Scope of work-ANT.doc

DOC document 91 KB Posted

Attached to
Provide Drywall repair at USCG ANT Crisfield
Solicitation number
41901RFQ250000014
Issued by

About this file

This document is a Scope of Work (SOW) for drywall repair at the U.S. Coast Guard Auxiliary Training (ANT) station in Crisfield, Maryland. The project requires the contractor to remove existing drywall, inspect and replace up to 110 linear feet of ceiling joists, replace approximately 170 square feet of drywall, and paint to match the existing color at 810 Norris Harbor Drive. The work must be completed within 10 days of contract award, with the contractor required to use corrosion-resistant materials suitable for a salt air environment and comply with all applicable environmental and safety regulations.

Key requirements include daily cleanup, notification of work start dates, providing a detailed employee list to security, and adhering to OSHA safety standards and EPA environmental guidelines. Site visits are strongly encouraged, and interested parties must contact MK2 Christopher Borrelli at (267) 664-2035 to arrange an inspection. The solicitation is issued by the Department of Homeland Security's U.S. Coast Guard, with no previous incumbent, and requires submission of an SF-1442 form and technical capabilities documentation not exceeding 5 pages.

View the file

Other files

File Type Posted
Amendment 0001.pdf PDF
Amendment 0001 Attachment Page.docx DOCX document
_SF-1442 RFQ.pdf PDF
Wage rate determination.pdf PDF
Construction Provisions_and_Clauses.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCOPE OF WORK CEU Work Order

ANT FEMALE HEAD

PN#

1. GENERAL REQUIREMENTS: The work consists of providing all labor, materials, equipment, and safety equipment as required to Repair female head ceiling at USCG ANT Crisfield; 810 Norris harbor DR, Crisfield, MD 21817.

2. COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK: Upon acceptance the contractor shall commence work NLT 5 days after notice to proceed and work diligently to complete the entire work ready for use by 10 days after contract award.

3. SCOPE OF WORK: The Offeror shall:

3.1: Removal of existing drywall. Inspect ceiling joist for rot or damage Replace up to 110 linear feet of ceiling joist. Replace approximately 170 square feet of drywall and paint to match existing color. Any interferences removed during the scope of work are to be reinstalled at original location and be operational.

Please Note:

1. All work will be conducted in accordance to and in compliance with any/all applicable local, state, and federal environmental regulations.

2. All materials and fasteners installed throughout the entirety of this Scope of Work shall be installed using materials that are conducive to a salt air environment and are corrosion resistant.

3. Contractor shall dispose of unused materials/ debris offsite IAW any/all Federal, State, and/or local regulations.

4. SITE VISIT: All bidders are strongly encouraged to visit the site to verify any/all quantities before submitting bids. Interested parties shall make arrangements for a site visit with MK2 Christopher Borrelli @ (267) 664-2035.

5. DESIGNATED CONTRACTING OFFICER’S QA EVALUATOR (QAE) REPRESENTATIVE: The designated contracting officer’s QAE representative and Point of Contact for this project is MK2 Christopher Borrelli @ (267) 664-2035. Inquiries concerning any phase of the specification before or after award shall be made to MK2 Christopher Borrelli.

6. CONDITIONS AFFECTING THE WORK: The Offeror should visit the site and take such other steps as may be reasonably necessary to ascertain the nature and location of the work, the general and local conditions which can affect the cost of the work thereof. Failure to do so will not relieve bidders from responsibility for estimating properly the difficulty or cost of successfully performing the work. The government will assume no responsibility for any understanding or misrepresentations concerning conditions made by any of its officers or agents prior to the execution of the contract, unless included in the request for quotes, the specification or related documents.

7. AFTER AWARD OF THE CONTRACT: The contractor must immediately notify the contracting officer’s QAE representative of his intended start date. The work shall be done in accordance with the specification.

8. ORAL MODIFICATION: No oral statement of any person other than the contracting officer shall in any manner or degree, modify, or otherwise affect the terms of this contract.

