Scope of Work-2024_HIePRO Incinerator removal Specs.pdf
PDF 96 KB Posted
- Attached to
- Q24001672 Incinerator dismantle and removal
- Solicitation number
- Q24001672
- Issued by
- Honolulu County, Halawa CDP, Hawaii
About this file
This document contains the Scope of Work for the removal and disposal of an ECO WASTE-500 -T2 Incinerator located at the Animal Industry Division of the Hawaii Department of Agriculture in Aiea, Hawaii. The project involves the disconnection and capping of liquid propane gas lines, disconnection of the electronic starter, and the complete dismantling and removal of the incinerator with minimal impact to the existing concrete slab. The project is to be completed within 180 calendar days from the purchase order date. Two pre-bid conferences will be held on March 7 and March 8, 2024, from 8:30 am to 10:00 am, during which contractors can inspect the work area. Vendors must be compliant with the Hawaii Compliance Express at the time of award and payment.
The total bid amount must include all applicable taxes, fees, and preparation costs. The contract will be awarded to the lowest responsible bidder, subject to the availability of funds. No other specific pricing terms, set asides, incumbents, or funding sources are provided in the document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Incinerator images-incinerator images.zip | ZIP file | |
| 103D-1 General Conditions.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Scope of Work (Incinerator Removal) Project: Disconnect, Dismantle and Removal of Incinerator
Location: Animal Industry Division, Hawaii Department of Agriculture 99-941 Halawa Valley Street Aiea, HI 96701
Contact: Raquel Wong – Raquel.L.Wong@hawaii.gov
Scope of Work:
Project to encompass the complete removal of ECO WASTE-500 -T2 Incinerator
• Disconnection and capping of liquid propane gas lines o Capping must allow for reconnection to a new incinerator
• Disconnection of electronic starter for incinerator.
• Dismantle and remove all components of the incinerator with minimal impact to the existing concrete slab.
Minor details of dismantling, removal and disposal, which are not otherwise specified, shall be left to the discretion of the vendor, who shall be solely responsible.
The removal and disposal of all materials after the project is completed.
Pre-Bid Conference:
The unit exterior is visible from Halawa Valley Street.
2 pre- bid conferences will be held:
1. March 7, 2024 from 8:30 am to 10:00 am
2. March 8, 2024 from 8:30 am to 10:00 am
Close inspection of work area is limited to the above conference times and there are no accommodations for times outside posted conferences.
Completion:
The project specified herein, shall be completed within one-hundred eighty (180) calendar days from the purchase order date.
At the time of award and at the time of payment, vendors must be compliant with Hawaii Compliance Express. Website URL to information on the requirements for compliance located here: http://vendors.ehawaii.gov
The Animal Industry Division, HDOA reserves the right to award to the next lowest bidder if compliance with Hawaii compliance express is not present at the time of award.
TOTAL BID AMOUNT SHALL INCLUDE ALL APPLICABLE TAXES, FEES AND
PREPARATION COSTS.
Award is subject to availability of funds.