Scope of Work Arkabutla Lake Water Plant Rehab and Pre-fabricated Building Installation.pdf
PDF 378 KB Posted
- Solicitation number
- W912EE27QA002
About this file
This is a Performance Work Statement/Statement of Work for a water plant rehabilitation project at Arkabutla Lake Project administered by the U.S. Army Corps of Engineers (USACE). The contractor must complete all work within 120 days of contract award on a turnkey basis, providing all labor, tools, equipment, transportation, materials, and incidentals.
The scope includes: abandoning the old well; installing new plumbing per AWWA C-509 specifications including valves, flange fittings, a Watts 2" pressure reducer, 2" flange master meter, Stenner model 45MHP10 chemical pump, 3-phase air compressor, and associated fittings; purchasing, delivering, and installing one 30'x50' pre-fabricated metal Red Iron open-span building with 12' eaves, 26-gauge roof and walls, one roll-up door, one 3'x7' walk-through door, insulation, and gutters (including engineer-stamped drawings and anchor bolt plans); sandblasting and painting the tank with specified Tnemec coatings; and installing new electrical systems including a 200-amp enclosed circuit breaker (2020 NEC compliant), 200-amp main breaker panel, pump control panel with motor starter, six LED strip lights, two 55-watt outside lights with photocells, ten 120V outlets including an outside GFCI, 3-phase air compressor circuit, and reconnection of existing pressure controls. Delivery is FOB Destination to Arkabutla Lake Project, 5500 Arkabutla Dam Road, Hernando, MS 38632, with contractor-arranged delivery between 0700-1630 Monday through Thursday (except federal holidays) with 48-hour advance verbal notification to Point of Contact Billy Fowler. The contractor must maintain a one-year limited warranty, remove all demolition debris per industry standards, and comply with security requirements including background vetting, security training within 30 days of award, E-Verify verification, and suspicious activity reporting protocols. Invoices should be mailed to USACE Finance Center in Millington, TN with copies emailed to the Arkabutla Lake Field Office.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement / Statement of Work
For Arkabutla Lake Project
WATER PLANT REHAB – SUPPLY & INSTALL
Scope of Work.
Arkabutla Lake Project has previously had a new well installed and now requires the old well to be abandoned and the surrounding small 30 x 50 metal building to be rehabbed to continue to protect the new well. The USACE personnel will perform prep work prior to delivery and install by removing old building where replacement Pre-fabricated building will be delivered and installed.
This location is in a open recreation area that is open to the public at all times. It is not located within a secure area or a personnel only area at Arkabutla Lake Project.
The contractor shall provide all labor, tools, equipment, transportation, parts, materials, and other incidentals necessary to provide this complete turn key work within 120 days of award:
General Specifications:
Abandon old well Install new plumbing includes valves to meet AWWA C-509 specs, flange fitting to meet
AWWA specs, watts 2” pressure reducer, 2” flange master meter, Stenner model 45MHP10 chemical pump, 3 phase air compressor, accessories and fittings to connect and create a working system
Purchase, deliver, & install one (1) 30’x50’ pre-fabricated metal Red Iron open span building with 12’ tall eaves, 26-gauge roof & walls, one (1) roll up door, one (1) 3’x7’ walk through door, insulation, and gutters. Building will include engineer’s stamped drawings for the building and a set of anchor bolt plans.
Sand blast and paint tank with one (1) coat Tnemec-Zinc 3-5ml inside and out. Second coat inside Tnemec series 21 6-9ml. Third coat inside Tnemec series 216-9ml. Second coat outside L140 epoxy 6-9ml. Third coat outside 1094 urethane 5-7ml.
Install new electrical including 200-amp enclosed circuit breaker outside (2020 NEC requirement), 200-amp main breaker panel inside, pump control panel with motor starter to control well, disconnect at well, six (6) 8” long LED strip lights, two (2) 55 watt outside lights with photocell, ten (10) 120V outlets including an outside GFCI, 3 phase circuit for air compressor, and reconnect existing pressure controls on tank
DELIVERY: ARKABUTLA LAKE PROJECT, MS –contact: Billy Fowler 662-292-1984. 5500
ARKABUTLA DAM ROAD, HERNANDO MS 38632
Freight FOB: Destination. Price includes delivery, off-loading at the designated stockpile location.
Arrangement of Delivery of Service will be made to Arkabutla Lake Field Office at said address within 120 days upon award. The contractor shall use extreme caution around the building and work area to ensure utility lines or structures aren’t damaged. Contractor shall deliver all equipment in a professional manner based on product specifications to ensure structure is safe for employee utilization.