9. WORKMANSHIP: All work shall be accomplished with the best standard practices, and by workmen thoroughly experienced in the required trades. The work shall be supervised by experienced personnel and shall be satisfactory to the Contracting Officer.

10. PERMITS: None.

11. CLEAN UP: All trash and debris shall be removed from the site daily. The job site shall be left in a clean and neat manner.

12. WORK OUTSIDE REGULAR HOURS: If the contractor desires to carry on work on Saturday, Sunday, holidays or outside the unit’s regular hours, must submit their request in writing to the Contracting Officer’s QAE Representative for approval consideration. The contractor shall allow ample time to enable satisfactory arrangements to be made by the government for inspecting the work in progress.

13. UPON COMPLETION OF WORK: Contact the Contracting Officer’s QAE Representative to arrange for inspection/acceptance of work.

14. IDENTIFICATION OF CONTRACTOR PERSONNEL AND VEHICLES: The contractor shall provide a detailed list of all employees to the QAE Representative five (5) days prior to commencing work. The employee list shall contain the employee’s full name, date and place of birth, current address and last four (4) of SSN. The Station Oak Island Security Officer will be given a copy of the employee list. Each contractor provided vehicle or towed trailer shall show the contractor’s name so that it is clearly visible on the vehicle. A valid state license plate and safety inspection sticker is required. All vehicles operated on government property shall be maintained in a good state of repair.

15. SAFETY REQUIREMENTS:

a. All contractors working on USCG ANT Crisfield shall abide by all federal safety regulations as published by the Occupational Health and Safety Administration, 29 CFR 1910 (series) and 29 CFR 1926 (series). Contractor written safety programs shall be reviewed by the Base Safety Officer prior to starting work.

b. Written notification must be provided to the CG ANT Crisfield Base Safety Officer, MK2 Christopher Borrelli in their capacity as Fire Marshal of any activity that could potentially cause fire or explosion or that changes or reduces the capability of fighting a fire or explosion. Some examples of qualifying activities are: a fire hydrant or fire suppression system that must be taken out of service for any reason, electrical work that affects fire alarm systems, introduction of hazardous or flammable material onto the unit, and blocking of any egress routes or emergency vehicle routes. Inclusion of this information in the contract constitutes written notification as long as the outsource review sheet is signed by Base Safety Officer.

c. Copies of the following must be provided to the Base Safety Officer prior to starting work in affected areas: Confined Space Entry Permits, Hot Work Chits, and Dig Chits. Confined space clearance must be conducted by a certified marine chemist and permit required spaces will have a copy of the permit posted on site during work. Hot work will only be conducted with permission and a fire watch must be posted during work.

d. Lock Out/Tag Out requires notification and coordination with facilities and will not be conducted by a contractor on CG Crisfield. A Facilities Division representative is required for all contractors Lock Out/Tag Out needs.

e. Rights: Every employee working on CG ANT Crisfield has the right to a safe and healthy workplace. The contractor has the responsibility and right to stop unsafe work. QAE’s and the Safety Officer may also institute a work stoppage relating to unsafe practices or immediate danger to life and health situations.

16. ENVIRONMENTAL PROTECTION REQUIREMENTS:

a. All contractors working on CG ANT Crisfield shall abide by all federal environmental regulations as published by the Environmental Protection Agency, 40 CFR (series). Contractor written environmental management and pollution prevention programs shall be reviewed by the Environmental Protection Specialist MK2 Christopher Borrelli @ (267) 664-2035 prior to starting work and must be in accordance with the Unit Environmental Guide.

b. Written notification must be provided to the Environmental Protection Specialist of any activity that could potentially cause a permit violation on CG ANT Crisfield. Some examples of qualifying activities are: any activity that could result in a spill or discharge into a waterway or introducing a hazardous material into the environment.

c. Copies of the following must be provided to the Environmental Protection Specialist prior to starting work in affected areas: Safety Data Sheets, permits, and notices of intent.

d. Hazardous materials used by a contractor are required to be disposed of by that contractor. Disposal must be in accordance with federal, state, and local guidelines.

17. PICTURES: