shall be covered with a waterproof material prior to removing debris or pumping, in order to prevent the paper from getting contaminated.

During the final cleanup, the interior floor surface and any wall surface that was contaminated by waste shall be thoroughly disinfected. Again, every effort shall be made to sweep or wash the spilled waste back into the vault. The Contractor shall not allow the spilled waste to be washed or swept out through the front door because the waste will collect at the edge of the concrete and the dirt (or gravel) will become an attractant for flies, a possible health risk for barefoot persons and an odor problem. Thoroughly wash and disinfect both the inside and outside of the toilet riser and the seat and cover before replacing the riser. The toilet riser and seat shall be dry before the Contractor leaves the work site. Remove the waterproof covering that was protecting the toilet paper and make sure the paper did not get contaminated. If the paper did get contaminated, The Contractor shall notify the COR or District Representative. The door handles or knobs shall also be disinfected and dry before the Contractor leaves the job site.

Each unit shall be available for immediate use after the pumping and final cleanup. The Contractor shall not leave any toilet location until final cleanup is accomplished.

Offsite Disposal of Sewage and Debris The Contractor shall be properly licensed and shall be responsible for making disposal arrangements, including disposal of all effluent, debris, and trash, and payment of all fees.

Disposal shall conform to all Federal, State and Local laws and ordinances. COR shall approve all disposal sites before pumping begins.

The Contractor shall be responsible to prevent spillage and to haul all waste material (sewage and debris) in watertight containers. Handling of all waste material shall be in accordance with all applicable health regulations.

“The Contractor shall dispose of all effluent in a State approved water disposal facility and shall furnish certifications of written evidence that only such approved facilities are used. Dumping at sanitary landfills shall not be permitted. No septic or vault waste shall be dumped on agricultural lands or private properties. Dumping shall only occur in Forest Service lagoons with written approval.”

Conduct of Personnel The Contractor and his/her employees shall make every reasonable effort to prevent interference with the normal use and occupancy of recreation areas while engaged in the performance of the agreement. Due to the nature of the duties under the agreement, the Contractor and his/her employees shall keep themselves and equipment presentable at all times. The Contracting Officer may, in writing, require the Contractor to remove from the work site any employee the Contracting Officer deems incompetent, careless, discourteous to the public or is otherwise objectionable, or for theft, possession and/or removal of materials, supplies, equipment or any Government-owned property.

Resource Damage Any damage or defacement that occurs to government property or land resources during the Contractor’s operations shall be repaired at the Contractor’s expense to its original condition. Onsite Inspection will be made by the COR or District Representative prior to acceptance of work.

File details come from the government source that posted it. Updated .