Scope of Work.docx

DOCX document 29 KB Posted

Attached to
Off Grid Systems Federal contract opportunity
Solicitation number
W50S8N22Q0021
Issued by
Department of the Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Off Grid Systems, newest first.
File Type Posted
Directions to Range 48 SMALL TRACTOR TRAILER TRUCKS.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fort Drum Range 48 Off Grid System Improvements

SCOPE OF WORK

OFF GRID SOLAR PHOTO VOLTAIC SYSTEMS

PART 1 GENERAL

1.01 SECTION INCLUDES

A. This specification is Equipment only specification for the main components for (4) off grid photovoltaic systems as detailed below. Each system shall consist of PV Panels (Modules) that collect solar radiation, DC to AC Power Inverter to Convert DC solar electricity to AC Power, a battery bank for storage of energy, and connections to existing generators for auto-generator start when the battery bank reaches a set voltage. The total quantities of these items are described in Part 2.

Base Bid - Provide the following materials necessary to install (4) completely functional off grid photovoltaic systems at the Fort Drum Range 48.

Base Bid will include:

1. (4) Battery banks to provide 1600Ah at 24VDC each

2. (4) Inverter/Charger units, 3500W 120VAC output, to connect to the existing 120V, Single Phase Equipment at the site.

3. (4) 60A Charge Controllers.

4. (4) Photovoltaic arrays, sized to adequately charge the system battery bank

5. (4) System Controllers with Auto-Generator Start. Settings to be agreed upon with the Owner.

6. Appropriate electrical equipment, wiring, conduit, and connections to make the system fully functional.

1.02 REFERENCES

A. IEC 61215 – Mono Crystalline Photovoltaic (PV) Modules - Design Qualification and Type Approval.

B. UL 1703 – Flat Plate Photovoltaic Modules and Panels.

C. UL-1741 – Standard for Static Inverters and Charge Controllers for use in Photovoltaic Systems.

D. ANSI Z21.83 – Performance and Safety of Solar PV.

E. NFPA 853 – Solar PV installations near Buildings.

F. NEC 2017

1.03 SUBMITTALS

A. Submittals shall be provided for all main system components, including but not limited to: Photovoltaic Modules, Inverters/Chargers, Charge Controllers, Batteries, and System Controllers.

B. Product Data: Manufacturer's data sheets on each product to be used.

1.04 QUALITY ASSURANCE

A. Manufacturers Qualifications: Manufacturer’s of all equipment shall be those regularly involved in the manufacturing of Photovoltaic System Equipment.

B. Distributor’s Qualifications: Distributor’s shall be those able to deliver the quantity listed in the provided systems in a timely and efficient manner.

PART 2 PRODUCTS

2.01 GENERAL REQUIREMENTS

A. All products and equipment supplied under this specification must meet the minimum specifications of Bid Specifications.

2.02 PHOTOVOLTAIC MODULE

A.LG Electronics 355W
Cells: Monocrystalline silicon, 60 in series
Dimensions: 40.1” x 64.0” x 1.81”
Weight: 44 lbs
Output Cables: PV wire per UL4703 with MC4 Connectors
Maximum Power at STC (Pmax): 265 W
Open Circuit Voltage (Voc): 38.2 V
Optimum Operating Voltage (Vmp): 31.7 V
Short-Circuit Current (Isc): 7.35 A
Optimum Operating Current (Imp): 6.76 A
Maximum (DC) System Voltage: USA NEC 1000 V
Series Fuse Rating: 15 A
Warranty: 25 Year Limited

Qualifications: UL 1703 Compliant

2.03 INVERTERS

A.Fronius Symo 12.0-3 208-240 Three Phase
DC Maximum Voltage: 600 V
DC Maximum Usable Input Current: 41.5 A
AC Output Voltage: 208 V
AC Maximum Output Power: 11,995 VA
AC Maximum Output Current: 33.3 A
Peak Efficiency: 97.0%
Warranty: 10 Year (Extended)

Qualifications: UL 1741-2010, UL 1998 and IEEE-1547 Compliant

NEMA 4X

2.04 BATTERY BANKS

A.XRS Rail
1. Item:51-7000-168A, as provided by IronRidge, or approved equal.
2. Length:168”.
3. Material:6105 – T6 Aluminum.
4. Finish:Mill.

2.05 WIRING

A. Wiring Requirements

1. #10 AWG THHN/THWN conductors and #6 AWG ground from sub-arrays to inverters, or approved equal.

2. #8 AWG THHN/THWN conductors and #6 AWG ground from inverters to AC Combiner, or approved equal.

3. #300 MCM conductors and #6 AWG ground from AC Combiner to AC Disconnect, or approved equal.

4. #500 MCM conductors and #6 AWG ground from AC Disconnect to existing 208V 3 Phase Disconnect, or approved equal.

B. Conduit Requirements

1. 1.5” PVC conduit from sub-array inverters to combiner, or approved equal.

2. 3” Rigid conduit from combiner to AC Disconnect, or approved equal.

3. 3.5” Rigid conduit from AC Disconnect to existing 208V 3 Phase Disconnect, or approved equal.

PART 3 EXECUTION – NOT USED

END OF SECTION

RFP – Off Grid Solar Photo Voltaic Systems Page 3 of 3