GUARANTEE
LIMITED WARRANTY AND WARRANTY DISCLAIMER for a period of one (1) year from date of delivery only that the material sold hereunder substantially complies with specifications.
ADDITIONAL UNKNOWN NEEDS:
Hours of Operation: The contractor shall DELIVER between the hours of 0700 and 1630 Monday through Thursday (except federally observed holidays) AND give verbal notification to the POC Billy Fowler no less than 48 hours prior to scheduled delivery. During the process of service - the site will be kept clean of debris and trash.
Refuse Removal: Inspection and Acceptance of completed service will be done by the P.O.C. Billy Fowler.
Removal of demolished materials will be done by the contractor in compliance with industry standards.
SECURITY REQUIREMENTS FOR UNCLASSIFIED CONTRACTS
General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor (“Contractor”) and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (e.g., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements;
all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as “RAMs”), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures, to include identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clause of this contract, should the FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.
Physical security and access control requirements: All contract personnel requiring physical access to a federal installation or facility shall comply with the access control procedures of that location. Contract personnel requiring unescorted access to meet contract performance requirements on a DoD installation in the US shall be vetted by the installation/facility Provost Marshal/Directorate of Emergency Services/Security Office using the National Crime Information Center-Interstate Identification Index (commonly referred to as “NCIC-III”) and Terrorist Screening Database (commonly referred to as “TSDB”). Contract personnel shall comply with all personal identity verification requirements specified in installation/facility policies and procedures. Contract personnel who do not meet requirements for unescorted access to USACE facilities shall coordinate escorted access with the Government representative, as needed. Contract personnel who receive keys, access cards, or lock combinations that provide access to government-owned property shall comply with key and lock control procedures of the RA.
Suspicious Activity Reporting training (e.g., iWATCH, CorpsWatch, or See Something, Say Something):
All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.
Escorting in classified and/or sensitive areas: In accordance with applicable regulations, all contract personnel who do not possess the appropriate security clearance or access privileges will be escorted in areas where they may be exposed to classified information or operations, sensitive information or activities, or restricted areas.
Pre-screen candidates using E-Verify Program: Contractors shall comply with the requirements set forth in FAR clause 52.222-54 Employment Eligibility Verification and FAR Subpart 22.18 in using the E-Verify Program at (https://www.e-verify.gov/) (website subject to change) to meet the contract employment eligibility requirements. Contractors are encouraged to cooperate with Federal and State agencies responsible for enforcing labor requirements to include eligibility for employment under United States immigration laws in accordance with FAR 22.102-1(i). An initial list of verified/ eligible candidates shall be provided to the COR no later than three business days after the initial contract award.
Note: When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification, and submit it to the Contracting Officer to become part of the official contract file.
Non-U.S. Citizens working on Government Contracts: Government Approval MUST be obtained PRIOR to any non-U.S. Citizen being permitted to work on a government contract. The Contractor must submit a letter requesting approval via the Contracting Officer/Contracting Officer Representative to the Vicksburg District Security Officer. The letter must include the contract number, period of performance, location(s) of work performance and attach a copy of the individual’s passport and visa/work authorization documents.
Inspection and Acceptance: Price shall include delivery and acceptance at the location of Arkabutla Lake Project Office: 5500 Arkabutla Dam Rd., HERNANDO, MS 38632.
DELIVERY INFORMATION:
DELIVERY SHALL BE MADE WITHIN (120) DAYS OF RECEIPT OF PURCHASE ORDER.
U.S. ARMY CORPS OF ENGINEERS
ARKABUTAL LAKE FIELD OFFICE
3905 ARKABUTLA DAM RD.
COLDWATER, MS 38618
MAIL ORIGINAL INVOICES TO:
USACE - FINANCE CENTER
ATTN: DISBURSING
5722 INTEGRITY DRIVE
MILLINGTON, TN 38054-5005
MAIL & EMAIL A COPY OF ALL INVOICES TO:
USACE – ARKABUTLA LAKE FIELD OFFICE
ATTN: AMY MCADAMS
3905 ARKABUTLA DAM RD.
COLDWATER, MS 38618
Amy.r.mcadams@usace.army.mil Tonya.L.Nathan@usace.army.mil Jamie.a.hissong@usace.army.mil Billy.r.fowler@usace.army.mil
File details come from the government source that posted it. Updated .