Scope of Work - Corning G1 2025_Updated.docx
DOCX document 27 KB Posted
- Solicitation number
- N0017425Q1075
About this file
The document is a Scope of Work for a Naval Surface Warfare Center Indian Head (NSWC IH) solicitation to procure a single rack of 4 Corning G1 Advanced Flow Reactor modules. The solicitation (RFQ N0017425Q1075) is a small business set-aside with a maximum budget of $250,000, seeking a firm fixed-price purchase order for a brand-name mandatory or "equal" advanced flow reactor system. Key technical requirements include four parallel-cooled fluidic modules with flexible configuration, using PFA Swagelok parts, and capable of dosing/mixing and residence time plate functionality.
The procurement timeline requires vendor delivery within 90 days of order receipt, with quotes due by July 25, 2025, at 3:00 PM EST. The evaluation will be conducted on a lowest price technically acceptable (LPTA) basis, considering technical compliance and pricing. Delivery is to be made to Naval Surface Warfare Center Indian Head Division in Maryland, with technical points of contact being David Boruta and LiAnna Mearing. The solicitation is issued by the Department of the Navy Naval Sea Systems Command, with NAICS code 334516 and a business size standard of 1,000 employees.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF 1449 - N0017425Q1075.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work (Corning G1 Advanced Flow Reactor)
1.0 GENERAL
Naval Surface Warfare Center Indian Head (NSWC IH) Manufacturing Department (Code M42) is seeking to procure a single rack of 4 G1 Advanced Flow reactor modules.
2.0 REQUIREMENT
This project/contract includes one main component:
1. Procurement of skid-mounted Corning G1 Advanced Flow Reactor consisting of 4 AFR fluidic modules.
Minimum requirements: The mounted Corning G1 Advanced Flow Reactor must consist of 4 fluidic modules. The 4 fluidic modules must be cooled in parallel. All four fluidic modules must be flexibly configurable between dosing/mixing plates and residence time plates – providing Swagelok PFA endcaps close off injection ports is acceptable to achieve this. All plastic Swagelok parts used must be PFA.
3.0 SHIPPING
The vendor shall be responsible for shipping container design and purchase of all packing and packaging materials. The packing shall prevent any damage which may occur during transit.
4.0 DELIVERY SCHEDULE
Vendor shall deliver within 90 days upon receipt of order.
The Vendor shall notify the Contracting Officer 30 days in advance if the Vendor cannot meet the contract delivery schedule.
The Vendor shall be responsible for coordinating and shipping all the material to the required destination.
Delivery address provided below:
Naval Surface Warfare Center Indian Head Division 4522 McMahon Road Bldg. 116, Suite 100 Indian Head, MD 20640
Point of Contact Technical POC’s:
David Boruta, Ph.D.
Building 855 3019 Strauss Ave Indian Head, MD 20640
(301) 744-4106
LiAnna Mearing Building 765 3655 Nitramine Way Indian Head, MD 20640
(301) 744-1399