Scope_of_Work.docx
DOCX document 15 KB Posted
- Attached to
- RFQ61024-561697 Truck Bed Modification
- Solicitation number
- 0610561697
- Issued by
- California
About this file
This document is a Scope of Work for a Request for Quotation (RFQ #61024-561697) issued by the California Department of Rehabilitation. The Department seeks to procure goods and services to convert a personal use pickup truck to a work truck for welding, including a customized truck bed, toolboxes, a gooseneck trailer hitch, and work light. The required services include removing the existing truck bed, installing the new bed and accessories, and performing various modifications and installations. Bidders must provide itemized hourly rates and hours for the specified services.
The contract opportunity is open to all qualified vendors. Pricing terms, set asides, incumbents, and funding details are not provided in the scope of work. The contract term is not specified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work Truck Bed Modification
RFQ# 61024-561697
The Department of Rehabilitation has identified the need to procure the following goods and services necessary to convert a personal use pickup truck to a work truck for welding:
Parts:
1. Customized truck bed approximately 84” x 90”
2. Toolboxes
· Two underbody toolboxes measuring approximately 48”L X 18”W X 18”H
· 4’ x 6’ Rimrock toolbox (or equivalent)
3. Gooseneck trailer hitch
· Customized trapdoor on truck bed
4. Work Light
Truck Details:
VIN# 1GCHC23U17F117114
2007 Chevy Silverado Classic 2500 HD Crew Cab pickup with 6.5 ft bed.
Services (Must be itemized by hourly rate and number of hours):
1. Removal of existing truck bed and installation of new truck bed, locking toolboxes, and other parts/accessories listed above. Services/labor must be itemized by hourly rate and number of hours.
2. Fuel hose modification.
3. Fuel box modification (if required).
4. Mud flaps mounting.
5. Installation of underbody toolboxes.
6. Gooseneck trapdoor installation.
7. Work light installation.
8. Safety Inspection.
File details come from the government source that posted it. Updated .